| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.3 CrAccepted-AOC GRAM HAZRATPUR PO SAHKARI NAGAR DISTRICT BULANDSHAHR | BULANDSHAHR | BULANDSHAHR | UTTAR PRADESH | ₹3.3 Cr | L1 | Accepted-AOC Accepted |
| 2 | L2₹3.5 Cr+₹19.8 L (6.00%)Rejected-Finance 1 234 8 | ALIGARH | UTTAR PRADESH | 202001 | ₹3.5 Cr+₹19.8 L (6.00%) | L2 | Rejected-Finance Rejected |
| 3 | L3₹3.8 Cr+₹45.9 L (13.9%)Rejected-Finance | ₹3.8 Cr+₹45.9 L (13.9%) | L3 | Rejected-Finance Rejected |
| 4 | L4₹4.0 Cr+₹69.3 L (21.0%)Rejected-Finance | ₹4.0 Cr+₹69.3 L (21.0%) | L4 | Rejected-Finance Rejected |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹5.5 Cr
EMD Value
₹11.0 L
Closing Date
27 Feb 2025, 12:00 pmClosed
SE BSR Circle PWD Bulandshahr
SE BSR Circle PWD Bulandshahr
Widening and Strengthening of Jahangirabad-Aahar road to Siddhbaba Mandir via Mahadev Mandir in District Bulandshahr
2025_CEMRT_1004932_1
833/96M/E-Tender/BSR Circle/2024-25 dt. 28.01.2025
Open Tender
Civil Works - Roads
Item Wise
365 days
Bulandshahr
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,714
₹11.0 L
Yes
SE BSR Circle PWD Bulandshahr
5 May 2025
12 Feb 2025
27 Feb 2025
12 Feb 2025
27 Feb 2025
12 Feb 2025
12 Feb 2025 - 13 Feb 2025
13 Feb 2025
Amount
Cleaning jungle including up rooting of rank, vegetations grass, push, wood trees and samplings of grith upto 30 cms.measured at a height of 1 M. above ground level and removal of rubbish up to a distance of 50M. out side the periphery of area cleared as per item no. 259(i) Including cost of all material, labour, T&P and all taxes complete but excluding cost of GST.
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. MORT&H Specification 304 Sr No 3.13 Including cost of all material, labour, T&P and all taxes complete but excluding cost of GST.
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2. (3.17) MORT&H Specification 305 Sr No 3.16 Including cost of all material, labour, T&P and all taxes complete but excluding cost of GST.
Construction of embankment with approved material obtained from Right of way pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. (3.16) MORT&H Specification 305 Sr No 3.16 Including cost of all material, labour, T&P and all taxes complete but excluding cost of GST.
Construction of sub-grade and earthen shoulders with approved material obtained from Right of way with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2. MORT&H Specification 305 Sr No 3.18 Including cost of all material, labour, T&P and all taxes complete but excluding cost of GST.
Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401. MORT&H Specification 401 (B) Sr No 4.1 Including cost of all material, labour, T&P and all taxes complete but excluding cost of GST.
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. MORT&H Specification 406 (A) Sr No 4.14 Including cost of all material, labour, T&P and all taxes complete but excluding cost of GST.
Providing, laying and spreading of graded stone aggregate (ETA) after mixing with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying with 1% OPC cement and 3.50% Emulsion in uniform single layer on sub base/subgrade and compacting with the road roller to achieve the desire density. MORT&H Specification 406 Sr No 4.14 Including cost of all material, labour, T&P and all taxes complete but excluding cost of GST.
Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.25 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. MORT&H Specification 503 (ii) Sr. No. 5.2 Including cost of all material, labour, T&P and all taxes complete but excluding cost of GST.
Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder (VG-30) @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 B) Sr. No. 5.5 complete in all respects Including cost of all material, labour, T&P and all taxes complete but excluding cost of GST.
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. MORT&H Specification 2100 Sr No 12.04 Including cost of all material, labour, T&P and all taxes complete but excluding cost of GST.
Brick Masonry Work in Cement Mortar 1:3 in Foundation complete excluding Pointing and Plastering, as per Drawing and Technical Specifications. MORT&H Specification 1300 Sr No 12.05 Including cost of all material, labour, T&P and all taxes complete but excluding cost of GST.
Supply and fixing of 350 mm dia NP3 type Hume Pipe S&S in position including labour and T&P etc. required for proper completion of work. Including cost of all material, labour, T&P and all taxes complete but excluding cost of GST.
Supply and fixing of 600 mm dia NP3 type Hume Pipe S&S in position including labour and T&P etc. required for proper completion of work. Including cost of all material, labour, T&P and all taxes complete but excluding cost of GST.
Pointing with cement mortar (1:3 ) on brick work in substructure as per Technical Specifications MORT&H Specification 1300 & 2200 Sr No 13.02 Including cost of all material, labour, T&P and all taxes complete but excluding cost of GST.
Plastering with cement mortar (1:3 ) on brick work in sub-structure as per Technical Specifications MORT&H Specification 1300 & 2200 Sr No 13.03 Including cost of all material, labour, T&P and all taxes complete but excluding cost of GST.
Maintainance Charge including Bituminous Work, Cement Concrete work, Earth Work, Earth Work on patri, Culvert, etc as per Direction of E/I for the period of Five Year from the actual completion of work and As per GO No. 17/2024 SA-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 as per Prevailing GO Maintainance of First Year @0.00% of Total Work Amount)
Maintainance Charge including Bituminous Work, Cement Concrete work, Earth Work, Earth Work on patri, Culvert, etc as per Direction of E/I for the period of Five Year from the actual completion of work and As per GO No. 17/2024 SA-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 as per Prevailing GO Maintainance of Second Year @0.25% of Total Work Amount)
Maintainance Charge including Bituminous Work, Cement Concrete work, Earth Work, Earth Work on patri, Culvert, etc as per Direction of E/I for the period of Five Year from the actual completion of work and As per GO No. 17/2024 SA-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 as per Prevailing GO Maintainance of Third Year @0.50% of Total Work Amount)
Maintainance Charge including Bituminous Work, Cement Concrete work, Earth Work, Earth Work on patri, Culvert, etc as per Direction of E/I for the period of Five Year from the actual completion of work and As per GO No. 17/2024 SA-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 as per Prevailing GO Maintainance of Fourth Year @0.75% of Total Work Amount)
Maintainance Charge including Bituminous Work, Cement Concrete work, Earth Work, Earth Work on patri, Culvert, etc as per Direction of E/I for the period of Five Year from the actual completion of work and As per GO No. 17/2024 SA-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 as per Prevailing GO Maintainance of Fifth Year @1% of Total Work Amount)
Santosh Kumar Sharma (BID ID -4978020)
M/S V.K.Construction (BID ID -4970831)
Sansun Contractors Pvt Ltd (BID ID -4973619)
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
BOQ_1798087.xls
BOQ • 0.30 MB
163158325.pdf
Tender Documents • 0.88 MB
163158326.pdf
Tender Documents • 1.32 MB
163158328.html
Tender Documents • 0.05 MB
164164668.pdf
Tender Documents • 0.63 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .