Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹47.8 CrAccepted-Finance | ₹47.8 Cr | L1 | Accepted-Finance L1 |
| 2 | L2₹47.9 CrAccepted-Finance R W D WORKS DIVISION MAHARAJGANJ SIWAN | ₹47.9 Cr | L2 | Accepted-Finance L2 |
| 3 | L3₹50.8 CrAccepted-Finance NIRJULI SHORT CUT PO PS NIRJULI PAPUM PARE ARUNACHAL PRADESH 791109 | NIRJULI | PAPUM PARE | ARUNACHAL PRADESH | 791109 | ₹50.8 Cr | L3 | Accepted-Finance L3 |
| 4 | Rejected-Technical | - | - | Rejected-Technical Technically Non Responsive |
| 5 | Rejected-Technical | - | - | Rejected-Technical Technically Non Responsive |
Tender Value
₹60.4 Cr
EMD Value
₹60 L
Closing Date
7 Sept 2024, 5:00 pmClosed
General Manager (P)
General Manager (P) National Highways and Infrastructure Development Corporation Limited. Regional Office, 2nd Floor, Agnishanti Business Park, Opp. AGP Office GNB Road, Ambari, Guwahati- 781001
Construction of Balance Work of the 4- laning of Jamugurihat to end of Biswanath Chariali Bypass of NH- 15 from Km 182.000 to Km 208.000 (26 Km), under SARDP-NE, under EPC Mode at the Risk and Cost of EPC Contractor
2024_NHIDC_821741_1
NHIDCL/Assam/Jam-Bis/RnC/24-25
Open Tender
Civil Works
180 days
Assam
Please refer Tender documents.
5 documents required · 5 mandatory
₹11,800
NHIDCL
₹60 L
NHIDCL, RO Guwahati
25 Oct 2024
17 Aug 2024
9 Sept 2024
17 Aug 2024
7 Sept 2024
17 Aug 2024
17 Aug 2024 - 23 Aug 2024
24 Aug 2024
Amount
Construction of Balance Work of the 4- laning of Jamugurihat to end of Biswanath Chariali Bypass of NH- 15 from Km 182+000 to Km 208+000 (26 Km), under SARDP-NE, under EPC Mode at the Risk and Cost of EPC Contractor
RSM INFRA PROJECTS
NABAM TULLON LLP
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid