| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.8 LAccepted-AOC PLOT NO 58 SUNDARAM NAGAR 3RD STREET THOOTHUKUDI | ₹1.8 L | 1 | Accepted-AOC ACCEPTED |
| 2 | 2₹1.9 LRejected-AOC | ₹1.9 L | 2 | Rejected-AOC REJECTED |
| Sl No | Description | Qty | Unit | Syedsirajudeen L2 | IJ Constructions L1 |
|---|---|---|---|---|---|
| 1.00 | Dismantling Plain Cement Concrete including all cost and conveyance of labour charges etc complete., | 38 | 1M3(One Cubic Meter) | 525 ₹19,950 | 520 ₹19,760 |
| 2.00 | Supply and Delivery of 110mm HDPE Pipe (PN6) the rate includes all cost and conveyence of materials and labour charges etc., complete | 90 | 1 Mtr (One Metre) | 380 ₹34,200 | 379 ₹34,110 |
| 3.00 | supply and delivery of 110mm HDPE 90 degree bend as per is 8360/1977/ (PN6) the rate includes all cost and conveyence of materials and labour charges etc., complete | 2 | 1 No (One Number) | 570 ₹1,140 | 570 ₹1,140 |
| 4.00 | Earth work exacavtion for pipe line (110mm HDPE) trenches with proper gradient having Bed Depth of 1.05m and bed Width 0.60m in other then loose soil for 160mm dia HDPE the rate including all cost and conveyance of labour charges etc., | 25 | 1 M3 (One Cubic Metre) | 225 ₹5,625 | 220 ₹5,500 |
| 5.00 | Jointing 110mm HDPE Pipes and Specials by butt fusion welding / electro fusion welding joints using fusion equipment as per ISO 21307-2011 and as per IS 7634 (part-2) : 2012 including cost of hire charges for butt fusion equipment power supply arrangements etc., complete as per directed by TWAD Board Officers. | 15 | 1 No (One Number) | 235 ₹3,525 | 234 ₹3,510 |
| 6.00 | Lowering 110mm HDPE pipes and specials to trench and laying to proper grade and alignment and as directed by the Corporation Officers | 90 | 1 Mtr (One Metre) | 21 ₹1,890 | 20 ₹1,800 |
| 7.00 | Refilling 110mm HDPE pipe line trenches after laying the pipe without sand in the road surface the rate including all cost and conveyance of labour charges etc., Complete. | 85 | 1 M3 (One Cubic Metre) | 48 ₹4,080 | 45 ₹3,825 |
| 8.00 | HSC Connection in HDPE Mains for Water Supply Scheme :EElectrofusion tapping saddle PE 80 blue, PN 12.5 with female threaded metal insert of SS 304 as per standards BS EN 12201 tested as per BS 6920 for drinking water in WRC-NSF ltd, UK. (Non Wrap with top loading type). Sizes:63mm to 315mm dia distribution HDPE pipes 20mm (1/2”) dia | 60 | 1 No (One Number) | 580 ₹34,800 | 570 ₹34,200 |
| 9.00 | HSC Connection in HDPE Mains for Water Supply Scheme :Providing suitable dia non corrosive engineering plastic moulded Clamp Saddle with SS 304 threaded metal inserted for tapping outlet suiting for ½”, 3/4” &1” clear bore and with wide plastic strap (Engineering Plastic) with SS 304 suitable bolts & nuts. Saddle to have sealing of Thermo plastic elastomeric (TPE) material around. 20mm (1/2”) dia | 60 | 1 No (One Number) | 745 ₹44,700 | 738 ₹44,280 |
| 10.00 | Brass Ferrule as per IS 319 grade of sizes 15mm, 20mm and 25mm size and threaded as per IS:1554 BSPT, ISO:7-1 to suit the corresponding bore sizes of 15mm, 20mm and 25mm dia size ( 1/2”, 3/4” and 1”) in the saddle Connection as per IS :1554 BSPT, ISO:7-1. 15mm (1/2”) | 60 | 1 No (One Number) | 165 ₹9,900 | 161 ₹9,660 |
Tender Value
₹2.7 L
EMD Value
₹2,700
Closing Date
23 Jan 2026, 3:00 pmClosed
COMMISSIONER
113 Thamilzh Salai(Palai Road) Thoothukudi Corporation
Laying 110mm HDPE Pipe Line for Water Supply Distrubution Network With HSC at Kanagasabapathy street in East Zone Ward No39
2026_MAWS_643333_1
213/25-26/AEE(E)
Open Tender
Civil Works
30 days
THOOTHUKUDI CORPORATION
Refer tender Notice
2 documents required · 2 mandatory
₹0
₹2,700
25 Mar 2026
13 Jan 2026
23 Jan 2026
13 Jan 2026
23 Jan 2026
19 Jan 2026
Dismantling Plain Cement Concrete including all cost and conveyance of labour charges etc complete.,
Supply and Delivery of 110mm HDPE Pipe (PN6) the rate includes all cost and conveyence of materials and labour charges etc., complete
supply and delivery of 110mm HDPE 90 degree bend as per is 8360/1977/ (PN6) the rate includes all cost and conveyence of materials and labour charges etc., complete
Earth work exacavtion for pipe line (110mm HDPE) trenches with proper gradient having Bed Depth of 1.05m and bed Width 0.60m in other then loose soil for 160mm dia HDPE the rate including all cost and conveyance of labour charges etc.,
Jointing 110mm HDPE Pipes and Specials by butt fusion welding / electro fusion welding joints using fusion equipment as per ISO 21307-2011 and as per IS 7634 (part-2) : 2012 including cost of hire charges for butt fusion equipment power supply arrangements etc., complete as per directed by TWAD Board Officers.
Lowering 110mm HDPE pipes and specials to trench and laying to proper grade and alignment and as directed by the Corporation Officers
Refilling 110mm HDPE pipe line trenches after laying the pipe without sand in the road surface the rate including all cost and conveyance of labour charges etc., Complete.
HSC Connection in HDPE Mains for Water Supply Scheme :EElectrofusion tapping saddle PE 80 blue, PN 12.5 with female threaded metal insert of SS 304 as per standards BS EN 12201 tested as per BS 6920 for drinking water in WRC-NSF ltd, UK. (Non Wrap with top loading type). Sizes:63mm to 315mm dia distribution HDPE pipes 20mm (1/2”) dia
HSC Connection in HDPE Mains for Water Supply Scheme :Providing suitable dia non corrosive engineering plastic moulded Clamp Saddle with SS 304 threaded metal inserted for tapping outlet suiting for ½”, 3/4” &1” clear bore and with wide plastic strap (Engineering Plastic) with SS 304 suitable bolts & nuts. Saddle to have sealing of Thermo plastic elastomeric (TPE) material around. 20mm (1/2”) dia
Brass Ferrule as per IS 319 grade of sizes 15mm, 20mm and 25mm size and threaded as per IS:1554 BSPT, ISO:7-1 to suit the corresponding bore sizes of 15mm, 20mm and 25mm dia size ( 1/2”, 3/4” and 1”) in the saddle Connection as per IS :1554 BSPT, ISO:7-1. 15mm (1/2”)
Poly Propylene compression Female Threaded Adaptor with metal insert of SS 304 as per standards ISO 14236 and Tested as per BS 6920 in WRC-NSF LTD, UK for connecting 15mm, 20mm and 25mm outlet points of Brass ferrule of sizes 15mm, 20mm and 25mm respectively. 15mm (1/2”)
Poly propylene 90 Degree Compression elbow with compression joint at both ends as per standards ISO 14236 and Tested as per BS 6920 in WRC-NSF LTD, UK suitable for 20mm, 25mm and 32mm OD MDPE pipes.20mm (1/2”) dia
Poly Propylene compression Female Threaded Elbow with metal insert of SS 304 as per standards ISO 14236 and Tested as per BS 6920 in WRC-NSF LTD, UK suitable for 20mm, 25mm and 32mm OD MDPE pipes. 20mm (1/2”)
Poly Propylene compression Male Threaded Adaptor with metal insert of SS 304 as per standards ISO 14236 and Tested as per BS 6920 in WRC-NSF LTD, UK suitable for 20mm, 25mm and 32mm OD MDPE pipes. 20mm (1/2”)
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.47 MB
BOQ_770823.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid