Tender Value
₹1.2 Cr
EMD Value
₹2.3 L
Closing Date
2 Sept 2026, 6:00 pm
Executive Engineer Sgr Core
Office of the Executive Engineer Sgr Core
Construction of Building for Govt. Middle School Moti Mohalla Kalan in Zone Nishat
2026_PWDJK_321782_1
39 of RNB//Sgr-Core/2026-27
Open Tender
Civil Works
Percentage
200 days
Srinagar
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,600
Executive Engineer Sgr Core
₹2.3 L
21 Aug 2026
21 Aug 2026
3 Sept 2026
21 Aug 2026
2 Sept 2026
21 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Civil part | |||||
| 1.01 | Earth work in excavation by manual /mechnical means in foundation trenches or drains (not exceeding 1.5M in width as well as 10Sqm on plan) including dressing of sides ramming of bottoms lift up to 1.5M including getting out the excavated soil and disposal of surplus excavated soil within a lead as directed from edge of cutting All kinds of soil. | 125.71 | Cum | 256.85 | ₹32,288.61 |
| 1.02 | Supplying and laying Dry stone soling dully hand packed tightly including ramming , watering and with all carriages up to the site of work . | 249.53 | Cum | 950 | ₹2,37,053.5 |
| 1.03 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering. All work up to all level ( 1:4:8 (1 Cement: 4 corse sand: 8 grade stone aggregate 40mm nominal size) crushed including all carriages up to the site of work | 42.17 | Cum | 5,202.9 | ₹2,19,406.29 |
| 1.04 | Providing and laying in position of Reinforced cement concrete Of specifed grade including curing but excluding the cost of centering shuttering, all works up to plinth level with 1:1:5 :3 including cost of carraige of material | 41.06 | Cum | 7,788.4 | ₹3,19,791.7 |
| 1.05 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering. All work up to all levels ( 1:2:4 (1Cement- 2 fine sand: 4 grade stone aggregate 20mm nominal size). Crushed including all carriages up to the site of work . | 115.55 | Cum | 6,591.27 | ₹7,61,621.25 |
| 1.06 | Centering and shuttering including strutting propping etc. and removal of form work in foundation footings basis of colums etc
Foundations, footings, bases of columns etc. for mass concrete. | 82.28 | Sqm | 286.35 | ₹23,560.88 |
| 1.07 | Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc. | 443.92 | Sqm | 628.95 | ₹2,79,203.48 |
| 1.08 | Suspended floors, roofs, landings, balconies and access platforms. | 6.47 | Sqm | 718.2 | ₹4,646.75 |
| 1.09 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level | 4,927.39 | Kg | 123.2 | ₹6,07,054.45 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.33 MB
BOQ_1075978.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].