| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹28.6 LAdmitted-Finance | -2.75% | ₹28.6 L | L1 | Admitted-Finance |
| 2 | L2₹31.5 L+₹2.9 L (10.3%)Admitted-Finance | +7.25% | ₹31.5 L+₹2.9 L (10.3%) | L2 | Admitted-Finance |
Tender Value
₹29.4 L
EMD Value
₹69,940
Closing Date
18 Aug 2026, 5:00 pmClosed
Sh Navin Kumar
Municipal Committee Ladwa
Providing and Laying RCC NP-3 Pipe Near H/o Narang to Main Road (Babain Road) in Ekta Colony Ward No. -01 MC Ladwa
2026_HRY_540332_1
2026843F0E52 44AB 44C5 9F31 C731288DA2FD304ULB
Open Tender
Civil Works
Works
250 days
Ladwa
2 documents required · 2 mandatory
₹5,000
₹69,940
Yes
11 Sept 2026
12 Aug 2026
19 Aug 2026
12 Aug 2026
18 Aug 2026
12 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | [11.5.3]12 mm cement plaster of mix : 3. 1:4 (1 cement: 4 fine sand) [Through Rate] | - | Sqm | 113 | - |
| 2 | [11.52]Cement rendering on plaster 1 mm thick [Through Rate] | 0.8 | Sqm | 28 | ₹22.37 |
| 3 | [17.15.3]Granular Sub-Base with Coarse Graded Material - Grading-I or II or III (Table:- 400-2)
Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with Rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401.of MORTandH specifications 3. Grading III material [Through Rate] | - | cum | 1,044 | - |
| 4 | [17.5.3]Compacting Original Ground 3. Compaction of Earthwork
Compaction of & preparation of sub grade including loosening, levelling of earth 225 mm thick top layer, rough dressing of soil, final dressing of earth to give level, camber, watering, rolling with road roller, compacting the bed to achieve minimum dry density as given in the Table 3000-2 as per technical clause 305 of MORT&H specifications [Through Rate] | 1 | Sqm | 7 | ₹6.99 |
| 5 | [17.69.2]Interlocking Concrete Block Pavement 2. Providing and Laying 80 mm thick ISI marked Interlocking Paver Blocks conforming to IS 15658:2006/IRC SP 63: 2004 of all shapes and colours in design mix cement M 40 over the bed of 30 mm thick fine sand complete in all respect. [Through Rate] | 1 | Sqm | 655 | ₹654.35 |
| 6 | [21.93.1]Providing and fixing SFRC MANHOLE COVERS AND FRAMES MARKED WITH IS: 12592 including setting the same to correct lines and levels in 1:3 cement sand mortar over manhole including carriage loading unloading stacking handling re-handling etc. complete in all respects to the satisfaction to the Engineer-in-charge. 1. Type:- Extra Heavy Duty Set (EHD-35) 560MM Clear Opening [Through Rate] | - | Each | 1,155 | - |
| 7 | [21.95.1]Providing lowering cutting jointing and testing RCC pipe class NP3 as per IS-458-2003 with spigot and socketed joints manufactured with ISI marked sulphate resistance cement as per ISI 12330 with rubber rings ISI marked antiternmite as required at site in to trenches for all depths and laying out the same to correct alignment gradients and levels including dressing and trimming and cutting of concrete beds and side of trenches, if required jointing with rubber rings in trenches and jointing with 1:3/2 cement sand mortar and with end dowels filled with 1:3/2 cement sand mortar and finishing the joints at an angle of 45 degree with faces of spigot of socket joints cutting and finishing the cut surface to a uniform finish etc. as fully described in item No. 21.38, item 21.44, item 21.45, and item 21.46 including cartage loading and unloading complete in all respects. the internal diametric of the sewer being: 1. 350 mm [Through Rate] | 1 | Metre | 1,128 | ₹1,126.87 |
| 8 | [3.1.18]By Mechanical Transport including loading, unloading and stacking 18. Disposal of moorum/building rubbish/ malba/ similar unserviceable, dismantled or waste material by mechanical transport including loading, transporting, unloading to approved municipal dumping ground for lead up to 10 km for all lifts, complete as per directions of Engineer-in-charge. [Rate] | - | cum | 202 | - |
| 9 | [3.1.2]By Mechanical Transport including loading, unloading and stacking 2. Earth [5km] | - | cum | 83 | - |
| 10 | [4.14.1]Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. 1. All kinds of soil. [Through Rate] | 0.2 | cum | 83 | ₹16.6 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.80 MB
BOQ_619672.xls
BOQ • 0.33 MB
AD0161641.pdf
Additional Documents • 0.53 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .