Executive Engineer HPPWD Solan
near new bus stand Solan
Rectification of surface of road by providing 30mm thick BC Patches in various Rds
2026_PWD_137978_2
No.34351-58 dated 02.07.2026
Open Tender
Civil Works
60 days
Solan
as per SBD
12 documents required · 12 mandatory
₹500
₹20,500
3 Jul 2026
3 Jul 2026
9 Jul 2026
3 Jul 2026
9 Jul 2026
3 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg (zero point two five to zero point three kilogramme) per sqm on the prepared dry and hungry bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503 (five zero three) and as per direction of Engineer in charge including carriage of all labour, equipments and materials to various locations through all modes of transportation in all lead & lift and other incidental charges. | 1,915.6 | Per Square Meter | 30.9 | ₹59,192.04 |
| 2 | Providing and laying bituminous concrete 30mm ( Thirty milimetres) thick with 100-120 (one hundred to one hundred twenty) TPH batch type hot mix plant producing an average output of 75 (seventy five) tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.5 (five point five ) per cent of total weight of mix, agreegate Grading II (thirteen milimetres nominal size) i.e. 13.2 - 10 mm thirty per cent, 10 - 5 mm twenty five per cent, 5 mm and below forty three per cent of volume of agreegate and filler @ 2 per cent of weight of aggregates, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 (five zero nine) complete in all respects and as per direction of Engineer in charge including carriage of all labour, equipments and materials to various locations through all modes of transportation in all lead & lifts and all incidental charges. | 57.47 | Per Cubic Meter | 16,812 | ₹9,66,185.64 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.99 MB
BOQ_204319.xls
BOQ • 0.37 MB
SBD.pdf
Tender Documents • 3.17 MB
Download all tender documents and submit your bid