Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.2 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹5.4 L+₹19,917.65 (3.80%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹6.5 L+₹1.3 L (24.8%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹7.3 L+₹2.1 L (39.6%)Admitted-Finance | L4 | Admitted-Finance | ||
| 5 | L5₹7.3 L+₹2.1 L (40.0%)Admitted-Finance | L5 | Admitted-Finance |
Tender Value
₹10.5 L
EMD Value
₹20,960
Closing Date
20 Jun 2026, 6:00 pmClosed
Er. Sandeep Gupta
XEN
PERMANENT RESTORATION WORK OF RETAINING WALL OPPOSITE POLICE STATION BAKSHI NAGAR JAMMU
2026_PWDJK_312044_1
eNIT No. 27of 2026-2027 Dated10-06-2026
Open Tender
Civil Works
Percentage
45 days
Jammu
BOQ
2 documents required · 2 mandatory
₹600
Executive Engineer PWD R and B Division
₹20,960
2 Jul 2026
10 Jun 2026
22 Jun 2026
10 Jun 2026
20 Jun 2026
10 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavatedearth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge.
All kinds of soil | 101.95 | cum | 187.3 | ₹19,095.24 |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering all work up to plinth level in 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate) 40mm nominal size crushed. | 12.74 | cum | 5,202.9 | ₹66,284.95 |
| 3Centering and shuttering including strutting, propping etc. and removal of form work for :- | |||||
| 3.1 | Foundations, footings, bases of columns. | 55.76 | sqm | 286.35 | ₹15,966.88 |
| 4 | Centering and shuttering including strutting, propping etc. and removal of form work for:
Retaining walls, return walls, walls (any thickness) including attached pilasters
buttresses, plinth and string course fillets, kerbs andsteps etc | 245.35 | sqm | 628.95 | ₹1,54,312.88 |
| 5 | Demolishing stone rubble masonry manually/by mechanical means
including stacking of serviceable material and disposal of unserviceable
material within 50 meters lead as per direction of Engineer-in-charge:
15.9.2 In cement mortar | 101.95 | CUM | 1,740.45 | ₹1,77,438.88 |
| 6 | Dry random rubble masonry with hard stone in foundation and plinth:
7.3.1 With bond stone. | 67.97 | cum | 5,536.55 | ₹3,76,319.3 |
| 6.1 | Extra for random rubble masonry with hard stone in:
7.4.1 Square or rectangular pillar | - | cum | 769.35 | - |
| 7 | Labour engaged for cleaning of site area and shifting of dismantled material from site area to dumping site /cutting of trees. | 120 | no | 553 | ₹66,360 |
| 8 | disposal of mulba | 203.91 | cum | 279.04 | ₹56,899.05 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.26 MB
BOQ_1010040.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .