| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹32.2 LAccepted-AOC | L1 | Accepted-AOC Being L1 | |
| 2 | L2₹34.8 L+₹2.6 L (8.07%)Rejected-Finance 369 KRISHNA BHAVAN DHARMSALA ROAD CINEMA CHURAHA HARDOI UTTAR PRADESH 241001 | HARDOI | UTTAR PRADESH | 241001 | L2 | Rejected-Finance Being L2 | |
| 3 | L3₹34.8 L+₹2.6 L (8.13%)Rejected-Finance 307 SADAR BAZAR LUCKNOW UP 226002 | LUCKNOW | UTTAR PRADESH | 226002 | L3 | Rejected-Finance Being L3 | |
| 4 | L4₹35.5 L+₹3.3 L (10.3%)Rejected-Finance | L4 | Rejected-Finance Being L4 | |
| 5 | L5₹36.9 L+₹4.7 L (14.5%)Rejected-Finance 301 TULSI TOWER KHADAKPADA KALYAN THANE MAHARASHTRA 421301 | THANE | MAHARASHTRA | 421301 | L5 | Rejected-Finance Being L5 |
| Sl No | Description | Qty | Unit | M/s Vatsh Raj and co L3 | Diamond Electric Co. L5 | VIDYA TRADERS L4 | PRABHAT ENGINEERING SOLUTION AND SERVICES L1 | FUTURE Inc. L6 | M I & CO. L7 | Sai Solar Power L2 | OM NAMAH SHIVAY ENTERPRISES L8 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Excavation in trenches in soft/Loose soil not exceeding 1.5 mtr deep and not exceeding 1.5 mtr wide and getting out complete all as specified and as directed by the Engineer-in-Charge. | 939 | Cum | 90 ₹84,510 | 95 ₹89,205 | 90 ₹84,510 | 170 ₹1,59,630 | 85 ₹79,815 | 75 ₹70,425 | 35 ₹32,865 Lowest | 150 ₹1,40,850 |
| 2.00 | Returning, filling in including spreading, levelling, watering and well ramming in layers n.exc 25cm thick using excavated soil complete all as specified and as directed. | 540 | Cum | 35 ₹18,900 Lowest | 35 ₹18,900 Lowest | 50 ₹27,000 | 80 ₹43,200 | 45 ₹24,300 | 65 ₹35,100 | 35 ₹18,900 Lowest | 125 ₹67,500 |
| 3.00 | Removing excavated soil n.exc 50 m and depositing where directed at a level n.exc 1.5 m above the starting point complete all as specified and as directed. | 400 | Cum | 30 ₹12,000 Lowest | 35 ₹14,000 | 50 ₹20,000 | 60 ₹24,000 | 45 ₹18,000 | 58 ₹23,200 | 50 ₹20,000 | 90 ₹36,000 |
| 4.00 | Material and labour for dry river sand, washed and screened dry for cushioning to under ground cable in trenches below and around under ground cable including spreading, levelling & punning complete as specified and directed .
Note :- Punned thickness (18 cm) shall only be considered for payment. | 280 | Cum | 400 ₹1,12,000 | 450 ₹1,26,000 | 400 ₹1,12,000 | 600 ₹1,68,000 | 550 ₹1,54,000 | 280 ₹78,400 | 250 ₹70,000 Lowest | 650 ₹1,82,000 |
| 5.00 | M&L for laying of Fly ash brick designation 100 Kg / Sqcm, using old size bricks confirming to IS 12894, laid flat with width equal to length of brick, laid dry over electric cable for protection complete all as specified & directed by Engr-in-Charge. | 30 | Per thousand | 6,000 ₹1,80,000 | 6,500 ₹1,95,000 | 4,000 ₹1,20,000 Lowest | 7,500 ₹2,25,000 | 7,000 ₹2,10,000 | 5,000 ₹1,50,000 | 6,500 ₹1,95,000 | 6,000 ₹1,80,000 |
| 6.00 | Deployment of tools & manpower for Boring /drilling (Horizontly) manually / mechanically under existing road max 10 M in width) suitable for passing pipe of any descreption of dia 40 to 100 mm complete all as specified and directed by Engineer in Charge | 24 | RM | 80 ₹1,920 Lowest | 100 ₹2,400 | 430 ₹10,320 | 400 ₹9,600 | 200 ₹4,800 | 500 ₹12,000 | 400 ₹9,600 | 450 ₹10,800 |
| 7.00 | Supply, laying jointing and testing LT UG cable XLPE Insulated, screened, PVC bedded, galvanized steel strip or wire armoured IS 7098 marked, electric power cables (heavy duty) 1100 Volts grade with stranded aluminium conductor of size 120 sq mm 3.5 core, laid in trench / laid under floor or fixed naked with wall / on wall / in ducts / in GI pipes etc. with and includings MS Clamps, nuts, bolts, washers complete all as specified and directed.
Note- Excation, earth works,and sand cushioning, protection bricks and pipe shall be measured and paid seprately under given items. | 360 | RM | 635 ₹2,28,600 Lowest | 660 ₹2,37,600 | 790 ₹2,84,400 | 640 ₹2,30,400 | 782 ₹2,81,520 | 700 ₹2,52,000 | 690 ₹2,48,400 | 742 ₹2,67,120 |
| 8.00 | All as per item No 07 above but LT under ground cable of size 95 Sqmm 3.5 core | 660 | RM | 507 ₹3,34,620 | 525 ₹3,46,500 | 623 ₹4,11,180 | 505 ₹3,33,300 Lowest | 634 ₹4,18,440 | 600 ₹3,96,000 | 552 ₹3,64,320 | 599 ₹3,95,340 |
| 9.00 | All as per item No 07 above but LT under ground cable of size 70 Sqmm 3.5 core | 990 | RM | 406 ₹4,01,940 Lowest | 410 ₹4,05,900 | 506 ₹5,00,940 | 419 ₹4,14,810 | 482 ₹4,77,180 | 460 ₹4,55,400 | 430 ₹4,25,700 | 488 ₹4,83,120 |
| 10.00 | All as per item No 07 above but LT under ground cable of size 50 Sqmm 3.5 core | 980 | RM | 302 ₹2,95,960 | 290 ₹2,84,200 Lowest | 374 ₹3,66,520 | 305 ₹2,98,900 | 568 ₹5,56,640 | 365 ₹3,57,700 | 335 ₹3,28,300 | 365 ₹3,57,700 |
Tender Value
₹38.5 L
EMD Value
₹77,080
Closing Date
4 Oct 2025, 6:00 pmClosed
GE E/M Lucknow
Garrison Engineer E/M, 36 LBS Marg, Lucknow Cantt, Lucknow (U.P.) PIN 226002
PROVISION OF LT CABLE, LT PANEL AND CONNECTED ITEMS AT TRG AREA OF 01 ASSAM UNDER GE E/M LUCKNOW
2025_MES_729626_1
GE/EM/LKO/EXT(ELECT)/T-17 OF 2025-2026
Open Tender
Miscellaneous Works
Item Rate
180 days
Lucknow
As per NIT
8 documents required · 8 mandatory
₹500
GE E/M Lucknow
₹77,080
Yes
17 Nov 2025
6 Sept 2025
6 Oct 2025
6 Sept 2025
4 Oct 2025
20 Sept 2025
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .