Loading…
New: tenders and results on WhatsApp
New: Find tenders, results and companies on WhatsApp, by text or voice note
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance PANDAVESWAR BARDHAMAN WEST BENGAL INDIA 713346 | PANDAVESWAR | BARDHAMAN | WEST BENGAL | 713346 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance ANDAVESWAR BARDHAMAN BARDHAMAN WEST BENGAL 713346 | ANDAVESWAR | BARDHAMAN | WEST BENGAL | 713346 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance KHANDRA V K UNIT KHANDRA COLLIERY ANDAL BANKOLA BARDHAMAN WEST BENGAL 713363 | ANDAL | PASCHIM BARDHAMAN | WEST BENGAL | 713363 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹1.5 L
EMD Value
₹1,900
Closing Date
2 Jan 2025, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
General Manager
Office of The General Manager Bankola Area, PIN-713363
Complete rewinding and repairing of (A) 30 HP K.E. make 1470 rpm 550 volt motor (B) 50KVA 550V 440V Transformer with installation under S.S.Pur Colliery.
2024_ECL_324008_1
ECL/GM/BA/E TENDER/24-25/EnM/343 Dt 23.12.2024
Open Tender
Electrical and Maintenance Works
Item Rate
25 days
Shyamsundarpur Colliery
Please refer to NIT document
5 documents required · 5 mandatory
₹1,900
3 Jan 2025
23 Dec 2024
3 Jan 2025
23 Dec 2024
2 Jan 2025
23 Dec 2024
23 Dec 2024 - 27 Dec 2024
Amount
Item Description/ Heading
Super enameled Copper wire
'F' class insulating materials.
Flexible glass leads for terminal connection
Moisture free varnish with thinner
Soldering materials like soldering stick, Flux paste etc.
Decarbonising, cleaning, varnish, nut, bolt
Labour charges for rewinding of coils
Mechanical job: both side housing as per bearing size sleeve making and fixing as per proper bearing size.
Both side shaft bearing size welding, machining etc.
Dismantling and refitting charges
Transporting charges both side loading, unloading to and fro
Supply of new electrolyte DPC copper conductor for primary and secondary coils (39kgs. + 36kgs.)
Supply of insulating materials of suitable grade.
Supply of gasket joints complete set
Supply of primary & secondary side H.T. bushing insulator with current carrying contacts.
Repairing of Tank, conservator, cooling pipe with fitting new gate valve.
Supply and fixing of suitable rated tape changer switch including mechanism alignment with transformer Tank.
Re-insulation of Secondary copper conductor into DPC
Labour charges for rewinding
Dehydration and filtration of Transformer oil
Charges for high voltage pressure testing
Charges for painting the above transformer
Transportation charges of above transformer up and down with loading and unloading
Transportation, loading, unloading of 50KVA transform from SDL shed to Sarpi Sub-station
Installation of 5OKVA 55OV/440V transformer at sarpi Sub-station with making connection of both side insulationg tape etc.skilled 1 head X rs 856/- unskilled 764/- X 4 head)
Total impact of GST for the purpose of CTC
BENGAL ELECTRICAL ENTERPRISE (BID ID -1111958)
DUTTA ELECTRIC (BID ID -1111966)
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .