Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹8.0 LAdmitted-Finance | +0.00% | ₹8.0 L | L1 | Admitted-Finance |
| 2 | L2₹8.2 LAdmitted-Finance | +2.66% | ₹8.2 L | L2 | Admitted-Finance |
| 3 | L3₹8.3 LAdmitted-Finance 337 C INDIRA GANDHI ROAD KONNAGAR HOOGHLY 712235 | KONNAGAR | HOOGHLY | WEST BENGAL | 712235 | +3.62% | ₹8.3 L | L3 | Admitted-Finance |
Tender Value
₹8.0 L
EMD Value
₹17,000
Closing Date
16 Feb 2026, 12:00 pmClosed
D.G(M)/ROADS
15 N. Nellie Sengupta Sarani, 4th Floor, HUDCO Building, Kolkata-700087.
CONSTRUCTION OF BOUNDARY WALL ADJACENT TO KMC LABOUR QUARTER OF PBPS DEPTT. BESIDE 06 MM STONE CHIPS STACK YARD OF ASPHALTUM PLANT, UNDER ASPHALTUM PALMER BAZAR DEPARTMENT.
2026_KMC_997682_1
KMC/ASPH/PB/SM-12/25-26
Open Tender
CIVIL WORKS
21 days
KOLKATA
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹17,000
28 Feb 2026
7 Feb 2026
18 Feb 2026
7 Feb 2026
16 Feb 2026
7 Feb 2026
BUILDING WORKS. (T)MISCELLANEOUS WORKS: A. SPECIAL WORKS. III. EVENT MANAGEMENT : 5) Hire and labour charges for 100mm dia bamboo railing on 150mm dia Jhau/Eucalyptus or other approved timber 1.4 m above G.L. and 0.60 m below G.L. including tying strongly with coir ropes and boring holes for posts in any soil /black top/concrete surface, packing the sides etc. including cost of carriage of all materials and labour complete and maintaining barricading for a period beyond 5(five) days ater the reported & recorded time of completion of the entire ork to the satisfaction of Engineer-in-Charge, including restoration to the damages of the ground to its original condition as per direction of Engineer-in -Charge after removing the barricade. [Cost of restoration will be paid separately.] (100 mm. dia bamboo railing & 150mm. dia Jhau/Eucalyptus/other approved timber posts @ 1.80m apart). (i) Railing with 4 rows.
BUILDING WORKS (A) EARTH WORK,ANTITERMITE TREATMENT 2. Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides oftrenches levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm.
BUILDING WORKS (A) EARTH WORK,ANTITERMITE TREATMENT 4. (A) Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity)
BUILDING WORKS (B) DISMANTLING, CUTTING CHASE, HOLES ETC 3. Dismantling R.C. floor, roof, beams etc including cutting rods and removing rubbish as directed within a lead of 75 m. including stacking of steel bars.(a) In ground floor including roof.
BUILDING WORKS (B) DISMANTLING, CUTTING CHASE, HOLES ETC. 1. Dismantling all types of masonry excepting cement concrete plain or reinforced, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m. (a) In ground floor including roof.
BUILDING WORKS(P) SOLING, EDGING AND METALLING??(1)Brick soling with picked jhama bricks including preparation of bed as necessary with brick joints properly filled in and packed with powdered earth and including necessary cushion of similar material below the soling (and in between layers when more than one layer is used) completes as per direction.(a) Single brick flat soling (thickness 75 mm.)
BUILDING WORKS ( C ) Brickworks,Concrete Works etc B. CONCRETE WORKS 1. Cement concrete with graded jhama khoa (30 mm size) excluding shuttering In ground floor and foundation (b) 1:4:8 proportion
BUILDING WORKS ( C ) Brickworks,Concrete Works etc 6?..Controlled Cement concrete with well graded stone chips (20 mm nominal size) excluding shuttering and reinforcement with complete design of concrete as per IS : 456 and relevant special publications, submission of job mix formula after preliminary mix design after testing of concrete cubes as per direction of Engineer-in charge. Consumption of cement will not be less than 300 Kg of cement with Super plasticiser per cubic meter of controlled concrete but actual consumption will be determined on the basis of preliminary test and job mix foumula. In ground floor and foundation.[using concrete mixture]M 25 Grade (i) Pakur Variety
BUILDING WORKS ( C ) Brickworks,Concrete Works etc?36..Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor).(When the height of a particular floor is more than 4 m the equivalent floor height shall be taken as 4 m and extra for works beyond the initial 4 m ht. shall be allowed under 12 (e) for every 4 m or part thereof).(b) Above 30 mm & upto 37 mm thick wooden shuttering as per decision & direction of Engineer-In-Charge.Notes:-For shuttering in shell roof, grid roof with vertical faces folded plate, arched roof the rate in 36 (a), 36 (b) & 37 (c ) of subhead B above to be increased by 100 % . For grid roof with splayed faces, rate is to be increased by 150%.Notes:- For shuttering in shell roof, grid roof with vertical faces folded plate, arched roof the rate in 36 (a), 36 (b) & 37 (c ) of subhead B above to be increased by 100 % . For grid roof with splayed faces, rate is to be increased by 150%.
BUILDING WORKS ( C ) Brickworks,Concrete Works etc.40..Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction.(a) For works in foundation and upto roof of ground floor/upto 4 m.(i) Tor steel/Mild Steel.I. SAIL/ TATA/RINL.
BUILDING WORKS ( C ) Brickworks,Concrete Works etc A. BRICK WORKS 7. Brick work with 1st class bricks in cement mortar (1:4) (b) In superstructure, ground floor
SECTION 1 BUILDING WORKS (I) PLASTERING, POINTING ETC. A. ORIGINAL WORKS 1.Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface] i) With 1:6 cement mortar (a) 25 mm thick plaster
BUILDING WORKS (B) DISMANTLING, CUTTING CHASE, HOLES ETC 13. Removal of rubbish,earth etc. from the working site and disposal of the same beyond the compound, in conformity with the Municipal / Corporation Rules for such disposal, loading into truck and cleaning the site in all respect as per direction of Engineer in charge
SECTION 1 BUILDING WORKS (J)WHITE WASH, COLOUR WASH, DISTEMPER A. ORIGINAL WORKS 3.Colour washing with "ELLA" with a coat of white wash priming including cleaning and smoothening surface thoroughly : (ii) External surface (ground floor) (a) One coat N.B. : Extra for each additional floor in external walls refer item 1 of subhead C
Sub Total
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.89 MB
FORM.pdf
Additional Documents • 0.60 MB
BOQ_2442795.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid