Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹37.1 L
EMD Value
₹37,150
Closing Date
28 Nov 2025, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE RW Division, Sambalpur
SE RW Division, Sambalpur
Construction of New Day Care Sub Centre building at Mathpali under State Budget.
2025_CERWI_121640_3
Tenderonline SBPR-08 of 25-26
Open Tender
Civil Works - Roads
Percentage
60 days
Sambalpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
₹37,150
Yes
2 Feb 2026
20 Nov 2025
29 Nov 2025
20 Nov 2025
28 Nov 2025
20 Nov 2025
Supplying and filling foundation and plinth with sand well watered & rammed with cost, conveyance, royalty and taxes of all materials labour required for the work as per specification and direction of the Engineer-in-Charge including royalty of materials etc complete.
Providing Cement concrete (1:3:6) in foundation with 4cm nominal size of crusher broken hard granite stone metal of approved quality from approved quarry including hoisting, lowering and laying in position in layers not exceeding 150 mm thick with proper packing and ramming to proper slope and level including watering , curing with cost , conveyance, royality, taxes , labour, T&P and all other materials required for the work , finishing the exposed surface smooth , providing grooves and beads where ever necessary etc. complete in all respect as per the specification and including 1% cess as per direction of the Engineer-in-charge.
Cement concrete work (1:2:4) using 12 mm to 20 mm size black hard crusher broken granite stone chips of approved quality from approved quarry including hoisting,lowering , laying and compacting concrete watering and curing for 28 days including finishing the exposed surface including cost , conveyance, royalties and taxes of all the materials and cost of all labour, T&P required for the work etc. complete in all respect including 1% cess as per direction of the Engineer-in-charge.
R.C.C work of M-25 grade with 20mm and down grade black hard granite (crusherbroken) stone chips including cost, conveyance, royalty & taxes of all materials & cost of all labour & T&P required for the work etc. complete as per specification & direction of Engineer in charge. (For Column Base)
Plinth Beams
Column & Beams (GF)
Column and wall beam (FF)
Column and wall beam (2nd floor)
Lintels (Ground Floor)
Lintels (First Floor)
Sun shades (Ground floor)
Sun shades (First floor)
RCC shelves (Ground floor)
RCC shelves (First floor)
RCC stair ground floor (Stair ) Step
RCC stair First floor (Stair ) Step
Roof slab landings & chajja (Ground floor)
Roof slab landings & chajja (First floor)
Roof slab landings & chajja (2nd floor)
Cutting, Straightening the bend up M.S./Tor Rods bending, binding welding, jointing if necessary and tying the grills and placing in position as required for R.C.C. works and for providing required no of fan hooks hoisting , lowering, laying including cost,conveyance and taxes of M.S. Rods or Tor steel and binding wires of 18 to 20 guage required for the work bending, binding and tying the grills in all floors ( payment will be made on weight of M.S. rods or Tor steel only and no separate payment will be made towards the weight of binding wires) including 1% cess as per direction of the Engineer-in-charge.(Ground floor)
First floor
2nd floor
20mm thick Cement plaster in C.M (1:6) as grading plaster including watering curing conveyance, royality and all taxes of materials and labour with T&P required for the work etc. complete in all respect as per specification and direction of the Engineer-in-charge.
Fly ash bricks masonary with CM (1:6) in foundation and plinth including cost conveyance, royalty and taxes of all materials labour T&P etc complete including watering and curing for required period as per direction of the Engineer in charge.
Fly ash bricks masonary with CM (1:6) in superstructure including cost conveyance, royalty and taxes of all materials labour T&P etc complete including watering and curing for required period as per direction of the Engineer in charge.(ground floor)
First floor
2nd floor
16 mm (5/8") thick cement plaster in C.M. (1:6) over brick masonry finished smooth after racking out of the joints including watereing and curing with cost, conveyance, royality and taxes of all materials and cost of all labour and T&P required for the work including 1% cess as directed by the Engineer-in-charge. (Ground floor)
First floor
2nd floor
12mm thick Cement plaster in C.M (1:6) over brick work including watering curing and scaffolding with cost, conveyance, royalty, taxes of all the materials required for the work with all labour, T&P and cess etc. complete in all respect as per specification and direction of the Engineer-in-charge.(Ground floor
First floor
2nd floor
Providing and fixing vitrified tiles in floors, treads of steps and landing on 20mm th bed of cement mortar (1:4) (1 cement:4 sand) joined with neat cement slurry mixed with pigment to match the shade of tiles including rubbing, polishing including cost of tiles, conveyance, taxes & labour, T&P and cess etc. complete in all respect as per specification and direction of the Engineer-in-charge (Ground floor)
First floor
Supplying,fitting and fixing vetrified tiles in dados skirting and risers of steps on 12mm thick cement plaster (1:3) jointed with neat cement slurry mixed with pigment to match the shades of the tiles including rubbing and polishing complete including cost of tile as per specification and direction of the Engineer-in-charge.(Ground floor)
First floor
Fixing tiles (Vitrified industrial tiles) in floors treads or steps and landing on 20mm thick bed of cement mortar 1:4 ( 1 Cement: 4 Sand) jointed with neat cement slurry mixed with pigment to match the shades of the tiles including rubbing and polishing with cost, conveyance of all materials etc complete. (Ground floor)
First floor
Supplying,fitting and fixing vetrified tiles in dados skirting and risers of steps on 12mm thick cement plaster (1:3) jointed with neat cement slurry mixed with pigment to match the shades of the tiles including rubbing and polishing complete including cost of tile as per specification and direction of the Engineer-in-charge. (Ground floor)
First floor
Providing supplying and fitting and fixing of MS door/ window shutters gates and MS grills as per approved design etc complete asper directionof Engineer in charge. (GF & F.F)
Wall painting two coat with plastic emulsion paint over coat of priming including all cost, conveyance, taxes of all the materials , all labour and T&P required for the work etc. complete including 1% cess as per direction of the Engineer-in-charge.( Ground floor)
First floor
2nd floor
Finishing wall surface with Acrylic wall putty( water based) of approved make and finished smooth and even surface to receive painting including cost of scaffolding staging charges with cost of all materials, taxes, labour, T&P etc. complete as per specification and direction of the Engineer-in-charge. (Ground floor)
First floor
2nd floor
Painting two coats over a coat of priming with approved paint and primer on wood and iron work including cost of paint and primer etc complete as per specification and direction of the Engineer-in-charge.(Ground floor)
First floor
2nd floor
Finishing wall with water proofing weather coat paint of approved shade one coat over a coat of wall rimer including cost of weather coat paint with alllabour T&P required etc complete etc complete as per direction of Engineer in charge. (Ground floor)
First floor
2nd floor
Supplyng fitting fixing of stainless steel of 304 grade in hand ralling using 50mm dia of 2mm thick circular pipe with balustrade of size 32mmx32mmx2mm @ 0.9m C/C et complete asper direction of Engineer incharge
Providing and fixing 100mm dia PVC rain water pipe with all cost of labour and materials etc complete as per direction of Engineer in charge.
Providing supplyig fitting fixing up window / Door (sliding type) made up aluminium section No. 151-154,151-155, as windows frame section No. 151-155,151-+153 & 151-167 as shutter frame with 5mm thick black glass as panel fitted with rubber beading including locking arrangement including all fitting including cost of materials all taxes labour T&P etc complete asper specification and direction of Engineer in charge.
stage.html
html • 0.02 MB
cancelled_1.pdf
pdf • 0.17 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.15 MB
Tendernotice_2.pdf
PDF • 5.69 MB
BOQ_565896.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .