Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹66.2 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹67.9 L+₹1.7 L (2.54%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹74.8 L+₹8.6 L (12.9%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹75.1 L+₹8.9 L (13.4%)Admitted-Finance BALSOO KULGAM ANANTHNAG JAMMU KASHMIR 192232 UDYAM JK 11 0004326 | KULGAM | JAMMU AND KASHMIR | 192232 | L4 | Admitted-Finance | ||
| 5 | L5₹80.8 L+₹14.6 L (22.0%)Admitted-Finance | L5 | Admitted-Finance |
Tender Value
₹1.1 Cr
EMD Value
₹2.1 L
Closing Date
29 Jul 2026, 4:00 pmClosed
Executive Engineer
RnB Division Karan Nagar Srinagar
Construction of Establishment cum Academic Block in place of Old Blocks / existing Structures (Commerce Block, Physics Blocks, Store Conference Hall, Washrooms at Government College for Women Nawakadal Srinagar Phase-1st (Balance Work).
2026_PWDJK_316388_1
etendering NIT No. 22 Karan Nagar Sgr
Open Tender
Civil Works
Percentage
90 days
Nawakadal
Please refer Tender documents.
4 documents required · 4 mandatory
₹2,600
Executive Engineer
₹2.1 L
10 Aug 2026
16 Jul 2026
30 Jul 2026
16 Jul 2026
29 Jul 2026
16 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil. | 54.94 | Cum | 592.9 | ₹32,573.93 |
| 2 | Providing & laying of stone soling hand packed in foundation and plinth incl ramming, watering, compaction & lead lifts all carriages upto site of work complete. | 25.8 | Cum | 950 | ₹24,510 |
| 3Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: | |||||
| 3.01 | 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 0.75 | Cum | 5,202.9 | ₹3,902.17 |
| 3.02 | 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 81.7 | Cum | 5,733.6 | ₹4,68,435.12 |
| 4Centering and shuttering including strutting, propping etc. and removal of form work for | |||||
| 4.01 | Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc. | 9.06 | Sqm | 628.95 | ₹5,698.29 |
| 4.02 | Lintel, beams, plinth beams, girders, bressumers and cantilevers. | 519.79 | Sqm | 577.55 | ₹3,00,204.71 |
| 4.03 | Suspended floors, roofs, landings, balconies and access platforms | 898.78 | Sqm | 718.2 | ₹6,45,503.8 |
| 4.04 | Stairs (excluding landings) except spiral staircases. | 18.78 | Sqm | 851.15 | ₹15,984.6 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.54 MB
BOQ_1031475.xls
BOQ • 0.47 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .