| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.5 LAccepted-AOC SHOP NO 10 367 SOMWAR PETH NARPARTGIRI CHOWK PUNE 411011 | PUNE | MAHARASHTRA | 411011 | L1 | Accepted-AOC THE LOWEST TENDERER | |
| 2 | L2₹17.4 L+₹89,590 (5.43%)Rejected-Finance | L2 | Rejected-Finance NOT THE LOWEST TENDERER | |
| 3 | L3₹18.1 L+₹1.6 L (9.54%)Rejected-Finance GATE NO 454 01 TAPKIR NAGAR PUNE NASIK HIGHWAY NEAR GANDHARV NAGARI MOSHI PUNE 412 105 | PUNE | MAHARASHTRA | 412105 | L3 | Rejected-Finance NOT THE LOWEST TENDERER | |
| 4 | L4₹19.2 L+₹2.7 L (16.1%)Rejected-Finance S NO 279 1 1A PLOT NO 113 KUTWAL COLONY SASTHE WASTI LOHEGAON PUNE 411 047 | PUNE | MAHARASHTRA | 411047 | L4 | Rejected-Finance NOT THE LOWEST TENDERER | |
| 5 | L5₹19.5 L+₹3.0 L (17.9%)Rejected-Finance FLAT NO 203 SEC 14 PLOT NO 142 SHIVSRUTI PARK APARTMENT E WING 1ST FLOOR MOSHI PRADHIKARAN TAL HAVELI DIST PUNE 412 105 | PUNE | MAHARASHTRA | 412105 | L5 | Rejected-Finance NOT THE LOWEST TENDERER |
Tender Value
Refer Docs
EMD Value
₹60,000
Closing Date
17 Jul 2024, 6:00 pmClosed
GE MH AND RH KHADKI
Military Engineer Services Garrison Engineer MH and Range Hills Range Hills Road Khadki, Pune 411003
CLEANING OF UG SUMPS OHT TANKS AND SERVICE TANKS OF BILDS REPLACE OF UNSV FLOAT VALVES PVC SERVICE TANK GATE VALVE OF VARIOUS SIZES GI PIPE LINE ETC INCL CONNECTED CERTAIN MISC ITEMS AT MD AND OTM ACCN OF AUNDH MIL STN UNDER GE MH AND RH KHADKI
2024_MES_661094_1
8586/E8
Open Tender
Civil Works
Item Rate
180 days
GE MH AND RH KHADKI
AS PER TENDER DOCUMENTS
8 documents required · 8 mandatory
₹500
GE MH AND RH KHADKI
₹60,000
10 Sept 2024
21 Jun 2024
19 Jul 2024
21 Jun 2024
17 Jul 2024
5 Jul 2024
21 Jun 2024 - 10 Jul 2024
Amount
Disconnecting existing tanks of capacity 500/1000 Ltr setting aside (or lowering if required) water tank, dewatering, cleaning and removeing all dirt, scale and algae formation from inside the tank by using cleaning chemicals including paste stickers mentioning "TANK CLEANED ON " with date, month, & year. The stages of cleaning prosess of tanks are as follows :- (a) To drain out the water by using exist valve or high capacity dewatering system. (b) Cleaning all the algae formation inside the tank by using high-strength calcium hypochlorite (HSCH) chemicals and scrubbing the walls & base of the tank by scrubber. (c) Fresh water cleaning with high speed jet pump. (d) Drying the tank then first stage of bacteria screening and sterlization of the tank by using high-strength calcium hypochlorite (HSCH) chemical. (e) Cleaning the floor of the water tank by heavy duty industrial vaccum clearner. (f) Second stage of bacteria screening and starilization of the tank by using ultra violet ray ejector covering 360 degree within the tank and killing all suspended bactaria (g) Third stage of bacteria screening and sterilization of the tank floor by usinghigh-strength calcium hypochlorite (HSCH) chemical. Note - (i) The quoted rate shall include for removal of mud, grits and deposits etc properly from site of work and on completion of work sterlisation certificate to submitted to the Engineer-in-charge. (ii) Cleaning needs to be done mechanically by authorised dealer/agent as approved by Engr-in-charge. (iii) Cleaning chemical shall also be approved by Engineer-in-charge.
All as per item No.1 but for RCC tank up to G+3 storeyed and capacity up to 1000 Ltrs all as specified and as directed.
All as per item No.1 but for RCC Over head tank of height 20m from GL of the following capacity all as specified and as directed.
100000 Gallon RCC OHT
150000 Gallon RCC OHT
50000 Gallon RCC OHT
All as per item No.1 but for RCC Under ground sump of the following capacity all as specified and as directed.
5 Lakh Gallons capactiy.
0.5 Lakh Gallons capactiy.
Note for item No 1 to 4: (i) The contactor shall not hamper the water supply to the resident/ user. (ii) The contractor shall also confirm the restoration of water supply from service tank after cleaning from the resident / user. (iii) Any damage during cleaning of Service tanks the same will be replaced by the contractor without any cost to the department.
S&F in repair Ball brass valve, high pressure with polythene float and fly nut complete ISI marked of following size, complete all as specified and dircted by Engineer-in-Charge.
50 mm bore
40 mm bore
25 mm bore
20 mm bore
Note for item No 5 : The contactor shall depute a person during the time of water supply distribution to check overflow once in a month. A record of the same shall be maintained by the contractor.
Supply and fix in repair PVC tank cover suitable for 500 ltrs/1000 ltrs capacity as per existing size complete with fixing accessories
S&F in repairs galvanized iron water tubing medium grade conforming to IS 1239 (Part-1): 2004 including all fittings conforming to IS 1239 (Part-2): 2011 at Incoming of the service tanks / Fresh water line of kitchen complete all as required at site for branch connection including cutting threading complete all as specified & directed by Engineer-in-charge.
15 mm dia bore
20 mm dia bore
25 mm dia bore
40 mm dia bore
50 mm dia bore
S&F in repairs following capacity triple layer, rotational moulded, polythene water storage tank (Cylindrical vertical with closed top) hoisted and fixed on roof in position, including all fitting such as connection pieces with GI tank nipple for inlet, outlet, washout and overflow etc complete.
M&Lfor preparing old painted steel and iron surfaces of any description over 10 cm width or girth not otherwise described and applying one coat of synthetic enamel paint all as specified & directed by the Engr-in-Charge.
M&L for complete removal of existing treatment old surfaces of walls including brooming down or scraping down with steel wire brushes & preparing the surfaces and applying two coats of finishing walls with Premium Acrylic Smooth exterior emulsion paint with Silicone additives of required shade: New work (Two or more coats applied @ 1.43 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm)® upto OHT 24 METER complete all as specified and directed. Make: Asian/Berger Nerolac or equivalent Note : Rate quoted by the contractor deemed to be include. Safety precautions like rope, safety belts, scaffolding helmets , ladder etc & shall be responsibility of contractor.
Supply only Stequa 411AE, Refill. Declibac Specification:-Chlorine tablets contained in plastic cylindrical sealed disposable sanitiser refill for disinfiction of drinking waterwith arrangements of controlled release of disinfectant in water, suitable for operation through recommended dosing system replacement indication, visual and weight variation operation type non contact, non inhalatory, heavymetal contaminants (like Hg and Pb) in product media must be belowdetection limit (BDL) and product must pass through acute toxicity test, based on which the product must be considerd safe to use from human health safety point of view when use in recommended dosage all as specified and as directed by Engr-in-charge.
Supply & installation Stequa Dosing System Model ADS - PRO, for open discharge / sump dosing / above ground centrifugal water pump installation:- (a) Receptacle for power-free automatic water sanitizer / conditioning treatment station with proportional dosing arrangement with following attachments:- (i) Water inlet regulator. (ii) Overflow vent. (iii) Water outlet regulator with non-return valve (for standalone gravity flow). (iv) Water outlet regulator (for offline automated gravity flow).(v) Drain valve. (vi) Fluid level controller. (vii) Sludge level guage. (viii) Station base assembly with station base buffer.(ix) Station hood assembly with multi-cavity arrangement (13).(x) Station holding assembly. (xi) Material of construction: Non-metallic thermoplastic. (xii) Maximum Temperature: 45°C. (xiii) Capacity: 100 litres. (xiv). Shape: Cylindrical. (b) Custom cover for power-free automatic water sanitiser / conditioning treatment station with proportional dosing arrangement with following attachments: (i) Refill cavity lids (13), (ii) In-built level switch & processor. (iii) ½ inch Processor outlet & processor inlet connections. (iv) Flexible connecting duct. (v) Material of construction: Non-metallic. (vi) Maximum Temperature: 45°C. (vii) Shape: Circular. (c) Additional Fittings: (i) 6 Meter suction tubing. (ii) PVC ball valve. (iii) Plastic check valve. (iv) Hose nipple, Compatibility: Stequa 411 AE Refill for submersible water pump installation or universal application, additionally following item is required: Centrifugal pump with following specifications: (i) Power: 1 HP; 0.75 kW. (ii) Pipe size (Suction): 1". (iii) Pipe size (Delivery): 1". (iv) Total Head: up to 6 Bars. (v) Discharge: up to 3700 LPH. all as specified and as directed by Engr-in-charge.
Supply and fittings in replacement of gun metal gate / globe valve with iron wheel head screwed both ends for iron pipe fixed in the inlet / outlet of the service tanks complete all as specified and as directed by Engineer-in-Charge.
15 mm dia bore
20 mm dia bore
25 mm dia bore
40 mm dia bore
50 mm dia bore
Suchit constructions
ONKAR ELECTRIC AND GENERAL STORE
shree ram enterprises
SKS Electricals
visionenterprises
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .