Loading…
Loading…
Tender Value
₹10 L
EMD Value
₹30,000
Closing Date
3 Sept 2026, 3:00 pm7d left
EXECUTIVE ENGINEER REW KUPWARA
EXECUTIVE ENGINEER REW KUPWARA
Construction of 02 Roomed Building for GMS Manchater, Block Reddi Chowkibal
2026_RDPR_322469_16
NIT NO 102 OF 2026-27 ADF CDF
Open Tender
Civil Works
Percentage
EXECUTIVE ENGINEER REW KUPWARA
Please refer Tender documents.
2 documents required · 2 mandatory
₹300
EXECUTIVE ENGINEER REW KUPWARA
₹30,000
27 Aug 2026
27 Aug 2026
3 Sept 2026
27 Aug 2026
3 Sept 2026
27 Aug 2026
27 Aug 2026 - 27 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in foundation trenches or drains (not exceeding 1.5M in width as well as 10Sqm on plan) including dressing of sides ramming of bottoms lift up to 1.5M including getting out the excavated soil and disposal of surplus excavated soil within a lead of 1 M from edge of cutting. | 18.05 | Cum | 479.3 | ₹8,651.37 |
| 2 | Providing and laying of hand packed boulders in foundation trenches including ramming watering all complete job | 6.5 | Cum | 1,000 | ₹6,500 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering. All works up to plinth level in M-7.5(1:4:8) grade, with 40mm nominal size of (nallah stone aggregates). | 6 | Cum | 5,202.9 | ₹31,217.4 |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering.All works upto plinth level in M-10(1:3:6) grade, with 20mm nominal size of nallah stone aggregates,with 20% boulders. | 15.5 | Cum | 5,733.6 | ₹88,870.8 |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering.All works upto plinth level in M-20(1:1.5:3) grade, with 20mm nominal size of crushed stone aggregates. | 4.4 | Cum | 9,023.85 | ₹39,704.94 |
| 6 | Reinforcement of R.c.c work in plinth band, lintel band and beams incl. straightening, cutting, bending, placing in position and binding all complete. | 440 | Kg | 123 | ₹54,120 |
| 7 | Brick work with F.P.S bricks of class designation 75 in 1:6 (cement: sand) mortar. | 9.35 | Cum | 9,027.2 | ₹84,404.32 |
| 8 | Providing form work for slab base, beams and lintel band including strutting, propping and removal of form. Foundtion | 72 | Sqm | 286.35 | ₹20,617.2 |
| 9 | Lintel Band,verandah Beams | 19.14 | Sqm | 718.2 | ₹13,746.35 |
| 10 | Providing wood work in frames of Doors, windows, cierestory windows and other frames, wrought framed and fixed in position with hold fast lugs of required dia and length of imported wood complete jobs. | 0.74 | Cum | 55,000 | ₹40,920 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.26 MB
BOQ_1081701.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].