Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹33.9 LAdmitted-Fee/PreQual/Technical/Finance | ₹33.9 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹35.2 L+₹1.4 L (4.06%)Admitted-Fee/PreQual/Technical/Finance | ₹35.2 L+₹1.4 L (4.06%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹37.6 L+₹3.8 L (11.2%)Admitted-Fee/PreQual/Technical/Finance | ₹37.6 L+₹3.8 L (11.2%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹37.9 L+₹4.1 L (12.0%)Admitted-Fee/PreQual/Technical/Finance | ₹37.9 L+₹4.1 L (12.0%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | Jenefa Constructions L4 | PACHESWARI L3 | Sumathi L2 | NANDAKUMAR ENTERPRISES L1 |
|---|---|---|---|---|---|---|---|
| 1.00 | Earth work open excavation by manual means in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the excavated earth with a lead of 10 mts. within the compound in places shown by the departmental officers and clearing and levelling the site, etc., complete complying with standard specification and as direct-ed by the departmental officers. | 72.6 | M3 | 13,068 ₹15,420.24 | 7,986 ₹9,423.48 | 11,616 ₹13,706.88 | 7,260 ₹8,566.8 Lowest |
| 2.00 | Supply and filling of crusher stone dust on foundation and basement not exceed 15 cm thick on each layer including cost and conveyance and all labour charges for filling and consolidation charges etc complete | 24.2 | M3 | 8,470 ₹9,994.6 | 41,140 ₹48,545.2 | 7,260 ₹8,566.8 Lowest | 19,360 ₹22,844.8 |
| 3.00 | Plain cement concrete 1;5:10 mix using 40 mm HBG ISS metal including cost and conveyance of all materials and including all labour charges etc complete | 96.3 | M3 | 4,81,500 ₹5,68,170 | 4,81,500 ₹5,68,170 | 5,15,205 ₹6,07,941.9 | 4,33,350 ₹5,11,353 Lowest |
| 4.00 | Centering and shuttering chsrages for All PCC and RCC works using MS steel Moulds and soffits strutting with casurina props 10-13 cm dia including cost and conveyance of all materials and including all labour charges etc complete | 640 | M2 | 5,76,000 ₹6,79,680 | 3,84,000 ₹4,53,120 | 2,68,800 ₹3,17,184 Lowest | 2,88,000 ₹3,39,840 |
| 5.00 | Supply and filling in foundation and basement with Gravel in layers of not more than 15cm.thick well rammed watered and compacted with surface vibrator, watered and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 72.6 | M3 | 1,30,680 ₹1,54,202.4 | 43,560 ₹51,400.8 | 32,670 ₹38,550.6 Lowest | 43,560 ₹51,400.8 |
| 6.00 | Providing and laying, spreading and compacting graded stone aggregate to Wet mix macadam (WMM) specification including premixing the material with water at OMC in mechanical mix plant carriage to mixed material by tipper to site laying in uniform layers with paver in sub base / base course on well prepared surface and compacting with vibratory roller to achive the desired density complete as per clasue 406 of MORTH specifications. | 72.6 | M3 | 1,66,980 ₹1,97,036.4 | 1,78,596 ₹2,10,743.28 | 1,59,720 ₹1,88,469.6 | 1,45,200 ₹1,71,336 Lowest |
| 7.00 | Plain Cement Concrete 1:2:4 (one cement, two crushed stone sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers.-Mixing by mechanical means | 64.2 | M3 | 4,43,622 ₹5,23,473.96 | 4,30,140 ₹5,07,565.2 | 4,30,140 ₹5,07,565.2 | 4,17,300 ₹4,92,414 Lowest |
| 8.00 | Paving the floor with pre-polished concrete anti-skid tiles (Required shape and design) of 20mm thick of approved quality and colour laid in accordance with IS 1443 over a cement mortar bed of 20mm thick in Cement Mortar 1:3 (One Cement and Three crushed stone sand) with required Cement Slurry and Mortar Plasticizer and pointed with white cement mixed with colouring pigment at the rate of 0.40 Kg. / sq.m., curing, etc., complete complying with standard specification and as directed by the departmental officers. (The make and brand of the tiles should be got approved by Executive Engineer before use on works) | 880 | M2 | 11,88,000 ₹14,01,840 Lowest | 13,73,680 ₹16,20,942.4 | 11,88,000 ₹14,01,840 Lowest | 13,00,640 ₹15,34,755.2 |
| 9.00 | Painting New Plastered Wall Surface with Two finishing coats of ready mixed (Emulsion) of approved quality and colour over one coat priming coat in all floors including the cost of primer etc., complete complying with standard specification and as directed by the departmental officers.(The make, quality and colour of paint should be got approved by the Executive Engineer before use on works.) | 120 | M2 | 24,000 ₹28,320 | 30,000 ₹35,400 | 21,600 ₹25,488 Lowest | 24,000 ₹28,320 |
| 10.00 | Reinforced Cement Concrete Bollards with M20 grade concrete and 150mm dia 4 Nos of 10mm dia TMT of overall size 800mm, 100mm projection of TMT Roads at the bottom of the Bollards beyond 800mm for anchor. Black pigment at 4.5 percent weight to cement will be used. Two Strips of Reflective 3M Sticker of width 40mm, including transportation and fixing charges etc, complete. (GCC BRR SOR, BRR - CC Bollard, P.No:14) | 40 | Nos | 80,000 ₹94,400 Lowest | 1,12,000 ₹1,32,160 | 3,00,000 ₹3,54,000 | 1,00,000 ₹1,18,000 |
Tender Value
₹40 L
EMD Value
₹40,000
Closing Date
28 Jul 2026, 3:00 pmClosed
THE COMMISSIONER TAMBARAM CORPORATION
Muthurangan Street,West Tambaram
Providing Foothpath arrangement for Bharathamada Street ward no 48 in Tambaram City Municipal Corporation
2026_DMA_684799_7
006/2026/E2/Z5
Open Tender
Civil Works
Works
Zone V
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹40,000
28 Jul 2026
9 Jul 2026
28 Jul 2026
9 Jul 2026
28 Jul 2026
9 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | GST % |
|---|---|---|---|---|---|---|
| 1 | Earth work open excavation by manual means in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the excavated earth with a lead of 10 mts. within the compound in places shown by the departmental officers and clearing and levelling the site, etc., complete complying with standard specification and as direct-ed by the departmental officers. | 72.6 | M3 | - | - | 18% |
| 2 | Supply and filling of crusher stone dust on foundation and basement not exceed 15 cm thick on each layer including cost and conveyance and all labour charges for filling and consolidation charges etc complete | 24.2 | M3 | - | - | 18% |
| 3 | Plain cement concrete 1;5:10 mix using 40 mm HBG ISS metal including cost and conveyance of all materials and including all labour charges etc complete | 96.3 | M3 | - | - | 18% |
| 4 | Centering and shuttering chsrages for All PCC and RCC works using MS steel Moulds and soffits strutting with casurina props 10-13 cm dia including cost and conveyance of all materials and including all labour charges etc complete | 640 | M2 | - | - | 18% |
| 5 | Supply and filling in foundation and basement with Gravel in layers of not more than 15cm.thick well rammed watered and compacted with surface vibrator, watered and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 72.6 | M3 | - | - | 18% |
| 6 | Providing and laying, spreading and compacting graded stone aggregate to Wet mix macadam (WMM) specification including premixing the material with water at OMC in mechanical mix plant carriage to mixed material by tipper to site laying in uniform layers with paver in sub base / base course on well prepared surface and compacting with vibratory roller to achive the desired density complete as per clasue 406 of MORTH specifications. | 72.6 | M3 | - | - | 18% |
| 7 | Plain Cement Concrete 1:2:4 (one cement, two crushed stone sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers.-Mixing by mechanical means | 64.2 | M3 | - | - | 18% |
| 8 | Paving the floor with pre-polished concrete anti-skid tiles (Required shape and design) of 20mm thick of approved quality and colour laid in accordance with IS 1443 over a cement mortar bed of 20mm thick in Cement Mortar 1:3 (One Cement and Three crushed stone sand) with required Cement Slurry and Mortar Plasticizer and pointed with white cement mixed with colouring pigment at the rate of 0.40 Kg. / sq.m., curing, etc., complete complying with standard specification and as directed by the departmental officers. (The make and brand of the tiles should be got approved by Executive Engineer before use on works) | 880 | M2 | - | - | 18% |
| 9 | Painting New Plastered Wall Surface with Two finishing coats of ready mixed (Emulsion) of approved quality and colour over one coat priming coat in all floors including the cost of primer etc., complete complying with standard specification and as directed by the departmental officers.(The make, quality and colour of paint should be got approved by the Executive Engineer before use on works.) | 120 | M2 | - | - | 18% |
| 10 | Reinforced Cement Concrete Bollards with M20 grade concrete and 150mm dia 4 Nos of 10mm dia TMT of overall size 800mm, 100mm projection of TMT Roads at the bottom of the Bollards beyond 800mm for anchor. Black pigment at 4.5 percent weight to cement will be used. Two Strips of Reflective 3M Sticker of width 40mm, including transportation and fixing charges etc, complete. (GCC BRR SOR, BRR - CC Bollard, P.No:14) | 40 | Nos | - | - | 18% |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.96 MB
BOQ_823211.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .