Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.1 LAccepted-AOC SUBASH NAGAR W NO 5 H NO 354 BEHIND SBI UDHAMPUR J K 182101 | UDHAMPUR | JAMMU AND KASHMIR | 182101 | L1 | Accepted-AOC BEING L1 | |
| 2 | L2₹11.0 L+₹1.9 L (20.3%)Rejected-Finance B 56 LANE NO 4A SECTOR 7 VASHNAVI ENCLAVE CHANNI HIMAT JAMMU 180015 | JAMMU | JAMMU AND KASHMIR | 180015 | L2 | Rejected-Finance BEING L2 | |
| 3 | L3₹11.6 L+₹2.5 L (27.2%)Rejected-Finance | L3 | Rejected-Finance BEING L3 | |
| 4 | L4₹13.2 L+₹4.0 L (43.9%)Rejected-Finance | L4 | Rejected-Finance BEING L4 |
| Sl No | Description | Qty | Unit | rajkumar sharma L4 | ANIKET TRADERS L2 | APARANA ENTERPRISES L1 | TARUN BUILDERS L3 |
|---|---|---|---|---|---|---|---|
| 1.00 | Demolition of brick work or stone/ boulder masonry, built in cement mortar including all quoins, arches, pillars, etc. and removing from site all as specified and directed. | 289 | Cum | 100 ₹28,900 | 100 ₹28,900 | 50 ₹14,450 Lowest | 90 ₹26,010 |
| 2.00 | M&L for PCC 1:3:6 Type C-2 (using 40mm graded Agg) as in foundations, filling and mass concrete, complete all as specified and as directed. | 35 | Cum | 4,200 ₹1,47,000 | 2,500 ₹87,500 Lowest | 4,300 ₹1,50,500 | 3,500 ₹1,22,500 |
| 3.00 | M&L for Walling of random rubble, regular coursed, well bonded, bedded and solidly hearted, built in built in cement mortar 1:4 complete all as directed. | 65 | Cum | 3,500 ₹2,27,500 | 3,000 ₹1,95,000 | 1,400 ₹91,000 Lowest | 2,650 ₹1,72,250 |
| 4.00 | M&L for Walling of random rubble, uncoursed, well bonded, laid dry in retaining walls, abutments and similar work complete all as directed. | 120 | Cum | 2,500 ₹3,00,000 | 2,200 ₹2,64,000 | 900 ₹1,08,000 Lowest | 2,500 ₹3,00,000 |
| 5.00 | All as per item No-01 but except stone in walling of random rubble, uncoursed, well bonded, laid dry in retaining walls, abutments and similar work complete all as directed. | 100 | Cum | 900 ₹90,000 | 1,200 ₹1,20,000 | 300 ₹30,000 Lowest | 1,500 ₹1,50,000 |
| 6.00 | M&L for Raised pointing to random or polygonal rubble, uncoursed or brought upto courses built in CM-1:4 complete all as directed. | 6 | 10 Sqm | 2,560 ₹15,360 | 2,000 ₹12,000 | 1,000 ₹6,000 Lowest | 1,000 ₹6,000 Lowest |
| 7.00 | M&L for Aggregate of broken stone / boulders for loose filling, of gauge 80 mm to 150 mm graded complete all as directed. | 30 | Cum | 1,655 ₹49,650 | 1,400 ₹42,000 | 2,000 ₹60,000 | 900 ₹27,000 Lowest |
| 8.00 | M&L for Providing, cement concrete 1:2:4 type B1 (using 20mm graded agg) as in coping complete all as directed. | 4.8 | Cum | 9,250 ₹44,400 | 5,000 ₹24,000 Lowest | 7,000 ₹33,600 | 5,600 ₹26,880 |
| 9.00 | M&L for weep hole made in retaining wall in slope 1:8 of size 100x100 to be provided with smooth plaster finish staggered 600 c/c complete all as directed. | 200 | Each | 200 ₹40,000 | 100 ₹20,000 | 200 ₹40,000 | 70 ₹14,000 Lowest |
| 10.00 | Demolition of cement concrete (unreinforced) of any description and in any position not otherwise specifically provided for complete all as directed. | 16.62 | Cum | 100 ₹1,662.5 | 100 ₹1,662.5 | 500 ₹8,312.5 | 90 ₹1,496.25 Lowest |
Tender Value
Refer Docs
EMD Value
₹41,500
Closing Date
14 Jul 2026, 6:00 pmClosed
GE AF UDHAMPUR
GE (AF) STN UDHAMPUR
SPECIAL REPAIR TO RETAINING WALL ALONGWITH ASSOCIATED WORKS AT 39 WING AIR FORCE
2026_MES_772679_1
GEAFU-45/2026-27
Open Tender
Civil Works
Item Rate
120 days
GE (AF) STATION UDHAMPUR
Please refer Tender documents.
7 documents required · 7 mandatory
₹500
GE (AF) UDHAMPUR
₹41,500
25 Jul 2026
16 Jun 2026
16 Jul 2026
16 Jun 2026
14 Jul 2026
30 Jun 2026
16 Jun 2026 - 23 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolition of brick work or stone/ boulder masonry, built in cement mortar including all quoins, arches, pillars, etc. and removing from site all as specified and directed. | 289 | Cum | - | - |
| 2 | M&L for PCC 1:3:6 Type C-2 (using 40mm graded Agg) as in foundations, filling and mass concrete, complete all as specified and as directed. | 35 | Cum | - | - |
| 3 | M&L for Walling of random rubble, regular coursed, well bonded, bedded and solidly hearted, built in built in cement mortar 1:4 complete all as directed. | 65 | Cum | - | - |
| 4 | M&L for Walling of random rubble, uncoursed, well bonded, laid dry in retaining walls, abutments and similar work complete all as directed. | 120 | Cum | - | - |
| 5 | All as per item No-01 but except stone in walling of random rubble, uncoursed, well bonded, laid dry in retaining walls, abutments and similar work complete all as directed. | 100 | Cum | - | - |
| 6 | M&L for Raised pointing to random or polygonal rubble, uncoursed or brought upto courses built in CM-1:4 complete all as directed. | 6 | 10 Sqm | - | - |
| 7 | M&L for Aggregate of broken stone / boulders for loose filling, of gauge 80 mm to 150 mm graded complete all as directed. | 30 | Cum | - | - |
| 8 | M&L for Providing, cement concrete 1:2:4 type B1 (using 20mm graded agg) as in coping complete all as directed. | 4.8 | Cum | - | - |
| 9 | M&L for weep hole made in retaining wall in slope 1:8 of size 100x100 to be provided with smooth plaster finish staggered 600 c/c complete all as directed. | 200 | Each | - | - |
| 10 | Demolition of cement concrete (unreinforced) of any description and in any position not otherwise specifically provided for complete all as directed. | 16.63 | Cum | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.40 MB
BOQ_865225.xls
BOQ • 8.16 MB
TENDER45.pdf
Tender Documents • 1.53 MB
Amdt45.pdf
PDF • 1.20 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .