Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.0 LAdmitted-Finance | -52.10% | ₹1.0 L | L1 | Admitted-Finance |
| 2 | L2₹1.1 LAdmitted-Finance | -47.85% | ₹1.1 L | L2 | Admitted-Finance |
| 3 | L3₹1.1 LAdmitted-Finance | -46.34% | ₹1.1 L | L3 | Admitted-Finance |
| 4 | L4₹1.2 LAdmitted-Finance | -41.69% | ₹1.2 L | L4 | Admitted-Finance |
| 5 | L5₹1.3 LAdmitted-Finance | -40.37% | ₹1.3 L | L5 | Admitted-Finance |
Updated dates
Tender Value
₹2.1 L
EMD Value
₹4,180
Closing Date
30 Dec 2025, 6:55 pmClosed
Executive Engineer
Executive Engineer RCC Lower Division Hiranagar
Improvement Renovation of SM 1 of M 3 of D 10 of Main Ravi Canal from RD 1500 to 3000M at spots
2025_IFC_298713_3
e-NIT No. 03 of 2025-26
Open Tender
Civil Works - Canal
20 days
Hiranagar
As per NIT
2 documents required · 2 mandatory
₹600
Executive Engineer RCC Lower Division Hiranagar
₹4,180
Executive Engineer RCC Lower Division Hiranagar
13 Jan 2026
22 Dec 2025
31 Dec 2025
22 Dec 2025
30 Dec 2025
22 Dec 2025
22 Dec 2025 - 26 Dec 2025
26 Dec 2025
Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-in charge: 1:3:6 or richer mix (i/c equivalent design mix)
Dismantling concrete grouted stone pitching in aprons drains etc. including stacking of serviceable material and disposal of unserviceable material, stacking /disposal lead upto 100 meters.
Dry stone pitching (any thickness) excluding cost of stones. On Horizontal
Dry stone pitching (any thickness) excluding cost of stones. On Slopes
Grouting of stone pitching using M-10 nominal mix concrete (max. size of aggregates; 20mm nominal) @ 6.00 cum per 100 sq m on horizontal/side slopes; complete including curing.
Supply of Nallah Stone
Carriage of Materials from Source to site of work a) Carriage of Sand and Bajri av. 10 Kms by Mechincal Transport
Carriage of Materials from Source to site of work b) Carriage of Nallah Stone av. 08 Kms by Mechincal Transport
Disposal of earth av. 02 Kms by Mechincal Transport and Dismentaled material
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.67 MB
BOQ_968378.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid