Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.5 LAccepted-AOC | L1 | Accepted-AOC Accepted | |
| 2 | L2₹8.1 L+₹67,200 (9.01%)Rejected-AOC | L2 | Rejected-AOC rejected | |
| 3 | L3₹8.4 L+₹89,398 (12.0%)Rejected-Finance | L3 | Rejected-Finance rejected | |
| 4 | L4₹8.9 L+₹1.4 L (18.7%)Rejected-Finance | L4 | Rejected-Finance rejected | |
| 5 | L5₹9.0 L+₹1.6 L (21.1%)Rejected-Finance | L5 | Rejected-Finance rejected |
| Sl No | Description | Qty | Unit | SVR CONSTRUCTION L6 | PANDIAN CONSTRUCTION L3 | A ULAGU LAKSHMANAN L2 | MAKESHWARI L5 | Dhivakaran L1 | PTK CONSTRUCTION L4 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Earthwork excavation for foundation and depositing on Bank within initial lead of 10mt and lift of 2mt of all soil except rock etc., complete complying with standard specification. | 85 | m3 | 37,740 ₹37,740 | 24,650 ₹24,650 | 12,750 ₹12,750 Lowest | 25,500 ₹25,500 | 22,015 ₹22,015 | 26,095 ₹26,095 |
| 2.00 | P.C.C.1:4:8 mix using 40mm metal and the rate including cost and conveyance of all materials to work site and labour charges etc., complete complying with standard specification | 22 | m3 | 1,78,640 ₹1,78,640 | 1,54,418 ₹1,54,418 | 1,58,400 ₹1,58,400 | 1,76,000 ₹1,76,000 | 1,37,874 ₹1,37,874 Lowest | 1,63,614 ₹1,63,614 |
| 3.00Supply and erection of steel centering' and the rate including cost and conveyance of all materials to work site and labour charges etc., complete complying with standard specification | |||||||||
| 3.01 | Below 1m Height | 232 | m2 | 1,50,800 ₹1,50,800 | 1,29,920 ₹1,29,920 | 1,27,600 ₹1,27,600 | 1,39,200 ₹1,39,200 | 1,16,000 ₹1,16,000 Lowest | 1,37,808 ₹1,37,808 |
| 4.00 | Plain Cement Concrete 1:3:6 Mix (one part cement, two part sand and four part of aggrigate) using 40mm size ISS HBG metal machine crushed from approved quarry including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing etc. complete. Complying with std. specifications. | 25 | m3 | 2,20,000 ₹2,20,000 | 1,91,650 ₹1,91,650 | 1,95,000 ₹1,95,000 | 2,07,500 ₹2,07,500 | 1,71,125 ₹1,71,125 Lowest | 2,03,050 ₹2,03,050 |
| 5.00 | P.C.C.1:2:4 mix using 20mm metal and the rate including cost and conveyance of all materials to work site and labour charges etc., complete complying with standard specification | 35 | m3 | 3,53,500 ₹3,53,500 | 2,87,560 ₹2,87,560 | 2,80,000 ₹2,80,000 | 3,04,500 ₹3,04,500 | 2,56,760 ₹2,56,760 Lowest | 3,04,675 ₹3,04,675 |
| 6.00 | Supplying fabricating and placing in position of steel rods using TMT. or Ribbed Tor Steel including cost of binding wire, cost of labour charges for fabrication and placing in position etc. Complete. Complying with std. specifications. | 140 | Kg | 17,500 ₹17,500 | 12,460 ₹12,460 | 12,600 ₹12,600 | 14,000 ₹14,000 | 11,200 ₹11,200 Lowest | 13,300 ₹13,300 |
| 7.00 | Reinforced Cement Concrete 1:1½:3 Mix (One part cement, one and half part sand and three part of aggregate)using 20mm size ISS HBG metal machine crushed from approved quarry including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing but excluding cost of reinforcement etc. Complete with std. Specifications. | 2 | m3 | 28,200 ₹28,200 | 20,218 ₹20,218 | 16,000 ₹16,000 Lowest | 22,000 ₹22,000 | 18,052 ₹18,052 | 21,420 ₹21,420 |
| 8.00 | Plastering with cement mortar 1:5 (One part of Cement and Five part of Plastering Sand (P- Sand)) 12mm, thick in all floors including cost and conveyance of all materilas to site and labour charges etc,complete as per standard specifications | 36 | m2 | 15,984 ₹15,984 | 14,472 ₹14,472 | 10,800 ₹10,800 Lowest | 14,400 ₹14,400 | 12,924 ₹12,924 | 15,336 ₹15,336 |
Tender Value
₹12 L
EMD Value
₹12,000
Closing Date
7 Oct 2026, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
THE EXECUTIVE OFFICER
THE EXECUTIVE OFFICER KILKUNDAH TOWN PANCHAYAT
Construction of Drain and Footbath chennan house in kamarajnagar in kilkundah town panchayat
2026_DTP_709234_1
20262042
Open Tender
Civil Works
Works
90 days
KILKUNDAH TOWN PANCHAYAT
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹12,000
kilkundah town panchayat office
17 Nov 2026
30 Sept 2026
7 Oct 2026
30 Sept 2026
7 Oct 2026
30 Sept 2026
5 Oct 2026
120 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork excavation for foundation and depositing on Bank within initial lead of 10mt and lift of 2mt of all soil except rock etc., complete complying with standard specification. | 85 | m3 | 65 | ₹5,525 |
| 2 | P.C.C.1:4:8 mix using 40mm metal and the rate including cost and conveyance of all materials to work site and labour charges etc., complete complying with standard specification | 22 | m3 | 65 | ₹1,430 |
| 3Supply and erection of steel centering' and the rate including cost and conveyance of all materials to work site and labour charges etc., complete complying with standard specification | |||||
| 3.01 | Below 1m Height | 232 | m2 | 65 | ₹15,080 |
| 4 | Plain Cement Concrete 1:3:6 Mix (one part cement, two part sand and four part of aggrigate) using 40mm size ISS HBG metal machine crushed from approved quarry including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing etc. complete. Complying with std. specifications. | 25 | m3 | 65 | ₹1,625 |
| 5 | P.C.C.1:2:4 mix using 20mm metal and the rate including cost and conveyance of all materials to work site and labour charges etc., complete complying with standard specification | 35 | m3 | 65 | ₹2,275 |
| 6 | Supplying fabricating and placing in position of steel rods using TMT. or Ribbed Tor Steel including cost of binding wire, cost of labour charges for fabrication and placing in position etc. Complete. Complying with std. specifications. | 140 | Kg | 65 | ₹9,100 |
| 7 | Reinforced Cement Concrete 1:1½:3 Mix (One part cement, one and half part sand and three part of aggregate)using 20mm size ISS HBG metal machine crushed from approved quarry including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing but excluding cost of reinforcement etc. Complete with std. Specifications. | 2 | m3 | 65 | ₹130 |
| 8 | Plastering with cement mortar 1:5 (One part of Cement and Five part of Plastering Sand (P- Sand)) 12mm, thick in all floors including cost and conveyance of all materilas to site and labour charges etc,complete as per standard specifications | 36 | m2 | 75 | ₹2,700 |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_852277.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.51 MB
BOQ_852277.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .