| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.4 LAccepted-AOC CAMP AT SHADIPUR SRI VIJAYA PURAM | L1 | Accepted-AOC 1st lowest | |
| 2 | L2₹1.6 L+₹14,742 (10.4%)Rejected-Finance | L2 | Rejected-Finance 2nd Lowest | |
| 3 | L3₹1.7 L+₹24,880 (17.6%)Rejected-Finance | L3 | Rejected-Finance 3rd Lowest | |
| 4 | L4₹1.7 L+₹33,307 (23.5%)Rejected-Finance | L4 | Rejected-Finance 4th Lowest | |
| 5 | L5₹1.9 L+₹47,972.76 (33.9%)Rejected-Finance | L5 | Rejected-Finance 5th Lowest |
Tender Value
₹2.0 L
Closing Date
22 Feb 2022, 11:00 amClosed
Deputy Conservator of Forests
Silva Complex, Horticulture Road, Haddo
Construction of CC Drain (22 mtr x 0.90 mtr width) adjacent to the Range office-cum-garage at Silva Complex, Haddo
2022_DCFSL_5179_1
Silva/G-391/650
Open Tender
Construction Works
Works
15 days
Silva Complex, Horticulture Road, Haddo
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
Exempted
28 Apr 2022
15 Feb 2022
23 Feb 2022
15 Feb 2022
22 Feb 2022
15 Feb 2022
Amount
Earth work in excavation in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5m, including getting out and disposal of surplus excavated soil and disposal of surplus excavated soil as directed within a lead of 50m. (Ordinary rock)
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level: 1:4:8 (1 cement : 4 fine sand: 8 graded stone aggrgate 40mm nominal size)
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level: 1:3:6 (1 cement : 3 fine sand: 6 graded stone aggrgate 40mm nominal size)
Centring and shuttering including strutting, propping etc. And removal of form work for foundations, footings, bases for columns
Retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc.
12mm cement plaster of mix: 1:4 (1 cement : 4 coarse sand)
SONA MONA TRADERS
B S ENGINEERING
SPR CONSTRUCTION
M/S SUNDARAM CONSTRUCTION
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .