Tender Value
₹7.9 L
EMD Value
₹8,000
Closing Date
3 Oct 2026, 5:00 pm6d left
Superintending Engineer Kantabanji (RandB) Divn.
O/O the Superintending Engineer Kantabanji (RandB) Divn.
Provision of 63 KVA, 11/0.4KV Substation for Newly Constructed 100 Seated Boys Hostel of Odisha Adarsha Vidyalaya at Bhainsa under Patnagarh Block in Balangir District
2026_EICCL_141312_1
03/KBJ/2026-27
National Competitive Bid
Electrical Works
Percentage
60 days
KANTABANJI
2 documents required · 2 mandatory
₹4,000
₹8,000
Yes
21 Sept 2026
21 Sept 2026
5 Oct 2026
21 Sept 2026
3 Oct 2026
21 Sept 2026
21 Sept 2026 - 3 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | A-11kv Line AAAC tapping on RSJ/PSC Pole
PSC Pole 9 meter long X 300 kg including 1% LC, T&P @2%,Transportation @7.5%, Erection Charge @20% | 1 | Each | 5,559.3 | ₹5,559.3 |
| 2 | Cost of other materials for line and sub station
55 Sqmm AAAC including 1% LC,T&P @ 2%, Transportation @7.5%, Erection Charge @ 10% | 154.5 | Mtr. | 51.33 | ₹7,930.49 |
| 3 | 75X40X6mm. Channel for Straight Cross-arm including 1% LC,T&P @ 2%, Transportation @7.5%, Erection Charge @ 10% | 3.26 | Kg. | 111.22 | ₹363.02 |
| 4 | 11 KV V-Cross Arm(MS) (10.2 Kg each) including 1% LC,T&P @ 2%, Transportation @7.5%, Erection Charge @ 10% | 1 | Each | 1,385.99 | ₹1,385.99 |
| 5 | Back Clamp for V' Cross Arm(1.7kg) including 1% LC,T&P @ 2%, Transportation @7.5%, Erection Charge @ 10% | 1 | Each | 136.89 | ₹136.89 |
| 6 | 11 kv F clamp 2.9kg each including 1% LC,T&P @ 2%, Transportation @7.5%, Erection Charge @ 10% | 1 | Each | 410.66 | ₹410.66 |
| 7 | 11 Kv B&S Disc Insulator Polymer 70 KN including 1% LC,T&P @ 2%, Transportation @7.5%, Erection Charge @ 10% | 1 | Each | 1,967.77 | ₹1,967.77 |
| 8 | 11 KV B&S Hardware Fitting including 1% LC,T&P @ 2%, Transportation @7.5%, Erection Charge @ 10% | 1 | Each | 598.89 | ₹598.89 |
| 9 | 11 KV pin Insulator polymer including 1% LC,T&P @ 2%, Transportation @7.5%, Erection Charge @ 10% | 3 | Each | 342.22 | ₹1,026.66 |
| 10 | H.T. Stay Set Complete including 1% LC,T&P @ 2%, Transportation @7.5%, Erection Charge @ 10% | 1 | SET | 1,796.66 | ₹1,796.66 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_3.pdf
PDF • 0.51 MB
Tendernotice_2.pdf
PDF • 1.47 MB
Tendernotice_1.pdf
PDF • 0.53 MB
BOQ_610205.xls
BOQ • 0.47 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .