Loading…
Loading…
| # | Company | Offered Item | Amount | Rank |
|---|---|---|---|---|
| 1 | L1₹76.3 Cr Construction of Directors Bungalow, 49 Nos Staff Quarters (S plus G plus 16 Storey) and Student Activity Center (B plus G plus 3 storey) with Multipurpose Hall and Swimming Pool including all allied works at IIM Mumbai, Maharashtra. | Construction of Directors Bungalow, 49 Nos Staff Quarters (S plus G plus 16 Storey) and Student Activity Center (B plus G plus 3 storey) with Multipurpose Hall and Swimming Pool including all allied works at IIM Mumbai, Maharashtra. | ₹76.3 Cr | L1 |
| 2 | L2₹86.0 Cr+₹9.7 Cr (12.8%) Construction of Directors Bungalow, 49 Nos Staff Quarters (S plus G plus 16 Storey) and Student Activity Center (B plus G plus 3 storey) with Multipurpose Hall and Swimming Pool including all allied works at IIM Mumbai, Maharashtra. | Construction of Directors Bungalow, 49 Nos Staff Quarters (S plus G plus 16 Storey) and Student Activity Center (B plus G plus 3 storey) with Multipurpose Hall and Swimming Pool including all allied works at IIM Mumbai, Maharashtra. | ₹86.0 Cr+₹9.7 Cr (12.8%) | L2 |
| 3 | L3₹91.8 Cr+₹15.5 Cr (20.3%) Construction of Directors Bungalow, 49 Nos Staff Quarters (S plus G plus 16 Storey) and Student Activity Center (B plus G plus 3 storey) with Multipurpose Hall and Swimming Pool including all allied works at IIM Mumbai, Maharashtra. | Construction of Directors Bungalow, 49 Nos Staff Quarters (S plus G plus 16 Storey) and Student Activity Center (B plus G plus 3 storey) with Multipurpose Hall and Swimming Pool including all allied works at IIM Mumbai, Maharashtra. | ₹91.8 Cr+₹15.5 Cr (20.3%) | L3 |
| 4 | L4₹94.7 Cr+₹18.4 Cr (24.1%) Construction of Directors Bungalow, 49 Nos Staff Quarters (S plus G plus 16 Storey) and Student Activity Center (B plus G plus 3 storey) with Multipurpose Hall and Swimming Pool including all allied works at IIM Mumbai, Maharashtra. | Construction of Directors Bungalow, 49 Nos Staff Quarters (S plus G plus 16 Storey) and Student Activity Center (B plus G plus 3 storey) with Multipurpose Hall and Swimming Pool including all allied works at IIM Mumbai, Maharashtra. | ₹94.7 Cr+₹18.4 Cr (24.1%) | L4 |
| 5 | - | - | - |
Tender Value
₹90.6 Cr
EMD Value
₹1.0 Cr
Closing Date
4 Apr 2024, 3:00 pmClosed
EE&SM( C) -1
MUKUL KUMAR
EE and SM-1 CPWD 7th Floor CGO Complex CBD Belapur Navi Mumbai 400614
Construction of Directors Bungalow, 49 Nos Staff Quarters (S plus G plus 16 Storey) and Student Activity Center (B plus G plus 3 storey) with Multipurpose Hall and Swimming Pool including all allied works at IIM Mumbai, Maharashtra.
70063
01/NIT/CE cum ED/EE & SM -I/2023-24
OPEN
Civil Works - Buildings
NCB
24 months
Mumbai, Maharashtra
17 documents required · 17 mandatory
₹1.0 Cr
Conference Hall, Office of CE cum ED, 7th Floor CGO Complex, CBD Belapur, Navi Mumbai.
4 Apr 2024
28 Feb 2024
4 Apr 2024
4 Apr 2024
5 Mar 2024
5 Mar 2024
stage.html
html • 0.08 MB
boq_comp_chart.xls
xls
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
NIT+Part+A+to+D.pdf
document • 3.29 MB
NIT+Part+E+%28Soil+Testing+Report%29+Vol-I.pdf
document • 31.02 MB
NIT+Part+E+%28GCC%29+Vol-II.pdf
document • 27.38 MB
Tender+Drawings+%28Architecture%29+01-31.pdf
document • 28.96 MB
Tender+Drawings+%28Architecture%29+32-62.pdf
document • 21.54 MB
Tender+drawings+%28structure%29.pdf
document • 27.66 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .