| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.8 LAccepted-AOC | ₹3.8 L | L1 | Accepted-AOC L1 Accepted |
| 2 | L2₹3.8 LRejected-AOC 7 KALIANNAN EXTENSION VAIKKAL ROAD GOBI 638452 | GOBI | ERODE | TAMIL NADU | 638452 | ₹3.8 L | L2 | Rejected-AOC L2 Rejected |
| Sl No | Description | Qty | Unit | CHANDRASEKARAN C L1 | SELVARAJ P L2 |
|---|---|---|---|---|---|
| 1.00 | Earthwork excavation for foundation (for narrow excavation) to full depth as per designed in all soils and sub soils except soft disintegrated rock not requiring blasting and hard rock requiring blasting and bailing water wherever necessary. Refilling the sides of foundation with excavated earth other than sand in layers of well rammed and compacted and depositing the surplus earth in places shown by the departmental officers with an initial lead of 10m and initial lift of 2m and clearing and leveling the site etc. complete complying with standard specification. | 8.7 | Cum | 263 ₹2,288.1 | 275 ₹2,392.5 |
| 2.00 | Supplying and filling in foundations and basement with filling sand in layers not exceeding 15 cm. thick, well watered ,rammed and consolidated etc. complete complying with standard specifications | 13.76 | Cum | 2,100 ₹28,896 | 2,100 ₹28,896 |
| 3.00 | Cement concrete 1:4:8 mix using 40mm ISS HBG metal including including cost and conveyance and all labour charges | 13.76 | Cum | 5,839 ₹80,344.64 | 5,839 ₹80,344.64 |
| 4.00 | Supplying and erecting centering shuttering including cost and conveyance to site and all labours etc., complete. Side wall, Side, Culvert | 57.92 | Cum | 547.5 ₹31,711.2 | 560 ₹32,435.2 |
| 5.00 | Supplying and erecting centering shuttering including cost and conveyance to site and all labours etc., complete. Slab and side | 3.78 | Cum | 1,095 ₹4,139.1 | 1,095 ₹4,139.1 |
| 6.00 | Cement concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance and all labour charges | 15.83 | Cum | 8,937 ₹1,41,472.71 | 8,937 ₹1,41,472.71 |
| 7.00 | Supplying and fabrication of Steel including cost and conveyance and all labour charges | 0.12 | Kg | 92,016.78 ₹11,042.01 | 92,016.78 ₹11,042.01 |
| 8.00 | RCC 1:1.5:3 mix using 20mm ISS metal including cost and conveyance and all labour charges | 0.71 | Cum | 9,603 ₹6,818.13 | 9,603 ₹6,818.13 |
| 9.00 | Plstering in CM 1:5 to 12mm thick including cost and conveyance and all labour charges | 21.9 | Sqm | 288 ₹6,307.2 | 300 ₹6,570 |
| 10.00 | Supply and fixing of Bitumen pad for expansion joint including cost and conveyance and all labour charges | 0.9 | Cum | 719 ₹647.1 | 719 ₹647.1 |
Tender Value
₹3.8 L
EMD Value
₹3,790
Closing Date
5 Dec 2025, 10:00 amClosed
The Block Development Officer(VP)
Panchayat Union, Ariyalur
Providing CC road at Sundakudi Anna nagar Chelladurai house to Rega house in Sundakudi panchayat in Ariyalur block of Ariyalur District under Namma Oru Namma Arasu Thittam 2025-26
2025_RDTN_628999_1
RC.No.B/141/2025, Date.24.11.2025
Open Tender
Civil Works - Roads
60 days
Ariyalur
As per tender document
5 documents required · 5 mandatory
₹0
₹3,790
13 Jan 2026
4 Dec 2025
5 Dec 2025
4 Dec 2025
5 Dec 2025
4 Dec 2025
Amount
Earthwork excavation for foundation (for narrow excavation) to full depth as per designed in all soils and sub soils except soft disintegrated rock not requiring blasting and hard rock requiring blasting and bailing water wherever necessary. Refilling the sides of foundation with excavated earth other than sand in layers of well rammed and compacted and depositing the surplus earth in places shown by the departmental officers with an initial lead of 10m and initial lift of 2m and clearing and leveling the site etc. complete complying with standard specification.
Supplying and filling in foundations and basement with filling sand in layers not exceeding 15 cm. thick, well watered ,rammed and consolidated etc. complete complying with standard specifications
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including including cost and conveyance and all labour charges
Supplying and erecting centering shuttering including cost and conveyance to site and all labours etc., complete. Side wall, Side, Culvert
Supplying and erecting centering shuttering including cost and conveyance to site and all labours etc., complete. Slab and side
Cement concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance and all labour charges
Supplying and fabrication of Steel including cost and conveyance and all labour charges
RCC 1:1.5:3 mix using 20mm ISS metal including cost and conveyance and all labour charges
Plstering in CM 1:5 to 12mm thick including cost and conveyance and all labour charges
Supply and fixing of Bitumen pad for expansion joint including cost and conveyance and all labour charges
Provision for Name board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
SELVARAJ P (BID ID -1527399)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.60 MB
PriceBid4.pdf
Tender Documents • 0.23 MB
TechnicalBid4.pdf
Tender Documents • 0.34 MB
BOQ_752147.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid