ELECTRICAL HEAT TRACING FOR NEW BITUMEN TANKS
2500025171-HD-06600
5100025171
Open Tender
Unknown (Unspecified Location)
₹0
₹85 L
19 Feb 2026
29 Jan 2026
19 Feb 2026
19 Feb 2026
29 Jan 2026 - 9 Feb 2026
11 Feb 2026
| Item No | Item Title | Description | Qty | Unit |
|---|---|---|---|---|
| 1 | Electrical Heat Tracing | Electrical Heat Tracing — The scope includes the detailed design, supply, installation, testing, and commissioning of a Skin-Effect Heat Tracing (STS) system for 12" and 16" pipelines and Electrical heat tracing Conventional (SR) system for associated tapings and in-plant piping network as per piping GA drawing, isometrics and Stress Analysis reports attached as a part of this tender. A critical requirement for the STS is 100% redundancy (1 working + 1 standby) for all components, including heat tubes, 11kV Scott-T transformers, and secondary protection panels. For the STS, the vendor shall supply heat tubes and special insulated pipe supports but provide supervision only for their welding and installation (executed by HPCL), while fully supply and installing tracers, transformers, cabling, panels and other accessories required. The scope includes the complete supply and application of thermal insulation with cladding for both the STS and SR systems. Refer "Scope of work and specification document (E-222421-ELE-605-0005_REV 1_MR HEAT TRACING)" for detailed scope. Srl. Line Description Ship To Location UOM Schedule Rate HSN Code Location Mandatory No. GSTIN Schedule 2 Manadatory: Yes | - | Lump Sum |
| 1 | S&I of Skin Effect EHT for 16'' | S&I of Skin Effect EHT for 16'' — These unit prices shall apply to the complete STS system for any addition or deletion of pipeline lengths upto ±20% variation in pipe lengths from those mentioned as per the piping GA and isometric drawings included in the tender documents, encountered during execution of the job. Also, these shall be applied based on pipeline length addition or deletion. No separate rates shall be applicable for individual com ponents or equipment of the STS system, such as tracer cables, heat tubes, JBs, cables, PDBs, earthing, cable trays, etc. The prices for addition or deletion of STS system components shall be deemed to be included in the unit rate quoted for pipeline length additi on/deletion. | - | meter |
| 2 | S&I of Skin Effect EHT for 12'' | S&I of Skin Effect EHT for 12'' — These unit prices shall apply to the complete STS system for any addition or deletion of pipeline lengths upto ±20% variation in pipe lengths from those mentioned as per the piping GA and isometric drawings included in the tender documents, encountered during execution of the job. Also, these shall be applied based on pipeline length addition or deletion. No separate rates shall be applicable for individual com ponents or equipment of the STS system, such as tracer cables, heat tubes, JBs, cables, PDBs, earthing, cable trays, etc. The prices for addition or deletion of STS system components shall be deemed to be included in the unit rate quoted for pipeline length additi on/deletion. | - | meter |
| 3 | S&Supervision of Insula pipe | S&Supervision of Insula pipe — SUPPLY <(>&<)> SUPERVISION OF INSULATED PIPE SUPPORT FOR 16" PIPELINE(Note:Installation by HPCL under Vendor supervision) | - | each |
| 4 | S&Supervision of Insula pipe | S&Supervision of Insula pipe — SUPPLY <(>&<)> SUPERVISION OF INSULATED PIPE SUPPORT FOR 12" PIPELINE(Note:Installation by HPCL under Vendor supervision) | - | each |
| 5 | S&I of Thermal Insu for 16'' Line | S&I of Thermal Insu for 16'' Line — These shall be applied based on pipeline length addition or deletion. No separate rates shall be applicable for individual components of the Thermal Insulation System, such as insulation materials, cladding/jacketing, bands, screws, rivets, sealants, etc. The cost for addition or deletion of these components is deemed to be included in the composite unit rate quoted for pipeline length addition/deletion. | - | meter |
| 6 | S&I of Thermal Insu for 12'' Line | S&I of Thermal Insu for 12'' Line — These shall be applied based on pipeline length addition or deletion. No separate rates shall be applicable for individual components of the Thermal Insulation System, such as insulation materials, cladding/jacketing, bands, screws, rivets, sealants, etc. The cost for addition or deletion of these components is deemed to be included in the composite unit rate quoted for pipeline length addition/deletion. | - | meter |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
2500025171-HD-06600.pdf
TENDER_DOCUMENT • 8.97 MB
Download all tender documents and submit your bid