| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.6 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹2.6 L+₹521.33 (0.20%)Rejected-Finance BAGDOKRA FULKADABRI GRAM PANCHAYAT MEKHLIGANJ PANCHAYAT SAMITY P O FULKADABRI DIST COOCHBEHAR | JALPAIGURI | WEST BENGAL | 735122 | L2 | Rejected-Finance L2 | |
| 3 | L3₹2.6 L+₹782 (0.30%)Rejected-Finance | L3 | Rejected-Finance L3 |
Tender Value
₹2.6 L
EMD Value
₹5,213
Closing Date
14 Aug 2026, 2:00 pmClosed
PRODHAN BHOTBARI GP
BHOTBARI GP, MKG, COB
CONSTRUCTION OF DRAIN NEAR ASWINI ROY HOUSE AT KATHAL BARI WITHIN BHOTBARI GRAM PANCHAYAT UNDER MEKHLIGANJ DEVELOPMENT BLOCK.
2026_ZPHD_1036806_1
NIT-01/BGP/2026-27
Open Tender
CIVIL WORKS
Percentage
BHOTBARI GP
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,000
₹5,213
25 Aug 2026
7 Aug 2026
17 Aug 2026
7 Aug 2026
14 Aug 2026
7 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation trenches or drain in all sorts of Soil(Including mixed soi but excluding latrine or sand stone) including removing spreading or stacking the spoils with in a lead of 75m as directed. | - | m3. | 119.27 | - |
| 2 | Earth work in filling foundation trenches or plinth with good earth. In layer Complete. | - | m3. | 77.54 | - |
| 3 | Shingle Brick flat solling of picked jhama bricks including ramming and dressing bed proper level and filling joints with powdered earth or local sand. | - | m2. | 322 | - |
| 4 | Ordinary Cement Concrete (mix.1:2:4) with graded stone chips(20mm nominal size) …….relevant IS Codes.(b) River bazree | - | m3. | 4,069 | - |
| 5 | Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes. | 1 | m3. | 4,807 | ₹4,802.19 |
| 6 | Hire & Labur charges for shuttering with centering………………………… completation of works | 1 | m2. | 205 | ₹204.8 |
| 7 | Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups,binders etc. including supply of rods, initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape,placing in proper position and binding with 16 gauge black annealed wire at every inter-section, complete as per drawing and direction. (i) Tor steel/Mild Steel
I. SAIL/ TATA/RINL | - | MT | 62,418 | - |
| 8 | Plaster work in cement mortar
b) 20 mm Thick Plaster (1:6) | 1 | m2. | 157 | ₹156.84 |
| 9 | Neat cement Punning……………….. drain etc. | 1 | m2. | 34 | ₹34 |
| 10 | ADD GST @18% | - | no. | 39,369 | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.52 MB
BOQ_2546811.xls
BOQ • 0.22 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .