Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance 1 A OM SHIV CHS LTD G B ROAD MANPADA THANE MAHARASHTRA 400607 | THANE | MAHARASHTRA | 400607 | Admitted-Finance |
| 2 | Admitted-Finance E 112 ANSA INDUSTRIAL ESTATE SAKI VIHAR ROAD SAKINAKA ANDHERI EAST MUMBAI MAHARASHTRA 400072 | MUMBAI SUBURBAN | MAHARASHTRA | 400072 | Admitted-Finance |
| 3 | Admitted-Finance 10TH FLOOR A 1009 KAILAS BUSINESS PARK PREMISES CO OP SOCIETY LTD VEER SAVARKAR ROAD PARK SITE VIKHROLI WEST MUMBAI | Admitted-Finance |
| 4 | Rejected-Technical F 9 ZAKARIA AGHADI INDL ESTATE MAROL MAROSHI ROAD ANDHERI EAST MUMBAI MAHARASHTRA MUMBAI MAHARASHTRA 400059 | MUMBAI SUBURBAN | MAHARASHTRA | 400059 | Rejected-Technical Not prequalified |
| 5 | Rejected-Technical | Rejected-Technical Not prequalified |
Tender Value
Refer Docs
Closing Date
21 Apr 2021, 10:30 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
DGM MES
RCF Thal
E-TENDER FOR HOT AND COLD INSULATION JOBS AT RCF THAL
2021_RCFL_625649_1
TH/MES/ABW/21/C-37/171
Open Tender
Miscellaneous Works
Works
730 days
RCF THAL
As per tender Documents
12 documents required · 12 mandatory
₹0
Exempted
20 May 2021
6 Apr 2021
21 Apr 2021
6 Apr 2021
21 Apr 2021
6 Apr 2021
90 days
SUPPLY OF ITEMS AS PER FOLLOWING SPECIFICATIONS
SUPPLY HOT INSULATING MATL 30 MM THK
SUPPLY HOT INSULATING MATL 40MM THK
SUPPLY HOT INSULATING MATL 60 MM THK
SUPPLY HOT INSULATING MATL 80 MM THK
SUPPLY HOT INSULATING MATL 100 MM THK
SUPPLY HOT INSULATING MATL 120 MM THK
SUPPLY HOT INSULATING MATL 130 MM THK
SUPPLY HOT INSULATING MATL 150 MM THK
SUPPLY HOT INSULATING MATL 180 MM THK
SUPPLY HOT INSULATING MATL 200 MM THK
SUPPLY HOT INSULATING MATL 250 MM THK
SUPPLY HOT INSULATING MATL 300 MM THK
SUPPLY OF ALU. SHEET FOR 30 MM THK
SUPPLY OF ALU. SHEET FOR 40MM THK
SUPPLY OF ALU. SHEET FOR 60 MM THK
supply Allu. Sheet for 80 mm thk
supply Allu. Sheet for 100 mm thk
supply Allu. Sheet for 120 mm thk
supply Allu. Sheet for 130 mm thk
supply Allu. Sheet for 150 mm thk
supply Allu. Sheet for 180 mm thk
supply Allu. Sheet for 200 mm thk
supply Allu. Sheet for 250 mm thk
supply Allu. Sheet for 300 mm thk
supply Labour for -30 mm thk
supply Labour for -40mm thk
supply Labour for -60 mm thk
supply Labour for -80 mm thk
supply Labour for -100 mm thk
supply Labour for -120 mm thk
supply Labour for -130 mm thk
supply Labour for -150 mm thk
supply Labour for -180 mm thk
supply Labour for -200 mm th
supply Labour for -250 mm thk
supply Labour for -300 mm thk
SUPPLY Cold Insulatingng matl 40thk 1/2"pipe
SUPPLY Cold Insulatingng matl 65thk 1/2"pipe
SUPPLY Cold Insulatingng matl 90thk 1/2"pipe
SUPPLY Cold Insulatingng matl 115thk 1/2"pipe
SUPPLY Cold Insulatingng matl 40thk 3/4"pipe
SUPPLY Cold Insulatingng matl 65thk 3/4"pipe
SUPPLY Cold Insulatingng matl 90thk 3/4"pipe
SUPPLY Cold Insulatingng matl 115thk 3/4"pipe
SUPPLY Cold Insulatingng matl 40thk 1"pipe
SUPPLY Cold Insulatingng matl 65thk 1"pipe
SUPPLY Cold Insulatingng matl 90thk 1"pipe
SUPPLY Cold Insulatingng matl 115thk 1"pipe
SUPPLY Cold Insulatingng matl 40thk 1-1/2"pipe
SUPPLY Cold Insulatingn matl 65thk 1-1/2"pipe
SUPPLYCold Insulatingn matl 90thk 1-1/2"pipe
SUPPLY Cold Insulatingn matl115thk 1-1/2"pipe
SUPPLY Cold Insulatingng matl 40thk 2"pipe
SUPPLY Cold Insulatingng matl 65thk 2"pipe
SUPPLY Cold Insulatingng matl 90thk 2"pipe
SUPPLY Cold Insulatingng matl 115thk 2"pipe
SUPPLY Cold Insulatingng matl 40thk 3"pipe
SUPPLY Cold Insulatingng matl 65thk 3"pipe
SUPPLY Cold Insulatingng matl 90thk 3"pipe
SUPPLY Cold Insulatingng matl 115thk 3"pipe
SUPPLY Cold Insulatingng matl 40thk 4"pipe
SUPPLY Cold Insulatingng matl 65thk 4"pipe
SUPPLY Cold Insulatingng matl 90thk 4"pipe
SUPPLY Cold Insulatingng matl 115thk 4"pipe
SUPPLY Cold Insulatingng matl 40thk 6"pipe
SUPPLY Cold Insulatingng matl 65thk 6"pipe
SUPPLY Cold Insulatingng matl 90thk 6"pipe
SUPPLY Cold Insulatingng matl 115thk 6"pipe
SUPPLY Cold Insulatingng matl 40thk 8"pipe
SUPPLY Cold Insulatingng matl 65thk 8"pipe
SUPPLY Cold Insulatingng matl 90thk 8"pipe
SUPPLY Cold Insulatingng matl 115thk 8"pipe
SUPPLY Cold Insulatingng matl 40thk 10"pipe
SUPPLY Cold Insulatingng matl 65thk 10"pipe
SUPPLY Cold Insulatingng matl 90thk 10"pipe
SUPPLY Cold Insulatingng matl 115thk 10"pipe
SUPPLY Cold Insulatingng matl 40thk 12"pipe
SUPPLY Cold Insulatingng matl 65thk 12"pipe
SUPPLY Cold Insulatingng matl 90thk 12"pipe
SUPPLY Cold Insulatingng matl 115thk 12"pipe
SUPPLY Cold Insulatingng matl 40thk 14"pipe
SUPPLY Cold Insulatingng matl 65thk 14"pipe
SUPPLY Cold Insulatingng matl 90thk 14"pipe
SUPPLY Cold Insulatingng matl 115thk 14"pipe
SUPPLY Cold Insulatingng matl 40thk 16"pipe
SUPPLY Cold Insulatingng matl 65thk 16"pipe
SUPPLY Cold Insulatingng matl 90thk 16"pipe
SUPPLY Cold Insulatingng matl 115thk 16"pipe
SUPPLY Cold Insulatingng matl 40thk 18"pipe
SUPPLY Cold Insulatingng matl 65thk 18"pipe
SUPPLY Cold Insulatingng matl 90thk 18"pipe
SUPPLY Cold Insulatingng matl 115thk 18"pipe
SUPPLY Cold Insulatingng matl 40thk 20"pipe
SUPPLY Cold Insulatingng matl 65thk 20"pipe
SUPPLY Cold Insulatingng matl 90thk 20"pipe
SUPPLY Cold Insulatingng matl 115thk 20"pipe
SUPPLY Cold Insulatingng matl 40thk 24"pipe
SUPPLYCold Insulatingng matl 65thk 24"pipe
SUPPLY Cold Insulatingng matl 90thk 24"pipe
SUPPLY Cold Insulatingng matl 115thk 24"pipe
SUPPLY Cold Insulatingng matl 40thk on Vessel
SUPPLY Cold Insulatingng matl 65thk on Vessel
SUPPLY Cold Insulatingng matl 90thk on Vessel
SUPPLY Cold Insulatingng matl 115thk on Vessel
supply Allu. Sheet -1/2"pipe 40thk
supply Allu. Sheet -1/2"pipe 65 thk
supply Allu. Sheet -1/2"pipe 90thk
supply Allu. Sheet -1/2"pipe 115thk
supply Allu. Sheet -3/4"pipe 40thk
supply Allu. Sheet -3/4"pipe 65 thk
supply Allu. Sheet -3/4"pipe 90thk
supply Allu. Sheet -3/4"pipe 115thk
supply Allu. Sheet -1"pipe 40thk
supply Allu. Sheet -1"pipe 65 thk
supply Allu. Sheet -1"pipe 90thk
supply Allu. Sheet -1"pipe 115thk
supply Allu. Sheet -1-1/2"pipe 40thk
supply Allu. Sheet -1-1/2"pipe 65 thk
supply Allu. Sheet -1-1/2"pipe 90thk
supply Allu. Sheet -1-1/2"pipe 115thk
supply Allu. Sheet -2"pipe 40thk
supply Allu. Sheet -2"pipe 65 thk
supply Allu. Sheet -2"pipe 90thk
supply Allu. Sheet -2"pipe 115thk
supply Allu. Sheet -3"pipe 40thk
supply Allu. Sheet -3"pipe 65 thk
supply Allu. Sheet -3"pipe 90thk
supply Allu. Sheet -3"pipe 115thk
supply Allu. Sheet -4"pipe 40thk
supply Allu. Sheet -4"pipe 65 thk
supply Allu. Sheet -4"pipe 90thk
supply Allu. Sheet -4"pipe 115thk
supply Allu. Sheet -6"pipe 40thk
supply Allu. Sheet -6"pipe 65 thk
supply Allu. Sheet -6"pipe 90thk
supply Allu. Sheet -6"pipe 115thk
supply Allu. Sheet -8"pipe 40thk
supply Allu. Sheet -8"pipe 65 thk
supply Allu. Sheet -8"pipe 90thk
supply Allu. Sheet -8"pipe 115thk
supply Allu. Sheet -10"pipe 40thk
supply Allu. Sheet -10"pipe 65 thk
supply Allu. Sheet -10"pipe 90thk
supply Allu. Sheet -10"pipe 115thk
supply Allu. Sheet -12"pipe 40thk
supply Allu. Sheet -12"pipe 65 thk
supply Allu. Sheet -12"pipe 90thk
supply Allu. Sheet -12"pipe 115thk
supply Allu. Sheet -14"pipe 40thk
supply Allu. Sheet -14"pipe 65 thk
supply Allu. Sheet -14"pipe 90thk
supply Allu. Sheet -14"pipe 115thk
supply Allu. Sheet -16"pipe 40thk
supply Allu. Sheet -16"pipe 65 thk
supply Allu. Sheet -16"pipe 90thk
supply Allu. Sheet -16"pipe 115thk
supply Allu. Sheet -18"pipe 40thk
supply Allu. Sheet -18"pipe 65 thk
supply Allu. Sheet -18"pipe 90thk
supply Allu. Sheet -18"pipe 115thk
supply Allu. Sheet -20"pipe 40thk
supply Allu. Sheet -20"pipe 65 thk
supply Allu. Sheet -20"pipe 90thk
supply Allu. Sheet -20"pipe 115thk
supply Allu. Sheet -24"pipe 40thk
supply Allu. Sheet -24"pipe 65 thk
supply Allu. Sheet -24"pipe 90thk
supply Allu. Sheet -24"pipe 115thk
supply Allu. Sheet -on Vessel 40thk
supply Allu. Sheet -on "Vessel 65 thk
supply Allu. Sheet -on Vessel 90thk
supply Allu. Sheet -on Vessel 115thk
supply Labour for -1/2"pipe 40 thk
supply Labour for -1/2"pipe 65 thk
supply Labour for -1/2"pipe 90thk
supply Labour for -1/2"pipe 115thk
supply Labour for -3/4"pipe 40 thk
supply Labour for -3/4"pipe 65 thk
supply Labour for -3/4"pipe 90thk
supply Labour for -3/4"pipe 115thk
supply Labour for -1"pipe 40 thk
supply Labour for -1"pipe 65 thk
supply Labour for -1"pipe 90thk
supply Labour for -1"pipe 115thk
supply Labour for -1-1/2"pipe 40 thk
supply Labour for -1-1/2"pipe 65 thk
supply Labour for -1-1/2"pipe 90thk
supply Labour for -1-1/2"pipe 115thk
supply Labour for -2"pipe 40 thk
supply Labour for -2"pipe 65 thk
supply Labour for -2"pipe 90thk
supply Labour for -2"pipe 115thk
supply Labour for -3"pipe 40 thk
supply Labour for -3"pipe 65 thk
supply Labour for -3"pipe 90thk
supply Labour for -3"pipe 115thk
supply Labour for -4"pipe 40 thk
supply Labour for -4"pipe 65 thk
supply Labour for -4"pipe 90thk
supply Labour for -4"pipe 115thk
supply Labour for -6"pipe 40 thk
supply Labour for -6"pipe 65 thk
supply Labour for -6"pipe 90thk
supply Labour for -6"pipe 115thk
supply Labour for -8"pipe 40 thk
supply Labour for -8"pipe 65 thk
supply Labour for -8"pipe 90thk
supply Labour for -8"pipe 115thk
supply Labour for -10"pipe 40 thk
supply Labour for -10"pipe 65 thk
supply Labour for -10"pipe 90thk
supply Labour for -10"pipe 115thk
supply Labour for -12"pipe 40 thk
supply Labour for -12"pipe 65 thk
supply Labour for -12"pipe 90thk
supply Labour for -12"pipe 115thk
supply Labour for -14"pipe 40 thk
supply Labour for -14"pipe 65 thk
supply Labour for -14"pipe 90thk
supply Labour for -14"pipe 115thk
supply Labour for -16"pipe 40 thk
supply Labour for -16"pipe 65 thk
supply Labour for -16"pipe 90thk
supply Labour for -16"pipe 115thk
supply Labour for -18"pipe 40 thk
supply Labour for -18"pipe 65 thk
supply Labour for -18"pipe 90thk
supply Labour for -18"pipe 115thk
supply Labour for -20"pipe 40 thk
supply Labour for -20"pipe 65 thk
supply Labour for -20"pipe 90thk
supply Labour for -20"pipe 115thk
supply Labour for -24"pipe 40 thk
supply Labour for -24"pipe 65 thk
supply Labour for -24"pipe 90thk
supply Labour for -24"pipe 115thk
supply Labour for Vessel 40 thk
supply Labour for "Vessel 65 thk
supply Labour for Vessel 90thk
supply Labour for Vessel 115thk
Supply of manpower Supervisor
Supply of manpower Insulator
Supply of manpower Tinsmith
Supply of manpower Helper
( materail portion) supply of 0.05 mm thk Alluminium foil
( labour portion) Application of 0.05 mm thk Alluminium foil
( material portion ) Spacer ring for insulation size 20x3mm SGP
( labour portion ) Application of Spacer ring for insulation size 20x3mm SGP
( material portion) Fab,Erction, instal Clamps for SGP duct
( labour portion) Fab,Erction, instal Clamps for SGP duct
( materail portion) INSULATION OF PENTHOUSE OF BOILER IN SGP
( Labour portion ) for INSULATION OF PENTHOUSE OF BOILER IN SGP
BALAJI INSULATIONS INDIA PVT LTD
Heat Solutions
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .