| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹48.3 LAccepted-AOC OPPOSITE PAC GATE NO 0 1 KUNERA ETAWAH | ETAWAH | ETAWAH | UTTAR PRADESH | 1 | Accepted-AOC L1 | |
| 2 | 2₹51.5 L+₹3.2 L (6.64%)Rejected-AOC 169 MAUJA ITGAON ETAWAH | 2 | Rejected-AOC L2 | |
| 3 | Not Admitted-Fee/PreQual/Technical 26 KHAJAPUR THAR POTHA KISAN AUTOMOBILE FATEHABAD TIRAHA AASAFABAD FIROZABAD | FIROZABAD | FIROZABAD | UTTAR PRADESH | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹62 L
EMD Value
₹3.1 L
Closing Date
23 Apr 2022, 1:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer
Superintending Engineer, Irrigation Work Circle, Etawah
Construction of C.C.Lining at Badanpur Dy Km 5.700 to 6.300
2022_UPIDC_688256_1
01/S.E./2022-23
Open Tender
Civil Works
Item Rate
60 days
Etawah
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,360
₹3.1 L
2 Jun 2022
18 Apr 2022
23 Apr 2022
18 Apr 2022
23 Apr 2022
18 Apr 2022
90 days
Amount
Earth work in Cutting with all types of ordinary soil including all lead and lift refling of excavated earth into trenches and making bed and side slopes as per drawing and specifition including all lead lift labour and T&P etc.complete in all respects for proper completion of work
Preparation of sub grade for lining work including all cost of material labour T&P taxes etc. required for proper completion of work.
Laying Cement concrete M-10 grade for Foundation inclduing all cost of materials, labour T&P Taxes etc. required for proper completion of work.
Ist class brick work M-100 In 1:4 C.M. with Cement and coarse sand including all cost of labour, materials T&P etc.
Centring and shuttring for C.C. Lining including all cost of labour, Materials T&P Taxes etc. required for proper completion of work.
Laying Cement concrete M-15 grade for sleeper 200X200 mm size inclduing all cost of materials, labour T&P Taxes etc. required for proper completion of work.
Providing and laying 100m thick local sand in filter in bed and slope with cost of materials, labour T&P Taxes etc. required for proper completion of work.
Bitumen painting on Top of sleeper including all cost of labour, material fuel for heating labour and T&P etc.required for proper completion of work.
Providing and laying Ldpe film 200 micron on sub grade before lining per Sqm including all cost of labour, materials T&P taxes etc.for proper completion of work.
Making Construction joint painting with sealing compound including materials, labour T&P Taxes etc. required for proper completion of work.
C.C. Lining . M-15 with cement coarse sand FM not less then 2.0m and hard stone grit 4.75 to 20mm in lining work including all cost of labour, material, taxes T&P etc.required for proper completion of work.
M/s JAL DEVI
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .