MR SE BRIDGE RAIPUR PRAKHAR KUMAR MISHRA(DFLT)
CE(Bridge)
Painting Works of Various Bridge Under PWD Bridge Sub Division Dhamtari for Year 2026-27
200301
NIT NO-21/Bridge/Raipur/2026-27
RESTRICTED TENDER
WORKS
PERCENTAGE
CE(Bridge)
Required Past Technical Experience: AS PER NIT
Required Financial Turnover (in INR): AS PER NIT
Required Bid Capacity (in INR): AS PER NIT
9 documents required · 9 mandatory
Public Works Department (PWD)
WORKS
MR SE BRIDGE RAIPUR PRAKHAR KUMAR MISHRA(DFLT)
RESTRICTED TENDER
PERCENTAGE
A B C D
CE(Bridge)
Bridge Circle, Raipur
Bridge Division Raipur
120
No
1
33.25
20092022
200301
15 Oct, 2026 5:30:00 PM IST
22 Oct, 2026 11:30:00 AM IST
26 Sep, 2026 10:30:00 PM IST
24092026
NIT NO-21/Bridge/Raipur/2026-27
Painting Works of Various Bridge Under PWD Bridge Sub Division Dhamtari for Year 2026-27
12200.00 INR
RTGS/CHALLAN (ONLINE) Internet Banking (ONLINE)
1613600.00
2
21 Oct, 2026 5:30:00 PM IST
1613600
AS PER NIT
AS PER NIT
AS PER NIT
0.00 INR
31032027
18d 23h 42m
0010720220002
9 documents required · 8 mandatory · 1 optional
₹0
₹12,200
26 Sept 2026
26 Sept 2026
22 Oct 2026
26 Sept 2026
21 Oct 2026
PUBLIC WORKS DEPARTMENT
Estimate for Painting Work at Various Bridges at PWD Bridge Sub-Division Dhamtari Under Bridge Division RAIPUR
AMOUNT OF ESTIMATE Rs. :- 19.04 Lacs
P.W.D. BRIDGE CONSTRUCTION, DIVISION - RAIPUR (C.G.)
REPORT AND SPECIFICATION
Name of work :- Estimate for Painting Work at Various Bridges at PWD Bridge Sub-Division Dhamtari Under Bridge Division RAIPUR
T. S. Amount :- 19.04 Lacs.
Authority :- dk;Zikyu vfHk;ark yks-fu-fo- lsrq fuekZ.k laHkkx jk;iqj ¼N-x-½
Budget provision :- Painting work
Necessity :- okf"kZd ejEer dk;Z gsrq yks-fu-fo- lsrq fuekZ.k milaHkkx /kerjh ds varxZr vkus okys jkT; ekxZ ,oa eq[; ftyk ekxksZ esa o`gn iqyksa dk iksrkbZ ,oa jaxjksxu dk;Z dh vko';drk gSA
Provisions :- I. Bridge Proper
1. Painting on kerbs
2. Painting on concrete surface of R.C.C. Railing
3. Painting on concrete surface
4. Providing and applying priming coat on steel work
5. Providing and applying satin/matt finish Enamel paint
Rate :- The estimate cost of this bridge & Road is based on SOR, issued by Engineer-In-Chief P.W.D. Chhattisgarh Raipur w.e.f. 15-06-2026 and for Building work w.e.f. from 10-06-2026 with up to date ammendment.
Specification :- The work shall be executed as per MORT&H specification.
GENERAL ABSTRACT
Estimate for Painting Work at Various Bridges at PWD Bridge Sub-Division Dhamtari Under Bridge Division RAIPUR
PROJECT CIRCLE :- BRIDGE CIRCLE RAIPUR
PROJECT DIVISION :- BRIDGE DIVISION RAIPUR
S.No SUB HEAD AMOUNT REMARKS
1 Painting Work at Various Bridges at PWD Bridge Sub-Division Dhamtari Under Bridge Division RAIPUR Rs. 1613552.00
Total Amount Rs. 1613552.00
Say Amount Rs. 19.04 Lacs 13.19
ABSTRACT OF ESTIMATE
Painting work at various bridges at PWD Bridge Sub Division Dhamtari Under Bridge Division RAIPUR
S.N. Ref. of S.O.R. ITEM Descriptions Quantity Rate Unit Amount
1 4.24 Painting on kerbs in black and yellow alternate bands including cost of material and labour complete as per drawings and specifications as per clause 803. Road Marking Paint 2990 60 RM 179400.00
2 4.26 Painting on concrete surface of R.C.C. Railing (Providing and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 Sq.m.) 7194.58 145.00 sqm 1043214.00
3 4.25 Painting on concrete surfaces with black and yellow alternate bands including cost of material and labour complete as per drawings and specifications as per clause 803. Road marking paint 2329.6 144.00 sqm 335462.00
4 14.74 Building SOR Providing and applying priming coat on steel work with red oxide/ zinc phosphate primer applied @ 0.50 lit /Sqm as per relevant code 3536:1999 ( product such as Asian Zinc phosphate , Dulux Steel primer,Burger Red oxide primer ) with all tools tackles and labour etc. complete for the work. 387.946 30.00 sqm 11638.00
5 14.71 Building SOR Providing and applying satin/ matt finish Enamel paint mimimum 2 coats in all surface applying @ 0.75 lit/ 10 Sqm up to required finish as per relevent I.S. code 2932: 2013 of (Product such as Asian satin Enamel, Dulux Promise Premium Enamel, Nerolac Synthatic Enamel, Opus Prime enamel) inclusive of providing abro tape on edges and article and cleaning of door, windows, floor and surface as required with all tools tackle and labour etc. complete for the work. 387.946 113.00 sqm 43838.00
Total 1613552.00
ESTIMATION OF QUANTITY
Painting work at various bridges at PWD Bridge Sub Division Dhamtari Under Bridge Division RAIPUR
S. NO. Ref. of S.O.R. ITEM Descriptions No. L B H / D Quantity
1 4.24 Painting on kerbs in black and yellow alternate bands including cost of material and labour complete as per drawings and specifications as per clause 803. Road Marking Paint (Asian Paints, Berger, Nerolac)
1 Construction of bridge across Kharun River on Sileghat - Kauhi Road in Km. 1/8 (MINOR) 2 71.00 - - 142 RM
2 Construction of bridge across Mahanadi River on Sarangpuri - bharari in Km. 1/4 2 676.00 - - 1352 RM
3 Construction of bridge across Mahanadi River on Donar - borsi Road in Km. 2/6-8 2 748.00 - - 1496 RM
2 4.26 Painting on concrete surface of R.C.C. Railing (Providing and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 Sq.m.)
1 Construction of bridge across Kharun River on Sileghat - Kauhi Road in Km. 1/8 (MINOR)
2 Construction of bridge across Mahanadi River on Sarangpuri - bharari in Km. 1/4
3 Construction of bridge across Mahanadi River on Donar - borsi Road in Km. 2/6-8
Total 7194.58 sqm
3 4.25 Painting on concrete surfaces with black and yellow alternate bands including cost of material and labour complete as per drawings and specifications as per clause 803. Road marking paint (Asian Paints, Berger, Nerolac)
1 Construction of bridge across Khapri Nalla on Jarwaidih - Khapri - Silidih Road in Km 1/2-4 2 178.00 - 2.8 996.8 sqm
2 Construction of bridge across Kharun River on Semra - Silidih - Kesara Road 2 238.00 - 2.8 1332.8 sqm
Total 2329.6 sqm
4 14.74 Building SOR Providing and applying priming coat on steel work with red oxide/ zinc phosphate primer applied @ 0.50 lit /Sqm as per relevant code 3536:1999 ( product such as Asian Zinc phosphate , Dulux Steel primer,Burger Red oxide primer ) with all tools tackles and labour etc. complete for the work.
1 Construction of bridge across Gadaghat Nalla on Kurud - Megha - Magarlod Road in Km. 7/10
2 Construction of bridge across Kharun River on Sileghat - Kauhi Road in Km. 1/8 (MAJOR)
Total 387.946 sqm
5 14.71 Building SOR Providing and applying satin/ matt finish Enamel paint mimimum 2 coats in all surface applying @ 0.75 lit/ 10 Sqm up to required finish as per relevent I.S. code 2932: 2013 of (Product such as Asian satin Enamel, Dulux Promise Premium Enamel, Nerolac Synthatic Enamel, Opus Prime enamel) inclusive of providing abro tape on edges and article and cleaning of door, windows, floor and surface as required with all tools tackle and labour etc. complete for the work.
1 Construction of bridge across Gadaghat Nalla on Kurud - Megha - Magarlod Road in Km. 7/10
2 Construction of bridge across Kharun River on Sileghat - Kauhi Road in Km. 1/8 (MAJOR)
Total 387.946 sqm
Painting work at various bridges at PWD Bridge Sub Division Dhamtari Under Bridge Division RAIPUR
S.O.R. Road works w.e.f. 15.06.2026 P.A.C. = RS. 16.136 Lacs
S.N. Ref. of S.O.R. ITEM Descriptions Quantity Unit
1 4.24 Painting on kerbs in black and yellow alternate bands including cost of material and labour complete as per drawings and specifications as per clause 803. Road Marking Paint 2990 RM
2 4.26 Painting on concrete surface of R.C.C. Railing (Providing and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 Sq.m.) 7194.58 sqm
3 4.25 Painting on concrete surfaces with black and yellow alternate bands including cost of material and labour complete as per drawings and specifications as per clause 803. Road marking paint 2329.6 sqm
4 14.74 Building SOR Providing and applying priming coat on steel work with red oxide/ zinc phosphate primer applied @ 0.50 lit /Sqm as per relevant code 3536:1999 ( product such as Asian Zinc phosphate , Dulux Steel primer,Burger Red oxide primer ) with all tools tackles and labour etc. complete for the work. 387.946 sqm
5 14.71 Building SOR Providing and applying satin/ matt finish Enamel paint mimimum 2 coats in all surface applying @ 0.75 lit/ 10 Sqm up to required finish as per relevent I.S. code 2932: 2013 of (Product such as Asian satin Enamel, Dulux Promise Premium Enamel, Nerolac Synthatic Enamel, Opus Prime enamel) inclusive of providing abro tape on edges and article and cleaning of door, windows, floor and surface as required with all tools tackle and labour etc. complete for the work. 387.946 sqm
INPUT SHEET (RAILING)
Name of Work : Painting work at various bridges at PWD Bridge Sub Division Dhamtari Under Bridge Division RAIPUR
Name of Bridges 1 Construction of bridge across Mahanadi River on Dhamtari - Sihawa Road in Km. 5/4
2 Construction of bridge across Nari Nalla on Nawapara - Kurud Road in Km. 13/10
3 Construction of bridge across Kharun River on Sileghat - Kauhi Road in Km. 1/8 (MINOR)
4 Construction of bridge across Koliyari Nalla on Bhatagaon-Koliyari-Bhakhara Road in Km. 8/2
5 Construction of bridge across Nagdeo Nalla on Kamroud - Bhothidih Road in Km. 1/6
6 Construction of bridge across Mahanadi River on Sarangpuri - bharari in Km. 1/4
7 Construction of bridge across Sondoor River Bridge on Dudhawa - Nagri - Basin in Km. 83/8
8 Construction of bridge across Deur Nalla on Dudhawa-Nagri-Basin in Km. 91/6
9 Construction of bridge across Biji Nalla on Dudhawa - Nagri - Basin in Km. 89/6
10 Construction of bridge across Mahanadi River on Donar - borsi Road in Km. 2/6-8
11 Construction of bridge across Aama Nalla on Gattasilli-Birgudi Road in Km. 15/6
LENGTH OF BRIDGE : 3093.00
Type of Paint Structure : Railing
No. of Post of Railing @ 2 mc/c per side : 1548
Height of post of RCC Railing : 1.1
Length of Rail in RCC Railing : 1.8
Number of Rail in RCC Railing 2
INPUT SHEET (CRASH BARRIER)
Name of Work : Painting work at various bridges at PWD Bridge Sub Division Dhamtari Under Bridge Division RAIPUR
Name of Bridges 1 Construction of bridge across Kharun River on Siluti - Charbhata - Surpa -Temri in Km. 2/6
2 Construction of bridge across Khapri Nalla on Khapri - Jarwaidih -Bhaisbod Road in Km. 2/8-10
3 Construction of bridge across Parewadih Nalla on Bhendri - Parewadih - Khishora in Km 3/10
4 Construction of bridge across Khapri Nalla on Jarwaidih - Khapri - Silidih Road in Km 1/2-4
5 Construction of bridge across Kharun River on Semra - Silidih - Kesara Road
LENGTH OF RAILING : 845.00
Type of Paint Structure : Crash Barrier
Height of Crash Barrier : 1.1
Estimate for Painting Work of Various Bridges at PWD Bridge Sub-Division Dhamtari Under Bridge Division Raipur
S.NO. Name of Bridges Type of Railing LENGTH OF BRIDGE
1 Construction of bridge across Kharun River on Siluti - Charbhata - Surpa -Temri in Km. 2/6 CRASH BARRIER 193.00
2 Construction of bridge across Khapri Nalla on Khapri - Jarwaidih -Bhaisbod Road in Km. 2/8-10 CRASH BARRIER 148.00
3 Construction of bridge across Parewadih Nalla on Bhendri - Parewadih - Khishora in Km 3/10 CRASH BARRIER 88.00
4 Construction of bridge across Khapri Nalla on Jarwaidih - Khapri - Silidih Road in Km 1/2-4 CRASH BARRIER 178.00
5 Construction of bridge across Kharun River on Semra - Silidih - Kesara Road CRASH BARRIER 238.00
1 Construction of bridge across Mahanadi River on Dhamtari - Sihawa Road in Km. 5/4 RCC RAILING 696.00
2 Construction of bridge across Nari Nalla on Nawapara - Kurud Road in Km. 13/10 RCC RAILING 88.00
3 Construction of bridge across Kharun River on Sileghat - Kauhi Road in Km. 1/8 (MINOR) RCC RAILING 71.00
4 Construction of bridge across Koliyari Nalla on Bhatagaon-Koliyari-Bhakhara Road in Km. 8/2 RCC RAILING 73.00
5 Construction of bridge across Nagdeo Nalla on Kamroud - Bhothidih Road in Km. 1/6 RCC RAILING 148.00
6 Construction of bridge across Mahanadi River on Sarangpuri - bharari in Km. 1/4 RCC RAILING 676.00
7 Construction of bridge across Sondoor River Bridge on Dudhawa - Nagri - Basin in Km. 83/8 RCC RAILING 213.00
8 Construction of bridge across Deur Nalla on Dudhawa-Nagri-Basin in Km. 91/6 RCC RAILING 163.00
9 Construction of bridge across Biji Nalla on Dudhawa - Nagri - Basin in Km. 89/6 RCC RAILING 88.00
10 Construction of bridge across Mahanadi River on Donar - borsi Road in Km. 2/6-8 RCC RAILING 748.00
11 Construction of bridge across Aama Nalla on Gattasilli-Birgudi Road in Km. 15/6 RCC RAILING 129.00
TOTAL:- 3093.00
1 Construction of bridge across Gadaghat Nalla on Kurud - Megha - Magarlod Road in Km. 7/10 PIPE RAILING 200.00
2 Construction of bridge across Kharun River on Sileghat - Kauhi Road in Km. 1/8 (MAJOR) PIPE RAILING 163.00
3 Construction of bridge across Kharun River on Kopedih - Tipani- Nipani Road in Km. 3/8 PIPE RAILING 147.00
INPUT SHEET (PIPE RAILING)
Name of Work : Painting work at various bridges at PWD Bridge Sub Division Dhamtari Under Bridge Division RAIPUR
Name of Bridges 1 Construction of bridge across Gadaghat Nalla on Kurud - Megha - Magarlod Road in Km. 7/10
2 Construction of bridge across Kharun River on Sileghat - Kauhi Road in Km. 1/8 (MAJOR)
3 Construction of bridge across Kharun River on Kopedih - Tipani- Nipani Road in Km. 3/8
LENGTH OF RAILING : 510.00
Type of Paint Structure : pipe railing
Number of post in collapsible pipe Railing @ 2 mc/c per side : 256
S.No. Item no. Description unit rate Type of Railing
1 4.24 Painting on kerbs in black and yellow alternate bands including cost of material and labour complete as per drawings and specifications as per clause 803. Road Marking Paint (Asian Paints, Berger, Nerolac) RM 70 railing
2 4.26 Painting on concrete surface of R.C.C. Railing (Providing and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 Sq.m.) sqm 170 railing
3 4.25 Painting on concrete surfaces with black and yellow alternate bands including cost of material and labour complete as per drawings and specifications as per clause 803. Road marking paint (Asian Paints, Berger, Nerolac) sqm 169 crash barrier
4 14.74 Building SOR Providing and applying priming coat on steel work with red oxide/ zinc phosphate primer applied @ 0.50 lit /Sqm as per relevant code 3536:1999 ( product such as Asian Zinc phosphate , Dulux Steel primer,Burger Red oxide primer ) with all tools tackles and labour etc. complete for the work. sqm 35 pipe railing
5 14.71 Building SOR Providing and applying satin/ matt finish Enamel paint mimimum 2 coats in all surface applying @ 0.75 lit/ 10 Sqm up to required finish as per relevent I.S. code 2932: 2013 of (Product such as Asian satin Enamel, Dulux Promise Premium Enamel, Nerolac Synthatic Enamel, Opus Prime enamel) inclusive of providing abro tape on edges and article and cleaning of door, windows, floor and surface as required with all tools tackle and labour etc. complete for the work. sqm 133 pipe railing
S.No. Name of Bridge Type of Bridge Type of Railing Bridge Length Approach total length
1 1 Construction of bridge across Mahanadi River on Dhamtari - Sihawa Road in Km. 5/4 RAILING 682.75 13 696
2 2 Construction of bridge across Gadaghat Nalla on Kurud - Megha - Magarlod Road in Km. 7/10 PIPE 186.30 13 200
5 3 Construction of bridge across Nari Nalla on Nawapara - Kurud Road in Km. 13/10 RAILING 75 13 88
8 4 Construction of bridge across Kharun River on Sileghat - Kauhi Road in Km. 1/8 (MAJOR) PIPE 150 13 163
5 Construction of bridge across Kharun River on Sileghat - Kauhi Road in Km. 1/8 (MINOR) RAILING 57.2 13 71
9 6 Construction of bridge across Kharun River on Kopedih - Tipani- Nipani Road in Km. 3/8 PIPE 133.94 13 147
10 7 Construction of bridge across Koliyari Nalla on Bhatagaon-Koliyari-Bhakhara Road in Km. 8/2 RAILING 60 13 73
12 8 Construction of bridge across Nagdeo Nalla on Kamroud - Bhothidih Road in Km. 1/6 RAILING 134.09 13 148
13 9 Construction of bridge across Sita River on Belargaon-Ghudawad in Km. 3/6 CB 88.5 13 102
14 10 Construction of bridge across Mahanadi River on Sarangpuri - bharari in Km. 1/4 RAILING 662.995 13 676
15 11 Construction of bridge across Sondoor River Bridge on Dudhawa - Nagri - Basin in Km. 83/8 RAILING 200 13 213
16 12 Construction of bridge across Deur Nalla on Dudhawa-Nagri-Basin in Km. 91/6 RAILING 150 13 163
17 13 Construction of bridge across Biji Nalla on Dudhawa - Nagri - Basin in Km. 89/6 RAILING 75 13 88
18 14 Construction of bridge across Kharun River on Siluti - Charbhata - Surpa -Temri in Km. 2/6 CB 180 13 193
19 15 Construction of bridge across Mahanadi River on Birgudi - Bhumka -Belargaon in Km. 3/8 RAILING 1600 13 1613
20 16 Construction of bridge across Mahanadi River on Donar - borsi Road in Km. 2/6-8 RAILING 735 13 748
21 17 Construction of bridge across Khapri Nalla on Khapri - Jarwaidih -Bhaisbod Road in Km. 2/8-10 CB 135 13 148
22 18 Construction of bridge across Nagdeo Nalla on Hardi-Kundel Road in Km. 3/10 RAILING 75 13 88
23 19 Construction of bridge across Aama Nalla on Gattasilli-Birgudi Road in Km. 15/6 RAILING 116 13 129
24 20 Construction of bridge across Belargaon Nalla on Jaipuri - Belargaon Road CB 35.06 13 49
25 21 Construction of bridge across Jaitpuri Nalla on Birgudi - Belargaon - Jaitpuri Road CB 90 13 103
26 22 Construction of bridge across Ghordagi Nalla on Bazar Kurridih - Pirperchhedi Road RAILING 105 13 118
27 23 Construction of bridge across Aama Nalla on Bagroom Nalla - Hitali in K.M 1/10 CB 225 13 238
28 24 Construction of bridge across Mandraud Nalla on Uamarda - Shidhori in K.M 33/6 CB 100 13 113
29 25 Construction of bridge across Sivanikalla Nalla on Kurad - Charmudiya in K.M 4/6 RAILING 75 13 88
30 26 Construction of bridge across Bagbuda Nalla on Bhendri - Parewadih in K.m. 1/2 RAILING 180 13 193
31 27 Construction of bridge across Sirve Nalla on Kalle - Awari in K.m.7/10 CB 165 13 178
32 28 Construction of bridge across Sarar Nalla on Darra - Patewa Road CB 135 13 148
33 29 Construction of bridge across Kharun River on Semra - Kauhi Road CB 250 13 263
34 30 Construction of bridge across Kuriya nalla on Rampur - Hanchalper Road CB 120 13 133
35 31 Construction of bridge across Sendur River on Bagroom Nalla - Barkonha Road CB 165 13 178
37 32 Construction of bridge across Parewadih Nalla on Bhendri - Parewadih - Khishora in Km 3/10 CB 75 13 88
39 33 Construction of bridge across Kuriya Nalla on Korra -Gatapar Road in Km 1/4 CB 90 13 103
40 34 Construction of bridge across Kuriya Nalla on Kurmatari - Bhendra - korra Road in Km 9/8 CB 120 13 133
41 35 Construction of bridge across Khapri Nalla on Jarwaidih - Khapri - Silidih Road in Km 1/2-4 CB 165 13 178
42 36 Construction of bridge across Kharun River on Semra - Silidih - Kesara Road CB 225 13 238
S.No. Name of Bridge Type of Railing Bridge Length Approach total length
1 Construction of bridge across Sita River on Belargaon-Ghudawad in Km. 3/6 CRASH BARRIER 88.5 13 102
2 Construction of bridge across Kharun River on Siluti - Charbhata - Surpa -Temri in Km. 2/6 CRASH BARRIER 180 13 193
3 Construction of bridge across Khapri Nalla on Khapri - Jarwaidih -Bhaisbod Road in Km. 2/8-10 CRASH BARRIER 135 13 148
4 Construction of bridge across Belargaon Nalla on Jaipuri - Belargaon Road CRASH BARRIER 35.06 13 49
5 Construction of bridge across Jaitpuri Nalla on Birgudi - Belargaon - Jaitpuri Road CRASH BARRIER 90 13 103
6 Construction of bridge across Aama Nalla on Bagroom Nalla - Hitali in K.M 1/10 CRASH BARRIER 225 13 238
7 Construction of bridge across Mandraud Nalla on Uamarda - Shidhori in K.M 33/6 CRASH BARRIER 100 13 113
8 Construction of bridge across Sirve Nalla on Kalle - Awari in K.m.7/10 CRASH BARRIER 165 13 178
9 Construction of bridge across Sarar Nalla on Darra - Patewa Road CRASH BARRIER 135 13 148
10 Construction of bridge across Kharun River on Semra - Kauhi Road CRASH BARRIER 250 13 263
11 Construction of bridge across Kuriya nalla on Rampur - Hanchalper Road CRASH BARRIER 120 13 133
12 Construction of bridge across Sendur River on Bagroom Nalla - Barkonha Road CRASH BARRIER 165 13 178
13 Construction of bridge across Parewadih Nalla on Bhendri - Parewadih - Khishora in Km 3/10 CRASH BARRIER 75 13 88
14 Construction of bridge across Kuriya Nalla on Korra -Gatapar Road in Km 1/4 CRASH BARRIER 90 13 103
15 Construction of bridge across Kuriya Nalla on Kurmatari - Bhendra - korra Road in Km 9/8 CRASH BARRIER 120 13 133
16 Construction of bridge across Khapri Nalla on Jarwaidih - Khapri - Silidih Road in Km 1/2-4 CRASH BARRIER 165 13 178
17 Construction of bridge across Kharun River on Semra - Silidih - Kesara Road CRASH BARRIER 225 13 238
18 Construction of bridge across Mahanadi River on Dhamtari - Sihawa Road in Km. 5/4 RCC RAILING 682.75 13 696
19 Construction of bridge across Nari Nalla on Nawapara - Kurud Road in Km. 13/10 RCC RAILING 75 13 88
20 Construction of bridge across Kharun River on Sileghat - Kauhi Road in Km. 1/8 (MINOR) RCC RAILING 57.2 13 71
21 Construction of bridge across Koliyari Nalla on Bhatagaon-Koliyari-Bhakhara Road in Km. 8/2 RCC RAILING 60 13 73
22 Construction of bridge across Nagdeo Nalla on Kamroud - Bhothidih Road in Km. 1/6 RCC RAILING 134.09 13 148
23 Construction of bridge across Mahanadi River on Sarangpuri - bharari in Km. 1/4 RCC RAILING 662.995 13 676
24 Construction of bridge across Sondoor River Bridge on Dudhawa - Nagri - Basin in Km. 83/8 RCC RAILING 200 13 213
25 Construction of bridge across Deur Nalla on Dudhawa-Nagri-Basin in Km. 91/6 RCC RAILING 150 13 163
26 Construction of bridge across Biji Nalla on Dudhawa - Nagri - Basin in Km. 89/6 RCC RAILING 75 13 88
27 Construction of bridge across Mahanadi River on Birgudi - Bhumka -Belargaon in Km. 3/8 RCC RAILING 1600 13 1613
28 Construction of bridge across Mahanadi River on Donar - borsi Road in Km. 2/6-8 RCC RAILING 735 13 748
29 Construction of bridge across Nagdeo Nalla on Hardi-Kundel Road in Km. 3/10 RCC RAILING 75 13 88
30 Construction of bridge across Aama Nalla on Gattasilli-Birgudi Road in Km. 15/6 RCC RAILING 116 13 129
31 Construction of bridge across Ghordagi Nalla on Bazar Kurridih - Pirperchhedi Road RCC RAILING 105 13 118
32 Construction of bridge across Sivanikalla Nalla on Kurad - Charmudiya in K.M 4/6 RCC RAILING 75 13 88
33 Construction of bridge across Bagbuda Nalla on Bhendri - Parewadih in K.m. 1/2 RCC RAILING 180 13 193
34 Construction of bridge across Gadaghat Nalla on Kurud - Megha - Magarlod Road in Km. 7/10 PIPE RAILING 186.3 13 200
35 Construction of bridge across Kharun River on Sileghat - Kauhi Road in Km. 1/8 (MAJOR) PIPE RAILING 150 13 163
36 Construction of bridge across Kharun River on Kopedih - Tipani- Nipani Road in Km. 3/8 PIPE RAILING 133.94 13 147
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 1.12 MB
947891851723121709_25412_Guidelines_to_Bidders_EPS_v1.pdf
NIT • 0.13 MB
8969922558995719278_200301_e-procurement formet.doc
NIT • 0.07 MB
1446489766480006316_200301_FORM A.doc
NIT • 0.16 MB
2908320040784378122_200301_NIT 2.doc
NIT • 0.34 MB
4958480976814817655_200301_painting dhamtari 2026 19.xlsx
BOQ • 0.08 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .