| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.1 LAccepted-AOC | L1 | Accepted-AOC Lowest | |
| 2 | L2₹17.9 L+₹2.1 L (13.5%)Rejected-Finance | L2 | Rejected-Finance Not Lowest | |
| 3 | L3₹21.3 L+₹5.5 L (34.9%)Rejected-Finance | L3 | Rejected-Finance Not Lowest | |
| 4 | L4₹22.8 L+₹7.0 L (44.3%)Rejected-Finance | L4 | Rejected-Finance Not Lowest |
Tender Value
₹20 L
EMD Value
₹40,000
Closing Date
24 Apr 2021, 6:00 pmClosed
Garrison Engineer Nasik Road
Garrison Engineer Nasik Road AOP Complex Near AOP Gate PO Gandhinagar Nasik 422006
As per Tender Documents
2021_MES_424881_2
GE/NRC/8806/E8
Open Tender
Civil Works
Item Rate
270 days
Garrison Engineer Nasik Road
As per NIT
8 documents required · 8 mandatory
₹500
Garrison Engineer Nasik Road
₹40,000
Yes
15 Jul 2021
27 Mar 2021
27 Apr 2021
27 Mar 2021
24 Apr 2021
10 Apr 2021
Amount
M&L for taking up vertical turbine pump 175 HP multi stage oil lubricated type B-350-9-200 from jack well 200 mm dia bore after disconnection of electrical connection earthing lines and transportation to local workshop for repairs / overhaulling of pump including dismantling the assembly , cleaning all parts of pump assembly thoroughly and finding out the defects segregating the serviceable spare parts for reuse and including machine work, reassembling the pump set after successful repair and lowering to the existing position and refixing and testing complete all as specified and directed. (Note:- Spares as required shall be measure & paid seperately against the relevant items).
supply & fix Impeller Holding Split ring -CI -
supply & fix Bowl bearing-Bronze
supply & fix Top Bowl bearing-Bronze
supply & fix Lantern ring
supply & fix Impeller shaft packing ring-Bronze
supply & fix Discharge case bearing-Bronze
supply & fix Impeller shaft coupling-AISI410
supply & fix Line shaft bearing Bronze
supply & fix Glide spider-CI
supply & fix Rubber guide ring-STD
supply & fix Rubber guide ring Circlip-STD
supply & fix Gland packing-STD
supply & fix Gland packing ring-Aluminium
supply & fix Impeller with seal ring Bronze
supply & fix motor rachet
M&L for taking up submersible pump 20 HP multi stage Model No B 93/1 from well after disconnection of electrical connection and transportation to local workshop for repairs / overhaulling of pump including dismantling the assembly , cleaning all parts of pump assembly thoroughly and finding out the defects segregating the serviceable spare parts for reuse and including machine work, reassembling the pump set after successful repair and refixing to the existing position and testing complete all as specified and directed. (Note:- Spares as required shall be measure & paid seperately against the relevant items).
supply & fix Spacer Sleeve
supply & fix Top Sleeve
supply & fix Lock Washer
supply & fix Thrust Washer
supply & fix Bearing Sleeve for Bowl
supply & fix Bearing Bush G.M. for Bowl
supply & fix Neck Ring (Wear Ring)
supply & fix Oil Seal
supply & fix Bearing Bush GM for I.P.
Taking out of centrifugal pump set from pump foundation after disconnection from motor and transportation to workshop , dismantling the pump for repair/ overhauling incluiding cleaning of all parts of pump assembly throughly, including machine work of pump shaft inorder to obtain smooth finish including necessary polishing etc and installing back including helium gasket sheet not less then 1mm thick & to the entire satisfaction of engr-in -charge all as specified and directed. Make -Kirloskar, DSM 125X40 (Note:- Spares as required shall be measure & paid seperately against the relevant items).
supply & fix Casing Wear Ring-
supply & fix shaft sleeve-
supply & fix Inter Stage Ring-
supply & fix Ball bearing SKF - 7309
supply & fix Ball bearing SKF - 6309
supply & fix Bearing cartridge DE
supply & fix Bearing cartridge NDE
supply & fix shaft sleeve Nuts
supply & fix Split Gland
Taking out of centrifugal pump set from pump foundation after disconnection from motor and transportation to workshop , dismantling the pump for repair/ overhauling incluiding cleaning of all parts of pump assembly throughly, including machine work of pump shaft inorder to obtain smooth finish including necessary polishing etc and installing back including helium gasket sheet not less then 1mm thick & to the entire satisfaction of engr-in -charge all as specified and directed. (Note:- Spares as required shall be measure & paid seperately against the relevant items).
supply & fix Casing Wear Ring-
supply & fix shaft sleeve-
supply & fix Inter Stage Ring-
supply & fix Ball bearing SKF - 7309
supply & fix Ball bearing SKF - 6309
supply & fix Bearing cartridge DE
supply & fix Bearing cartridge NDE
supply & fix shaft sleeve Nuts
supply & fix Split Gland
Disconnecting non clogging pumps of 7.5 HP Capacity from the motor for complete over hauling of the pump necessary greasing replacing asbestors rope of the glands, grinding of shaft including necessary mechine work, assembling,including helium gasket sheet not less then 1mm thick & testing in commissoning all as specified asd directed. (Note:- Spares as required shall be measure & paid seperately against the relevant items).
Impeller key -1 Nos
Gland Bush Split type
Impeller Nut -1 Nos
Supply & fix Ball bearing SKF -
supply & fix shaft sleeve gun metal
Disconnecting non clogging pumps of 5 HP Capacity from the motor for complete over hauling of the pump necessary greasing replacing asbestors rope of the glands, grinding of shaft including necessary mechine work, assembling,including helium gasket sheet not less then 1mm thick & testing in commissoning all as specified asd directed. (Note:- Spares as required shall be measure & paid seperately against the relevant items).
Impeller key -1 Nos
Gland Bush Split type
Impeller Nut -1 Nos
Supply & fix Ball bearing SKF
supply & fix shaft sleeve gun metal
Taking up Submersible Pump assembly including column pipe approx 50 to70 mtrs using chain pulley block manually and carrying out following phase of work all as directed for 5HP/3 HP Pump Set .(i) Transportation of submersible pump -motor assembly for necessary repair. (ii) Carrying out overhauling of motor assembly 3phase ,taking out burnt winding wire,rewinding using super enamelled copper winding wire of appropriate gauge and turn,providing insulation materials and replacement of bearing and assembling with repaired/serviceable pump and testing complete all as directed by Eng-in Charge. (iii) Carrying out dismantling and overhauling of multi stage pump, incl cleaning and derusting of casing, replacement of worm out spare like bearings, impellar bushing, coupling etc & refixing of existing serviceable components after proper cleaning, machining all as required & assembling testing at workshop complete for 5 HP submersible pump of any make including carrying out painting by two coat of synthetic enamelled paint over a coat of primer,assembling the pump and motor including testing complete.(note- Rewinding / re-insulation of winding will be measure & paid seperately under relavant item of sch.)
Impeller key
Lantern ring
mpeller shaft ring
Supply & fix thrust Ball bearing SKF -
Water Seal
Motor pump couple bush with key
Impeller
Disconnecting electrically and disengaging the AC Squirrel cage induction motor 3 phase 415 Vlots, 50 Cycles, and taking out to local workshop induction motor 175 HP/180 HP for repair purpose including complete cleaning,varnishing ,reinsulation and replacement of DE /NDE bearings and greasing and including shifitng back to location as directed, installing, testing and commissioning after repair complete all as specified and directed. (note- Rewinding will be measure & paid seperately under relavant item of sch.)
Disconnecting electrically and disengaging the AC Squirrel cage induction motor 3 phase 415 Vlots, 50 Cycles,and taking out to local workshop submersible induction motor 20 HP for repair purpose including complete cleaning,varnishing ,insulation, replacement of DE /NDE bearings and greasing and including shifitng back to location as directed, installing, testing and commissioning after repair complete all as specified and directed. (note- Rewinding will be measure & paid seperately under relavant item of sch.)
Disconnecting electrically and disengaging the AC Squirrel cage induction motor 3 phase 415 Vlots, 50 Cycles, and taking out to local workshop induction motor 150/125/110/100 HP for repair purpose including complete cleaning,varnishing ,insulation replacement of DE /NDE bearings and greasing and including shifting back to location as directed, installing, testing and commissioning after repair complete all as specified and directed.(note- Rewinding will be measure & paid seperately under relavant item of sch.)
Disconnecting electrically and disengaging the AC Squirrel cage induction motor 3 phase 415 Vlots, 50 Cycles, and taking out to local workshop induction motor 15/10 HP/7.5 HP/5 HP 1440 RPM for repair purpose including complete cleaning,varnishing ,insulation replacement of DE /NDE bearings and greasing and including shifitng back to location as directed, installing, testing and commissioning after repair complete all as specified and directed. (note- Rewinding will be measure & paid seperately under relavant item of sch.)
Disconnecting electrically and disengaging the AC Squirrel cage induction motor 3 phase 415 Vlots, 50 Cycles, and taking out to local workshop induction motor 3HP/1 HP 1440 RPM for repair purpose including complete cleaning,varnishing ,insulation replacement of DE /NDE bearings and greasing and including shifitng back to location as directed, installing, testing and commissioning after repair complete all as specified and directed. (note- Rewinding will be measure & paid seperately under relavant item of sch.)
Disconnecting electrically and disengaging the AC Squirrel cage induction motor 3 phase 415 Vlots, 50 Cycles, 5 HP, 900 RPM capacity motors from respective non clogging centrifugal pumps/open well submersible pumps, other rotating mechanism etc, removing from foundations, dismantling rotor and stator, bearings, cleaning the dust/dirt, overhauling thoroughly including complete varnishing and reinsulation replacement of DE /NDE bearings ,greasing, reassembling the motor, mounting on the foundations, coupling with non clogging centrifugal pumps/respective mechanism, making the electrical connections, testing and commissioning all as directed. (note- Rewinding will be measure & paid seperately under relavant item of sch.)
Material & labour for Rewinding the motor with super enamelled copper winding wire with appropriate same gauge of exsisting coil with similar class of exsisting insulation as recommended by manufacturer with high quality normex insulating paper applying best quality insulating varnish on stator/rotor windings drying them completely, testing the insulations as directed by engr -in - charge
Taking down unsv existing indicating lamp and Supply & fix indicating lamp led type.
Taking down unsv existing pressure Gauge and Supply & fix pressure Gauge dial type 0 to 20 kg/cm squre with pipe and fittings as per direction of Engg-In-Charge.
Taking down unsv existing pressure Gauge and Supply & fix pressure Gauge dial type 0 to 100 kg/cm squre with pipe and fittings as per direction of Engg-In-Charge.
Supply & fix Fully Automatic Star Delta Motor starter 12.5 HP in sheet-steel enclosure type MK-1S (Motor Rating AC-3 Duty, 415V, 50Hz, 3-Ph) and Relay Range 9-14 and taking down.
Supply & fix DOL Motor starter 7.5 HP in sheet-steel enclosure type MK-1 (Motor Rating AC-3 Duty, 415V, 50Hz, 3-Ph) and Relay Range 9-14 and taking down.
Disconnecting DV 40 vaccum pump 7.5 HP Capacity make: Kirloskar from the motor for complete over hauling of the pump necessary greasing replacing asbestors rope of the glands, grinding of shaft including necessary mechine work, assembling,including helium gasket sheet not less then 1mm thick & testing in commissoning all as specified asd directed. (Note:- Spares make Kirloskar as required shall be measure & paid seperately against the relevant items).
Impeller part No 153
Gland Bush Part No 223
Wearing Plate Part No 460 & 460.1
Ball Bearing Part No 260 & 260.1
Stuffing box cover part No 238
Shaft Sleeve DE & NDE
Shaft part No 180
Supply Only Semiconductor fuse 300 A
Excavation in trenches not exc 1.5 mtr wide and not exc 1.5 mtr deep and getting out in soft/ loose soil all as specified and directed
Returining, filling in including spreading, levelling watering and well ramming in layer not exce 25 cm, all as specified and directed
Removing excavated soil to a distance not exce 50 mtr and deposited where directed at a level not exceding 1.5 mtr abvoe the starting point all as specified and directed.
Cutting existing cast iron pipe in position for insertion of new pipe/tees, branches etc.300 mm dia
Taking up cast iron water mains incuding flanged rubber joints with spigot and socket ends and lead joint burning out and recovering lead of size 300 mm dia
Supply and laying Ductile iron pipes k-9 (tyton joint ) with spigot and socket ends centrifugally cast in any length laid in trenches of size 300 mm dia
M&L for run lead joints complete for water mains with spigot & socket pipes and fittings, all as specified and directed. Bore of pipe 300 mm dia
Supply and laid spigot and socketed CI fittings. Such as bends (any type radius and angle), tapers, tees, collars & tail piece socket/flanged/spigot etc of size 200mm to 300mm dia.
Dismantling/Removing of Air compressor after disconnecting all electrical connetion and removing nuts & bolts etc,from foundation. Dismantling the compressor head. Removing all defective parts as appended below, taking of compressor head, reassembling the compressor head after replacement of head gasket and other defective parts, as required including cleaning, servicing and overhauling the compressor. Reinstallation, commissioning and testing complete and replacement of compressor oil, all as specfied and directed. Make ELGI Capacity 10 Kg/Cm2.
Piston Ring - 04 Nos
Bush Bearing - 02 Nos
Connecting rod bush - 02 Nos
Piston Pin - 02 Nos
Scrapper Oil Ring - 04 Nos
Piston - 02 Nos
Safety Valve - 01 Nos
Piston Pin bush - 02 Nos
Fan belt - 02 Nos
Supply and fix in repair MCCBs of following type and capacity as directed by Engg-In-Charge.630 Amps 4 pole 50 KA,Frame size -SKB-3 adjustable thermal setting 70-100% Model NO -ISLCNF630
All as per item no. 400 Amps 4 pole 50 KA, Conforms to IS/IEC 60947 -2 model DU400N Cat No CM 98404OORO.
All as per item no. 250 Amps 4 pole 50 KA, Conforms to IS/IEC 60947 -2 model DU 250 Cat No CM 98404OOQO.
Disconnecting non clogging pumps type SP4LA of 10 HP Capacity from the motor for complete over hauling of the pump necessary greasing replacing asbestors rope of the glands, grinding of shaft including necessary mechine work, assembling,including helium gasket sheet not less then 1mm thick & testing in commissoning all as specified asd directed. (Note:- Spares Make Kirloskar as required shall be measured & paid seperately against the relevant items).
Supply only Bearing Housing
Supply only DE bearing cover
Supply only Impeller
Supply only Impeller Nut
Supply only Shaft
Supply only Rubber Flap assy
Supply only Shaft Sleeve
Supply only Wearing plate DE
Supply only Wearing plate NDE
Supply & fix rubber tyton joint of following size 300 mm dia
NOTE :- AMOUNT OF SCHEDULE OF CREDIT RS. 67,433.00 WILL BE DEDUCTED FROM TOTAL AMOUNT OF BOQ.
M/s Anil Builders
SHILPVED
M/S MK Nair
Bidder Name
UNITED ENTERPRISES
M/S MK Nair
M/s Anil Builders
SHILPVED
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .