Tender Value
₹1.3 Cr
EMD Value
₹2.6 L
Closing Date
23 Oct 2026, 3:00 pm
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
Above/Below/Par
GATISHAKTI
14 conditions · 2 needing a document upload
The tenderer must have minimum average annual contractual turnover of V/N or V which ever is less; where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
The tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: (i)Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or (ii)Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, or (iii)One similar work costing not less than the amount equal to 60% of advertised value of the tender. (b) (1)In case of tenders for composite works (e.g. works involving more than one distinct component, such as Civil Engineering works, S&T works, Electrical works, OHE works etc. and in the case of major bridges - substructure, superstructure etc.), tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: (i)Three similar works each costing not less than the amount equal to 30% of advertised value of each component of tender, or (ii)Two similar works each costing not less than the amount equal to 40% of advertised value of each component of tender, or (iii)One similar work each costing not less than the amount equal to 60% of advertised value of each component of tender. Note for b (1): Separate completed works of minimum required values shall also be considered for fulfillment of technical eligibility criteria for different components. (b)(2) In such cases, what constitutes a component in a composite work shall be clearly pre-defined with estimated tender cost of it, as part of the tender documents without any ambiguity. (b) (3) To evaluate the technical eligibility of tenderer, only components of work as stipulated in tender documents for evaluation of technical eligibility, shall be considered. The scope of work covered in other remaining components shall be either executed by tenderer himself if he has work experience as mentioned in clause 7 of the Standard General Conditions of Contractor through subcontractor fulfilling the requirements as per clause 7 of the Standard General Conditions of Contract or jointly i.e., partly himself and remaining through subcontractor, with prior approval of Chief Engineer in writing. However, if required in tender documents by way of Special Conditions, a formal agreement duly notarized, legally enforceable in the court of law, shall be executed by the main contractor with the subcontractor for the component(s) of work proposed to be executed by the subcontractor(s), and shall be submitted along with the offer for considering subletting of that scope of work towards fulfilment of technical eligibility. Such subcontractor must fulfill technical eligibility criteria as follows: The subcontractor shall have successfully completed at least one work similar to work proposed for subcontract, costing not less than 35% value of work to be subletted, in last 5 years, ending last day of month previous to the one in which tender is invited through a works contract. Note: for subletting of work costing up to Rs 50 lakh, no previous work experience of subcontractor shall be asked for by the Railway.
Defination of Similar Work :- Design Engineering Consultancy services of Road Over Bridges / Flyovers / Viaducts.
8 conditions
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Work experience certificate from private individual shall not be considered. However, in addition to work experience certificates issued by any Govt. Organization, work experience certificate issued by Public listed company having average annual turnover of Rs 500 crore and above in last 3 financial years excluding the current financial year, listed on National Stock Exchange or Bombay Stock Exchange, incorporated/registered at least 5 years prior to the date of closing of tender, shall also be considered provided the work experience certificate has been issued by a person authorized by the Public listed company to issue such certificates. In case tenderer submits work experience certificate issued by public listed company, the tenderer shall also submit along with work experience certificate, the relevant copy of work order, bill of quantities, bill wise details of payment received duly certified by Chartered Accountant, TDS certificates for all payments received and copy of final/last bill paid by company in support of above work experience certificate.
Conducting feasibility study, investigation, detailed survey and detailed project report preparation and detailed design work in connection with elimination of level Crossings by constructing 09 ROBs on following Level Crossings on Jabalpur Division of WCR.1) Itarsi - Jabalpur section 03 Nos ( LC No. 285, 305 & 309) (2) Jabalpur - Manikpur section - 02 Nos (LC No. 328 & 340) (3) Katni - Singrauli section - 02 Nos (LC No. 67 & 88) (4) Katni - Satna section - 02 Nos (One common ROB to be constructe4d for LC No. 360 & JK1) (5) Bina - Katni section- 01 No (LC No. 89)
CPM-GSU-JBP-04-2026~WCR
CPM-GSU-JBP-04-2026
Open
Works - General
9 Months
Jabalpur, Madhya Pradesh
₹0
₹2.6 L
28 Sept 2026
28 Sept 2026
9 Oct 2026
11 items across 3 schedules
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 26,84,700.95 | ||
| — | 9.00 | — | — | ||
| Conducting final Location Survey for Construction of ROBs as per relevant para of IR Engineering Code (1993) edition and submission of report. Work to be conducted as per Railways latest codes and as per Special Conditions mentioned in the tender document (Unit to be read as each ROB). Note: The Rates hould include the following items. (i) Conducting detailed survey for taking longitudinal and trans verse section taking detail of waterways, electrical and telephone crossing road details etc. along the route and plotting the alignment on village map, village map to be arranged by contractor. (ii) Pegging out of alignment at every 20m interval on straight and 10m interval on curves including setting out of curves with transition etc. working out detail quantities of all items of earthwork, Concrete, steel, bituminous Road items (As per MORTH Schedule), and submission of document as per relevant Paras of Engineering Code with schematic diagram. (iii) Planting of concrete pillars of size 15cmx15cmx60cm of 1:2:4 cement concrete proportion at every 50m interval at Center Line and edge of ROW of ROB corridor (with contractor's materials labour tools and plants including taxes and royalties). (iv) Submission of detailed project report in 5 (five) copies and soft copy on Pen drive. (v) Transferring the finalized alignment on ground using total station or any other survey instrument as approved by Engineer-in-charge. (vi)Preparation of Land Plans table along the existing track and proposed alignment for identification & measurement of adjoining properties required for superimposition of revenue record. It also includes collection of revenue maps. (vii) Schedule of land property required for (Railway portion + approaches) for acquisition purpose will be prepared by the Contractor as per format advised by Railway.(viii) Preparation of land acquisition proposal (20A) in five copies as per Revenue Department's requirement of respective State including Collection of Land Records including superimposition of revenue record on proposed alignment & calculation of land requirement. (ix) Preparation of 20E proposal for publication after JMS with state Govt officials. (x) Preparation of Form 11 for 20F with consultation of respective State Govt Officials. Note: This item consists of 10 sub works. If any of the sub-work is not done then the payment will be deducted on pro-rata basis. | — | — | — | 16,17,840.21 | |
| — | 9.00 | — | — |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
ACSNo.1to9IRGCCApril2022_compressed.pdf ASC No 1 to 9
ATTACHMENT
ACSNo.10dated04.03.2025.pdf
ATTACHMENT
letterforcredit.pdf
ATTACHMENT
Annexure-BVIB.pdf
ATTACHMENT
ACSNo.11dated13.03.2026_compressed.pdf ACS No 11 of IRGCC
ATTACHMENT
TenderDocument-DPR-ROB.pdf
ATTACHMENT
ACSNo.1to9IRGCCApril2022_compressed.pdf
ATTACHMENT
ACSNo.11dated13.03.2026_compressed.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .