Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹48.8 LAccepted-AOC NO 203 204 PLAZA CENTER 129 G N CHETTY ROAD CHENNAI 600 006 | CHENNAI | TAMIL NADU | 600006 | ₹48.8 L Quoted ₹56.8 L | L1 | Accepted-AOC L1 |
| 2 | L2₹70.5 LRejected-Finance | ₹70.5 L | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | SRI SARAVANA INDUSTRIES L2 | U-TECH CONSULTANTS AND ENGINNERS PVT LTD L1 |
|---|---|---|---|---|---|
| 1.00 | Labour Charges for Re-tubing of 1 No Vent Condenser Tube system for 210 MW LMW Design Turbine by 90/10 Cupro Nickel Tubes. (As per Scope of Work) | 1 | No. | 9,90,000 ₹11,68,200 | 8,60,000 ₹10,14,800 Lowest |
| 2.00 | Material cost for retubing of Vent Condenser tube nest of 210 MW LMW design Turbine by 90/10 Cupro Nickel Tubes. Material Specification:
Tube Size : Outer Dia-19.05 mm , Inner Dia-16.63 mm
Material : 90/10 Cupro Nickel tubes.
Total No. of tubes : 416 Nos
Total Length of tubes : 3444.48 Mtr
Hydraulic test : 12 KSC | 1 | No. | 42,75,000 ₹50,44,500 | 35,00,000 ₹41,71,300 Lowest |
| 3.00 | Transportation charges of Vent Condenser tube nest from MTPS-I to work spot (To & Fro) | 1 | LS | 40,000 ₹47,200 | 26,000 ₹30,680 Lowest |
| 4.00 | Loading & Unloading charges (Both ends) | 1 | LS | 17,000 ₹20,060 | 500 ₹590 Lowest |
| 5.00 | Insurance Charges (To & Fro) | 1 | LS | 20,000 ₹23,600 | 17,000 ₹20,060 Lowest |
| 6.00 | Packing & Forwarding charges (Both ends) | 1 | LS | 36,000 ₹42,480 Lowest | 40,000 ₹47,200 |
| 7.00 | Less credit estimate value of eroded admirality brass tube ( Scrap ) | 1 | LS | 6,00,000 ₹7,08,000 | 3,39,000 ₹4,00,020 Lowest |
Tender Value
Refer Docs
EMD Value
₹49,770
Closing Date
18 Dec 2023, 2:00 pmClosed
CE / MTPS-I
Mettur Dam-636406
Re tubing of 1 No Vent Condenser Tube system for 210 MW LMW Design Turbine by 90 10 Cupro Nickel Tubes As per specification and Scope of Work
2023_EB_396370_1
CE MTPS I EE SI AEE I OT 119 2023 24
Open Tender
Miscellaneous Works
Works
90 days
MTPS-I / Mettur Dam
As per the tender specification
4 documents required · 4 mandatory
₹0
₹49,770
Yes
3 Aug 2026
5 Dec 2023
19 Dec 2023
5 Dec 2023
18 Dec 2023
5 Dec 2023
Labour Charges for Re-tubing of 1 No Vent Condenser Tube system for 210 MW LMW Design Turbine by 90/10 Cupro Nickel Tubes. (As per Scope of Work)
Material cost for retubing of Vent Condenser tube nest of 210 MW LMW design Turbine by 90/10 Cupro Nickel Tubes. Material Specification: Tube Size : Outer Dia-19.05 mm , Inner Dia-16.63 mm Material : 90/10 Cupro Nickel tubes. Total No. of tubes : 416 Nos Total Length of tubes : 3444.48 Mtr Hydraulic test : 12 KSC
Transportation charges of Vent Condenser tube nest from MTPS-I to work spot (To & Fro)
Loading & Unloading charges (Both ends)
Insurance Charges (To & Fro)
Packing & Forwarding charges (Both ends)
Less credit estimate value of eroded admirality brass tube ( Scrap )
SRI SARAVANA INDUSTRIES
U-TECH CONSULTANTS AND ENGINNERS PVT LTD
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].