| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.5 LAdmitted-Finance | ₹19.5 L | L1 | Admitted-Finance |
| 2 | L2₹20.9 L+₹1.4 L (7.20%)Admitted-Finance | ₹20.9 L+₹1.4 L (7.20%) | L2 | Admitted-Finance |
| 3 | L3₹21.3 L+₹1.8 L (9.36%)Admitted-Finance | ₹21.3 L+₹1.8 L (9.36%) | L3 | Admitted-Finance |
| 4 | L4₹22.4 L+₹2.9 L (15.1%)Admitted-Finance 63B 664 NEW JANTA COLONY MASTAJAB QUARTER AGRA CANT AGRA 282001 | AGRA | UTTAR PRADESH | 282001 | ₹22.4 L+₹2.9 L (15.1%) | L4 | Admitted-Finance |
| 5 | Rejected-Technical | - | - | Rejected-Technical DISQUALIFY |
| Sl No | Description | Qty | Unit | M/S HARISH SHARMA L4 | PAPPAN ELECTRIC AND GAS WELDING WORKS L1 | DHAKARE BROTHERS L2 | ANAND INFRAWORKS PRIVATE LIMITED L3 |
|---|---|---|---|---|---|---|---|
| 1.00 | Provision for clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. (Rate Including GST as per Rule). | 1,626.88 | Sqm | 5 ₹8,134.4 Lowest | 5 ₹8,134.4 Lowest | 7.86 ₹12,787.28 | 7.5 ₹12,201.6 |
| 2.00 | Excavation work in ordinary rock by manual means in foundation, including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m. (Rate Including GST as per Rule). | 63.42 | Cum | 200 ₹12,684 | 355 ₹22,514.1 | 182 ₹11,542.44 | 175 ₹11,098.5 Lowest |
| 3.00 | Providing and laying in position cement concrete of specified grade 1:4:8 (1 cement: 4 coarse sand: 8 graded stone aggregate 20 mm nominal size). (Rate Including GST as per Rule). | 21.04 | Cum | 4,235 ₹89,104.4 | 3,818 ₹80,330.72 Lowest | 4,487 ₹94,406.48 | 4,500 ₹94,680 |
| 4.00 | Provision for Random rubble masonry with hard stone in foundation and plinth in Cement mortar 1:6 (1 cement: 6 coarse sand) including T & P, Material, Scaffolding etc complete. (Rate Including GST as per Rule). | 122.49 | Cum | 4,021 ₹4,92,532.29 Lowest | 4,098 ₹5,01,964.02 | 4,786 ₹5,86,237.14 | 4,560 ₹5,58,554.4 |
| 5.00 | Providing and laying damp-proof course 50mm thick with cement concrete 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20mm nominal size derived from natural sources). (Rate Including GST as per Rule). | 120.48 | Sqm | 300 ₹36,144 | 278 ₹33,493.44 Lowest | 386 ₹46,505.28 | 600 ₹72,288 |
| 6.00 | Providing Coursed rubble in pillar with hard stone with :Cement mortar 1:6 (1 cement : 6 coarse sand) including supply of all materials labour T&P etc. required for proper completion of work. (Rate Including GST as per Rule). | 19.56 | Cum | 4,578 ₹89,545.68 Lowest | 4,594 ₹89,858.64 | 5,386 ₹1,05,350.16 | 5,055 ₹98,875.8 |
| 7.00 | Providing & fixing M.S. grill of required pattern with angle iron frames (40x40x6) mm size and graded with square bars 12mm size 10 cm c/c pointed at the top with extra curved bar and each frame with (40x40x6) mm size horizontal hold fast welded with lower posts and fixing angle iron vertical post (50x50x6) mm size and nut bolts including cutting fabricating welding etc. complete (Sample Drawing Attached). (Rate Including GST as per Rule). | 8,104.46 | Kg | 125.21 ₹10,14,759.44 | 97 ₹7,86,132.62 | 96 ₹7,78,028.16 Lowest | 102.5 ₹8,30,707.15 |
| 8.00 | Providing & fixing M.S. gates of required pattern with angle iron frames (50x50x6) mm size and cross post m.s. flat 50x6 mm graded with 10 cm c/c Sq. bars 16mm size pointed at the top extra with same curved bar and each frame having Gusset plate 6mm thick at corners & center and provision for hinges and locking arrangement with supply of R.S. Joist (200x100x5.7) mm section for hanging M.S. gate including nut bolts, cutting fabricating welding etc. complete(Sample Drawing Attached). (Rate Including GST as per Rule). | 1,479.33 | Kg | 126.21 ₹1,86,706.24 | 97 ₹1,43,495.01 | 95 ₹1,40,536.35 Lowest | 101 ₹1,49,412.33 |
| 9.00 | Providing and laying 10mm av thick simple molded plaster 1:1:1 ratio composite lime mortar (1Lime :1C.Sand :1Surkhi) mixed with composite materials labour T&P etc. required for proper completion work. (Rate Including GST as per Rule). | 136.06 | Sqm | 275 ₹37,416.5 | 174 ₹23,674.44 Lowest | 286 ₹38,913.16 | 200 ₹27,212 |
| 10.00 | Recessed Pointing on walls 1:1:1 ratio lime mortar (1Lime :1 C. sand: 1 Surkhi) mixed with colour pigment, belgiri, gum & gur including racking out joints etc. and supply of all materials labour, scaffolding, T&P etc. required for proper completion of work. (Rate Including GST as per Rule). | 593.72 | Sqm | 125 ₹74,215 Lowest | 127 ₹75,402.44 | 168 ₹99,744.96 | 160 ₹94,995.2 |
Tender Value
₹33.8 L
EMD Value
₹84,426
Closing Date
25 May 2026, 3:00 pmClosed
Superintending Archaeologist
O/o The S.A. ASI, 22 Mall Road Agra Circle Agra
AS PER TENDER DOCUMENT
2026_ASI_908027_1
07/FTS/20/2025-2026/W
Open Tender
Civil Works
Works
180 days
FATEHPUR SIKRI
AS PER TENDER DOCUMENT
8 documents required · 8 mandatory
₹0
₹84,426
Yes
25 Jun 2026
8 May 2026
26 May 2026
8 May 2026
25 May 2026
8 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Provision for clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. (Rate Including GST as per Rule). | 1,626.88 | Sqm | 100 | ₹1,62,688 |
| 2 | Excavation work in ordinary rock by manual means in foundation, including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m. (Rate Including GST as per Rule). | 63.42 | Cum | 101 | ₹6,405.42 |
| 3 | Providing and laying in position cement concrete of specified grade 1:4:8 (1 cement: 4 coarse sand: 8 graded stone aggregate 20 mm nominal size). (Rate Including GST as per Rule). | 21.04 | Cum | 102 | ₹2,146.08 |
| 4 | Provision for Random rubble masonry with hard stone in foundation and plinth in Cement mortar 1:6 (1 cement: 6 coarse sand) including T & P, Material, Scaffolding etc complete. (Rate Including GST as per Rule). | 122.49 | Cum | 103 | ₹12,616.47 |
| 5 | Providing and laying damp-proof course 50mm thick with cement concrete 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20mm nominal size derived from natural sources). (Rate Including GST as per Rule). | 120.48 | Sqm | 104 | ₹12,529.92 |
| 6 | Providing Coursed rubble in pillar with hard stone with :Cement mortar 1:6 (1 cement : 6 coarse sand) including supply of all materials labour T&P etc. required for proper completion of work. (Rate Including GST as per Rule). | 19.56 | Cum | 105 | ₹2,053.8 |
| 7 | Providing & fixing M.S. grill of required pattern with angle iron frames (40x40x6) mm size and graded with square bars 12mm size 10 cm c/c pointed at the top with extra curved bar and each frame with (40x40x6) mm size horizontal hold fast welded with lower posts and fixing angle iron vertical post (50x50x6) mm size and nut bolts including cutting fabricating welding etc. complete (Sample Drawing Attached). (Rate Including GST as per Rule). | 8,104.46 | Kg | 106 | ₹8,59,072.76 |
| 8 | Providing & fixing M.S. gates of required pattern with angle iron frames (50x50x6) mm size and cross post m.s. flat 50x6 mm graded with 10 cm c/c Sq. bars 16mm size pointed at the top extra with same curved bar and each frame having Gusset plate 6mm thick at corners & center and provision for hinges and locking arrangement with supply of R.S. Joist (200x100x5.7) mm section for hanging M.S. gate including nut bolts, cutting fabricating welding etc. complete(Sample Drawing Attached). (Rate Including GST as per Rule). | 1,479.33 | Kg | 107 | ₹1,58,288.31 |
| 9 | Providing and laying 10mm av thick simple molded plaster 1:1:1 ratio composite lime mortar (1Lime :1C.Sand :1Surkhi) mixed with composite materials labour T&P etc. required for proper completion work. (Rate Including GST as per Rule). | 136.06 | Sqm | 108 | ₹14,694.48 |
| 10 | Recessed Pointing on walls 1:1:1 ratio lime mortar (1Lime :1 C. sand: 1 Surkhi) mixed with colour pigment, belgiri, gum & gur including racking out joints etc. and supply of all materials labour, scaffolding, T&P etc. required for proper completion of work. (Rate Including GST as per Rule). | 593.72 | Sqm | 109 | ₹64,715.48 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 17.22 MB
TENDERNOTICE.pdf
Tender Documents • 17.21 MB
ELEGIBILITY.pdf
Additional Documents • 0.68 MB
ANNEXURES.pdf
Additional Documents • 1.10 MB
TENDECL.pdf
Additional Documents • 0.97 MB
BOQ_954363.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .