Loading…
Loading…
Tender Value
₹15.8 L
EMD Value
₹15,792
Closing Date
29 Sept 2026, 5:00 pmDue tomorrow
DFO,Chilika WL Division
Office of the DFO,Chilika WL Division, Balugaon
Construction of 2nd Floor Divisional ECRICC and Sea Grass Project Management Centre at Balugaon Composite
2026_DFOCH_141152_1
02/2026-27
Open Tender
Civil Works - Buildings
Percentage
90 days
Balugaon
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
DFO, Chilika Wildlife Division
₹15,792
Yes
18 Sept 2026
18 Sept 2026
30 Sept 2026
18 Sept 2026
29 Sept 2026
18 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Providing, lifting, hoisting and laying in Position Reinforced Cement Concrete of M-30 grade including cost of Centering and shuttering using 20mm and down grade size black hard granite (Crusher Broken) chips of approved quality from approved quary including the cost of all materials, cost of all labour, conveyance, taxes, loading, unloading, T&P, royalty, labour cess, all complete as per the direction of Engineer-in-charge but excluding the cost of steel reinforcement. | |||||
| 1.01 | R.C.C. Columns & Roof Beams | - | - | - | - |
| 1.02 | (a)Second Floor | 2.85 | Cum | 25,053.1 | ₹71,451.44 |
| 1.03 | R.C.C. Lintels | - | - | - | - |
| 1.04 | (a)Second Floor | 1.56 | Cum | 19,137.1 | ₹29,777.33 |
| 1.05 | R.C.C. Chajja | - | - | - | - |
| 1.06 | (a)Second Floor | 0.65 | Sqm | 1,690.2 | ₹1,103.7 |
| 1.07 | R.C.C. Floor and Roof Slab, Landing, Balconies, Projecting Sun Shades and Chajjas up to 4.3 Mtr. Height. | - | - | - | - |
| 1.08 | (a)Second Floor | 1.9 | Cum | 18,565.1 | ₹35,273.69 |
| - | Cutting, Straightening, coiled or bent up MS Road of TOR steel using SAIL/RINL/TATA/JINDAL/SHYAM Steel including bending, binding,welding and joining if necessary and tying the grills and placing in position as required for RCC work and hoisting, lowering laying icluding cost, conveyance, taxes of MS rod or TOR steel and binding wire of 18 to 20 gauge and labour required for the work for bending,binding and tying the grills etc. complete. | - | - | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.27 MB
dtc.pdf
Tender Documents • 1.90 MB
BOQ_609923.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .