Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
Closing Date
14 Jun 2021, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
DGM (C)
3rd floor, admin building, barauni refinery, begusarai
Inspection of Turbine Rotor assembly of LP Air Compressor (726-KT-101) and WGC Lube Oil Pump Turbine (701-LOPT-201) of BXP Unit, Barauni Refinery.
2021_BR_135101_1
BCCM214920
Single
Mechanical Works
Works
60 days
Barauni Refinery
Please refer Tender documents.
5 documents required · 5 mandatory
Exempted
15 Jun 2021
7 May 2021
15 Jun 2021
7 May 2021
14 Jun 2021
15 May 2021
7 May 2021 - 14 May 2021
120 days
Amount
Inspection for 726-KT-101 Turbine Rotor
Inspection of SRU 726-KT-101 Turbine Rotor: 1. Receive the rotor & unload the rotor at vendor's workshop. 2. Unpack from rotor Box & receiving inspection of rotor. 3. Water jet cleaning and Grit blasting of the Rotor, if required. 4. Visual Inspection AND PHOTOGRAPH of the rotor. 5. Remove the rusty position of shaft by hand for detail inspection. 6. Remove all preservative from rotor using solvent cleaning only. 7. Air cleaning and Cleaning of the sensitive areas such as Journal, Seal, Thrust Collar etc. 8. Dimension & Concentricity check for rotor 9. Magnetic Particle Inspection for rotor. 10. Demagnetizing of rotor. 11. Gauss check of the rotor to below 5 gauss. 12. Axial and Radial run-out Check of the Rotor. 13. Furnish report of Initial Inspection. 14. Low Speed Balance Check as per Elliott standards and Record (If conditions of journal areas are good). b) OTHER TERMS & CONDITIONS: 1. The vendor shall be responsible to complete the entire work as per schedule of rates and specifications in all respects. Any additional work identified during inspection, as mutually agreed between IOCL and Elliott, shall attract additional price and lead time. Same shall be informed by M/s Elliott to IOCL for Joint Inspection post which Elliott shall submit proposal for additional scope of work (if required). 2. Vendor to start the job immediately just after receipt of rotors at their works and try to complete the job in earliest possible time. 3. Rotor will be dispatched in the same container as provided by IOCL. (c) Submission of following reports by vendor: 1. Initial Concentricity check report 2. Initial Dimension check report 3. Initial Magnetic particle examination report 4. Initial Low speed balance check report. IOCL scope : 1. Rotor will be sent in well packed condition before shipment. 2. Loading/Unloading of all rotors at IOCL, BR site. 3. To & fro transportation including transit insurance for rotor
Inspection of RFCC 701-LOPT-201 Turbine Rotor: 1. Receive the rotor & unload the rotor at vendor's workshop. 2. Unpack from rotor Box & receiving inspection of rotor. 3. Water jet cleaning and Grit blasting of the Rotor, if required. 4. Visual Inspection AND PHOTOGRAPH of the rotor. 5. Remove the rusty position of shaft by hand for detail inspection. 6. Remove all preservative from rotor using solvent cleaning only. 7. Air cleaning and Cleaning of the sensitive areas such as Journal, Seal, Thrust Collar etc. 8. Dimension & Concentricity check for rotor 9. Magnetic Particle Inspection for rotor. 10. Demagnetizing of rotor. 11. Gauss check of the rotor to below 5 gauss. 12. Axial and Radial run-out Check of the Rotor. 13. Furnish report of Initial Inspection. 14. Low Speed Balance Check as per Elliott standards and Record (If conditions of journal areas are good). b) OTHER TERMS & CONDITIONS: 1. The vendor shall be responsible to complete the entire work as per schedule of rates and specifications in all respects. Any additional work identified during inspection, as mutually agreed between IOCL and Elliott, shall attract additional price and lead time. Same shall be informed by M/s Elliott to IOCL for Joint Inspection post which Elliott shall submit proposal for additional scope of work (if required). 2. Vendor to start the job immediately just after receipt of rotors at their works and try to complete the job in earliest possible time. 3. Rotor will be dispatched in the same container as provided by IOCL. (c) Submission of following reports by vendor: 1. Initial Concentricity check report 2. Initial Dimension check report 3. Initial Magnetic particle examination report 4. Initial Low speed balance check report. IOCL scope : 1. Rotor will be sent in well packed condition before shipment. 2. Loading/Unloading of all rotors at IOCL, BR site. 3. To & fro transportation including transit insurance for rotor
stage.html
html • 0.01 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .