| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.1 LAccepted-AOC | L1 | Accepted-AOC BEING L1 | |
| 2 | L2₹9.8 L+₹72,099 (7.96%)Rejected-Finance | L2 | Rejected-Finance BEING L2, DUE TO HIGH RATE | |
| 3 | L3₹9.8 L+₹77,022 (8.50%)Rejected-Finance | L3 | Rejected-Finance BEING L3, DUE TO HIGH RATE | |
| 4 | L4₹9.9 L+₹88,219 (9.74%)Rejected-Finance | L4 | Rejected-Finance BEING L4, DUE TO HIGH RATE |
Tender Value
₹10.6 L
Closing Date
15 Dec 2020, 10:00 amClosed
Executive Engineer(Kand GN), ALHW, Campbell Bay
O/o Deputy Chief Engineer(N), ALHW, Campbell Bay
Construction of permanent RCC duct for placing cable for providing illumination to Breakwater and deep water wharf from Junction box near Breakwater store to workshop road junction in Breakwater complex at Campbell bay.
2020_ALHW_599108_1
ALHW/EEC/CB/DB/TEND-22/2020-21
Open Tender
Civil Works
Item Rate
30 days
Campbell Bay, Great Nicobar, A and N Islands
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
Exempted
6 Feb 2021
26 Nov 2020
16 Dec 2020
26 Nov 2020
15 Dec 2020
26 Nov 2020
26 Nov 2020 - 8 Dec 2020
Amount
Routine Maintenance of RCC Jetty at Campbell Bay for the period of one year.
Earth work in excavation in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressisng of sides and ramming of bottoms, lift upt 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 M including GST & Labour cess. a) All kinds of soil
Providing and laying PCC 1:4:8 (one cement 4 pulvarised sand &8 stone aggregate of 40mm nominal size from Main land quarry) including cost of cement Main land pulvarised stone sand and Main land stone metal.cost all other materials, all labour for mixing, placing, curing cost of minor tools hire charges of mixer, machine, vibrator, minor GST & Labour cess tools etc, complete
Providing RCC 1:1 1/2:3 (one cement 1.5 Main land River sand & 3 main land stone aggregate of 20mm nominal size )including cost of cement Main land river sand and Main land stone metal.cost all other materials, all labour for mixing, placing, curing cost of minor tools hire charges of mixer, machine, vibrator, minor GST & Labour cess tools etc, as directed by the Engineer-In-Charge excluding cost of fabrication charges of steel reinforecement, centering & shuttering charge etc complete.
Providing and fixing mild for steel reinforcement for column slab beam lintel etc including cost of steel , binding wire, cutting bending, binding and all labour charges minor tools transportation charges GST & Labour cess etc Complete.
Providing form work for foundation Column, Slab beam etc; as directed by the Engineer-In-Charge including cost of all materials such as timber, bellies, wire nails etc., transportation charges of all materials to work site and cost of all labour charges minor tools GST & Labour cess etc complete.
USR TRANSPORT
KVB CONSTRUCTION
HITUI
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .