Improvement to Janalabadia MIP (Diversion Weir) in Baramba Block of Cuttack District under Improvement to Diversion Weir Scheme for the Year 2026-27.
2026_CEMIB_130096_1
SECMID_05/2026-27
Open Tender
Civil Works - Canal
120 days
Baramba
Please refer Tender documents.
3 documents required · 3 mandatory
₹6,000
₹40,200
Yes
30 May 2026
30 May 2026
9 Jun 2026
30 May 2026
8 Jun 2026
30 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Clearing grass and removal of rubbish and depositing the same clear of work site with all leads, lifts and delifts etc with supply of all labour and T&P required for the work etc. complete in all respect as directed by the Engineer-in-Charge. | 15,000 | One hundred square metre | 286.2 | ₹42,93,000 | - |
| 2 | Excavation of foundation to proper profile in all kinds of soil with all leads, lifts and de-lifts including dressing and levelling the bed to proper slope and level and making it fit for laying concrete including depositing the excavated materials clear of work site with all leads and lifts etc, including dewatering from foundation if required, with supply of all labour and T&P required for the work etc, complete in all respect as directed by the Engineer-in-charge. (Measurement will be taken on finished level section)only. | 202.5 | One hundred cubic metre | 28,288.6 | ₹57,28,441.5 | BI01010001010000000000000515BI0100001112 |
| 3 | Excavation loading, unloading and carriage by mechanical means of all kinds of soil, including Stoney earth, gravel and moorum etc inters read with boulders upto1/2 cum size wih all lifts and delifts including trimming of slope and bed to design section and depositing the excavated materials away from site as per the specification and as directed by the Engineer-in-charge within an initial lead of 1 km from the place of excavation complete as directed by the Engineer in-charge. (Measurement will be taken on finished level section)only. (1 KM) | 11,030 | One cubic metre | - | - | BI01010001010000000000000515BI0100001113 |
| 4 | Providing Cement Concrete M15 grade on approved surface , shape and size using 20mm and downgraded crusher broken hard granite stone aggregates of approved quality quarried, free from weathered skin surface and any other deleterious materials, using clean and sharp sand of approved grading and quality confirming to the design specifications including hoisting & lowering to all heights, watering & dewatering, laying the concrete in position to proper slope and level, compacting in layers with vibrators and finishing the exposed surface smooth, curing for required time, providing beads and grooves including cost, conveyance, royalty and other taxes of all materials, with all cost of tools and plant, cost and carriage of water etc, with supply of all labour and supervision charges including mobilisation & demobilisation of machineries, all incidental charges required for the work complete in all respect as directed by the Engineer-in-charge. | 144.41 | One cubic metre | - | - | - |
| 5 | Providing Cement Concrete M20 grade for RCC works on approved surface, shape and size using 20mm and downgraded crusher broken hard granite stone aggregates of approved quality quarried, free from weathered skin surface and any other deleterious material, using clean and sharp sand of approved grading and quality confirming to the design specifications including hoisting & lowering to all heights, watering & dewatering, laying the concrete in position to proper slope and level, compacting in layers with vibrators and finishing the exposed surface smooth, curing for required time, providing beads and grooves including cost, conveyance, royalty and other taxes of all materials, ( excluding cost, carriage of M.S. rod and labour for cutting, bending, binding and fixing of M.S. rod) with all cost of tools and plant, cost and carriage of water etc, with supply of all labour and supervision charges including mobilisation & demobilisation of machineries, with all incidental charges required for the work complete in all respect as directed by the Engineer-in-charge. | 116.16 | One cubic metre | 1 | ₹116.04 | - |
| 6 | Supplying, straightening, cutting, bending, binding of steel reinforcement of different diameters and tying the grills as per approved design & drawing and placing in position including, cost, conveyance, royalties and other taxes of M.S. Rods, binding wires of 18 to 20 gauge including providing concrete chairs, dowel bars, lapping wherever necessary with supply of all labour and T&P required for the work etc, complete in all respect as directed by the Engineer-in-charge. | 15.38 | One Quintal | - | - | - |
| 7 | Providing rigid shuttering with the box type steel shuttering plates with keys for intermediate construction joints for plain or reinforced cement concrete works including false work and dismantling the same after casting and proper curing including cost, conveyance, royalty and taxes of all materials required for the work with supply of all labour and T&P required for the work etc, complete in all respect as directed by the Engineer-in-charge. | 1,111.2 | One square metre | 1 | ₹1,110.09 | - |
| 8 | Rough stone dry packing in aprons & revetments to all heights & thickness using hard stones of size (15cm to 30cm) of approved quality free from weathered skin surface including filling the interstices with small stones by wedging & hammering to proper slope and level with cost conveyance, royalty & other taxes of all materials, labour & T & P materials required for this items complete in all respect as directed by the Engineer-in-charge. | 266.5 | One cubic metre | - | - | - |
| 9 | Removing old lime or cement plaster from walls including racking out joints 12mm deep and removing the debris clear of work site with all leads, lifts and delifts including all labour and T & P materials required for the item complete in all respect as directed by the Engineer-in-charge. | 479.2 | One square metre | 1 | ₹478.72 | - |
| 10 | 20mm. thick Cement Plaster with cement mortar (1:6) for stone work finished smooth after racking out joints 12.5mm. deep including cost, conveyance, royalty and other taxes of all materials including scaffolding gangways, curing for required period with all labours and T &P materials required for the works complete in all respect as directed by the Engineer-in-Charge. | 479.2 | One square metre | 1 | ₹478.72 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 18.54 MB
BOQ_593187.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid