Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical VILL SOBLI P O DEVNAGAR TEHSIL RAMPUR DISTT SHIMLA H P | SHIMLA | SHIMLA | HIMACHAL PRADESH | Accepted-Technical Responsive |
| 2 | Accepted-Technical VILLAGE P O BAHLI TEHSIL RAMPUR DISTT SHIMLA H P | BAHLI | SHIMLA | HIMACHAL PRADESH | Accepted-Technical Responsive |
Tender Value
₹6.7 L
EMD Value
₹15,000
Closing Date
23 Jul 2026, 9:00 amClosed
EE Rampur
EE B and R Division HPPWD Rampur
SH C.O R.wall and B.wall 2.585 to 2.615 across seri khad
2026_PWD_139310_1
PW/RMP/TA/2026-4723 dated 25.06.2026
Open Tender
Civil Works - Roads
Percentage
EE B and R Division HPPWD Rampur
Please refer Tender documents.
10 documents required · 10 mandatory
₹350
Yes
₹15,000
Yes
31 Jul 2026
17 Jul 2026
23 Jul 2026
17 Jul 2026
23 Jul 2026
17 Jul 2026
17 Jul 2026 - 23 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto all leads , dressing of sides and bottom and back filling in trenches with excavated suitable material in ordinary soil upto all depth. as directed by the Engineer-in-Charge.all useful material such as stone, shingle, aggregates& slate etc. shall be sorted out and stacked along the road side properly. Any loss to the public and private property to during the course of execution shall be the absoulte responsibility of the contractor which shall have to be duly compensated by him in all cases. | 140.1 | Per cubic meter | 558.99 | ₹78,314.5 |
| 2 | Providing and laying boulder apron laid in wire crates mate with G.I.wire confirming to IS :280 & IS 4826 in 100mmx100mm mesh (weaved diagonally including 10% extra for laps and joints laid with stone boulder weighing not less than 25 kg each as per drawing and technical specifications Clause 1301 including hauling of materials through all modes of transportation within all leads and lifts as per the entire satisfaction and direction of Engineer-in-Charge. | 165.6 | Per cubic meter | 3,200 | ₹5,29,920 |
| 3 | Backfilling behind abutment, wing wall and return wall complete as per drawings and technical specification clause 1204.3.8 with granular material. including the cost of form work and hauling of material in all leads and lifts as per the entire satisfaction and direction of the Engineer-in-Charge. | 57.6 | Per cubic meter | 1,150 | ₹66,240 |
stage.html
html • 0.02 MB
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.46 MB
SBD.pdf
Tender Documents • 2.73 MB
BOQ_206411.xls
BOQ • 5.49 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .