| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.5 CrAccepted-AOC | ₹4.5 Cr | L1 | Accepted-AOC Due to L1 |
| 2 | L2₹4.6 Cr+₹4.3 L (0.94%)Rejected-Finance PLOT NO 63 PAHADIYAN DISTRICT VARANASI UTTAR PRADESH | VARANASI | UTTAR PRADESH | 221001 | ₹4.6 Cr+₹4.3 L (0.94%) | L2 | Rejected-Finance Due to L2 |
| 3 | L3₹4.7 Cr+₹18.9 L (4.16%)Rejected-Finance | ₹4.7 Cr+₹18.9 L (4.16%) | L3 | Rejected-Finance Due to L3 |
| 4 | Not Admitted-Fee/PreQual/Technical M0 NO 211 AWAS VIKAS COLONY POLICE STATION KOTWALI KATRA TEHSIL SADAR DISTRICT MIRZAPUR | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
Refer Docs
EMD Value
₹10.5 L
Closing Date
6 Mar 2024, 2:00 pmClosed
SE IWC MIRZAPUR
SE IWC IRRIGATION COLONY FATHA, MIRZAPUR
RESTORATION OF PUCCA WORKS OF MINORS And Dys OFFTAKING FROM MARIHAN BRANCH BETWEEN KM 0.000 TO 15.000
2024_UPIDC_902734_2
NIT13/SE/2023-24
Open Tender
Civil Works
Item Wise
300 days
Rajghar, Mirzapur
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹10.5 L
31 Aug 2024
1 Mar 2024
6 Mar 2024
1 Mar 2024
6 Mar 2024
1 Mar 2024
Amount
Dismantling Brick work or stone work in lime or cement mortar including stacking of materials as directed by engg. in-charge within a distance of 60 mt.
E/W Excavation of Foundation in ordinary soil/sandy loam, clay or sand, soil mixed with boulder/ set slush in canal section including lift upto 1.5 m. & lead upto 30 m with disposal of excavation earth as directed by Engg-in-charge.
Earth work in Canals with manual compaction and dressing
Preparation of subgrade for lining work excuding cost of earth work including cost of all material, labour, T&P, Taxes etc. required for proper completion of work.
Sand filling work in foundation bellow C.C.base including cost of all material labour ,T&P etc.required.
P/L50mm thick Kattal in filter in bed and slope with cost of material, labour, T&P, Taxes etc. required for proper completion of work.(supply of material from department)
P/L 50 mm thick Kattal in filter in bed and slope with cost of material, labour, T&P, Taxes etc. required for proper completion of work.
Laying C.C. (1:3:6) in foundation with cement, course sand and hard stonee ballast including all cost of material, labour, T&P, Taxes etc. required for proper completion of work.
Providing and laying of Hume pipe of 150 mm dia (NP3) for outlet including cost of all material labour , T&P etc. required for proper completion of work .
Providing and laying of Hume pipe of 100 mm dia (NP3) for outlet including cost of all material labour , T&P etc. required for proper completion of work .
Providing and laying of Hume pipe of 1000 mm dia (NP3) for outlet including cost of all material labour , T&P etc. required for proper completion of work .
Providing and laying of Hume pipe of 600 mm dia (NP3) for outlet including cost of all material labour , T&P etc. required for proper completion of work .
Laying R.R. stonee masonery with (1:3) cement & course sand mortar including all cost of material, labour, T&P, Taxes etc. required for proper completion of work.
Laying C.R. stone masonery with (1:3) cement & course sand mortar including all cost of material, labour, T&P, Taxes etc. required for proper completion of work.(lining work)
Cement sand (1:2) pointing on stonee masonery including all cost of material, labour, T&P, Taxes etc. required for proper completion of work.
Laying CC (1:2:4) for slab and wearing coat work with cement, course sand FM not less than 2.0 and hard stonee grit 4.75 to 20 mm including all cost of material, labour, T&P, Taxes etc. required for proper completion of work.
Providing shuttering and centering work for different parts of structure including all cost of material, labour, T&P, Taxes etc. required for proper completion of work.
Laying RCC (1:1.5:3) for slab and wearing coat work with cement, course sand FM not less than 2.0 and hard stonee grit 4.75 to 20 mm including all cost of material, labour, T&P, Taxes etc. required for proper completion of work.
Carriage, cutting, bending, binding & placing of steel reinforcement and binding wire including all cost of material, labour, T&P, Taxes etc. but excluding cost of binding wire, required for proper completion of work.
Laying and fixing of joint filler board 18 mm thick including all cost of material, labour, T&P, Taxes etc. required for proper completion of work.
E/w for canal section and in back filling of walls with a total lead upto 1.0 km. by truck or tractor trolley including all cost of material, labour, T&P, Taxes etc. required for proper completion of work.
S.P.R.U INFRATECH PRIVATE LIMITED
M/S RADHEY MOHAN DUBEY CONSTRUCTION
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .