Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹7 L
Closing Date
19 Jun 2026, 10:30 am
DGM CC
Contract Cell Dept., Admin. Bldg., RCF Thal Factory, Alibag, Raigad - 402208
CONTRACT FOR RESURFACING OF VARIOUS PLANTS BITUMINOUS ROAD AT RCF THAL
2026_RCFL_910706_1
TH/CC/86754/26/D24-09(IV)/312
Open Tender
Civil Works
548 days
RCF Thal Alibag
Please refer Tender documents.
16 documents required · 16 mandatory
₹0
₹7 L
Yes
29 May 2026
29 May 2026
19 Jun 2026
29 May 2026
19 Jun 2026
29 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1.01 | EXCAVATION FOR ROADS IN SOILS OF ALL TYPES INCLUDING DRESSING SECTION TO REQUIRED CAMBER AND SIDE SLOPES, DAMAGED ASPHALT ROAD PATCHES, CONCRETE, BOLDERS ETC. IN REGULAR SHAPE LIKE SQUARE OR RECTANGLE FOR LAYING BM/FULLGROUT/CARPET ETC. INCLUDING DISPOSAL OF DEBRIS WITHIN FACTORY AREA/OUTSIDE PREMISES AS DIRECTED BY EIC. | - | Cu.M | 227 | - | C622016001 |
| 1.02 | PROVIDING DRY TRAP RUBBLE STONE SOLING 15 TO 20 CM. THICK INCLUDING HAND PACKING, FILLING THE VOIDS WITH SAND, GRIT, EARTH ETC. INCLUDING ROLLING BY STATIC ROLLER, WATERING ETC. COMPLETE AS DIRECTED BY EIC. | - | Cu.M | 1,382 | - | C622016002 |
| 1.03 | PROVIDING AND CONSTRUCTING W.B.M. ROAD IN LAYERS OF 75/100 MM COMPACTED THICKNESS, PREPARATION OF SUBGRADE WITH MURUM SCREENINGS, INCLUDING SUPPLYING AND CONVEYING ALL MATERIALS WITH ALL LEADS AND LIFTS, SPREADING, SECTIONING, ARTIFICIAL WATERING AND COMPACTING IN LAYERS WITH VIBRATORY ROLLER AS DIRECTED BY EIC INCLUDING MAINTENANCE OF DIVERSION ROAD DURING CONSTRUCTION ETC. COMPLETE FOR THE REQUIRED WIDTH OF ROAD AS DIRECTED BY EIC. | - | Cu.M | - | - | C622016003 |
| 1.04 | PROVIDING 50 MM [ABOUT 2”] THICK GROUT BITUMINIOUS ROAD SURFACE INCLUDING SUPPLYING ALL MATERIALS, PREPARING THE EXISTING ROAD SURFACE LAYING THE REQUIRED THICKNESS OF METAL LAYER, HEATING AND SPRAYING BITUMEN DOSE OF 04 KG/1 SQM, SPREADING CHIPS, LAYING WITHOUT SEAL COAT, MANUAL LAYING FOR POT HOLES AND COMPACTING WITH STATIC POWER ROLLER ETC. COMPLETE. [WITH BULK BITUMEN 60/70GRADE OR VG30]. | - | Sq.M | - | - | C622016004 |
| 1.05 | PROVIDING AND LAYING BITUMINOUS TACK COAT BY MANUAL/MECHANICAL SPRAYER INCLUDING SUPPLYING ALL MATERIALS, PREPARING THE EXISTING SURFACE, HEATING BITUMEN AND APPLYING TACK COAT EVENLY ON THE SURFACE ETC. COMPLETE @ 0.5 KG./SQ.M. OF BITUMEN. [WITH BULK BITUMEN 60/70 GRADE OR VG30] | - | Sq.M | - | - | C622016005 |
| 1.06 | PROVIDING & LAYING HOT MIX HOT LAID BITUMINUOUS MACADAM 50 MM AVERAGE THICKNESS WITH 3.5% BITUMEN OF GRADE 60/70 OR VG30 BY WEIGHT OF TOTAL MIX INCLUDING DIVERSION OF TRAFFIC SUPPLY OF ALL MATERIALS, HEATING BITUMEN AND CHIPS IN DRUM MIX PLANT, CLEANING THE ROAD SURFACE, LAYING BITUMINUOUS MACADAM BY PAVER FINISHER & MANUAL LAYING FOR POT HOLES INCLUDING COMPACTING WITH STATIC/ VIBRATORY POWER ROLLER AS DIRECTED BY EIC, TRANSPORTATION AND COST OF ALL MATERIALS, BITUMEN FROM REFINERY ETC. COMPLETE. | - | M.T. | - | - | C622016006 |
| 1.07 | PROVIDING & LAYING HOT MIX HOT LAID BITUMEN CARPET AVERAGE 25 MM AVERAGE THICKNESS WITH 5.0% BITUMEN OF GRADE 60/70 OR VG30 BY WEIGHT OF TOTAL MIX INCLUDING SUPPLYING ALL MATERIALS HEATING BITUMEN AND CHIPS.MIXING BITUMEN AND CHIPS IN HOT MIX PLANT. LAYING BITUMEN CARPET WITH PAVER FINISHER & MANUAL LAYING FOR POT HOLES INCLUDING COMPACTING WITH STATIC/ VIBRATORY POWER ROLLER AS DIRECTED BY EIC, TRANSPORTATION AND COST OF ALL MATERIALS, BITUMEN FROM REFINERY ETC. COMPLETE. | - | M.T. | - | - | C622016007 |
| 1.08 | PROVIDING & LAYING HOT MIX HOT LAID BITUMINOUS CONCRETE AVERAGE 25 MM COMPACTED AVERAGE THICKNESS WITH 6.0% BITUMEN OF GRADE 60/70 OR VG30 BY WEIGHT OF TOTAL MIX INCLUDING SUPPLYING ALL MATERIALS HEATING BITUMEN AND CHIPS, MIXING BITUMEN AND CHIPS IN HOT MIX PLANT WITH ADDITION OF LIME FILLER @ 2.0% AND ANTI-STRIPPING AGENT @ 1.0% BY WEIGHT OF BITUMEN ETC. LAYING PREMIX WITH PAVER FINISHER & MANUAL LAYING FOR POT HOLES INCLUDING COMPACTING WITH VIBRATORY POWER ROLLER SPREADING STONE DUST, TRANSPORTATION AND COST OF ALL MATERIALS, BITUMEN FROM REFINERY, ETC. COMPLETE AS DIRECTED BY EIC. | - | M.T. | - | - | C622016008 |
| 1.09 | PROVIDING BITUMINOUS LIQUID SEAL COAT TO BLACK TOP SURFACE INCLUDING SUPPLYING ALL MATERIALS WITH ALL LEADS,PREPARING EXISTING ROAD SURFACE HEATING AND APPLYING BITUMEN @ 1.0KG/SQM, SPREADING CHIPS AND ROLLING COMPLETE (BY USING BULK BITUMEN 60/70 GRADE OR VG30). | - | Sq.M | - | - | C622016009 |
| 1.1 | PROVIDING AND APPLYING HOT APPLIED THERMOPLASTIC ROAD MARKING MATERIAL WITH GLASS BEADS EXTREMELY HIGH SKID RESISTANCE 2.5 MM THICK WITHOUT PRIMER COAT (TACK COAT) ON ASPHALT ROAD SURFACE. ALL LABOUR, MATERIALS, WITH SPECIAL AGGREGATES AS SPECIFIED IN B.S.3262-1-1989-I & II AND CARRYING OUT THE MARKING ON ANY ROAD IN CENTER LINE AND OTHER MARKING CONTINIOUS OR INTERMITTEN 10CM. OR 15CM WIDTH ALSO PEDESTRIANS CROSSING STRIPS AS WELL AS SPRAYING FURTHER QUANTITY OF GLASS BEADS OF TYPE IL UNIFORMLY INTO A MONO LAYER ON TO THE HOT PAINT LINE IN QUICK SUCCESSION OF THE PAINT SPRAYING OPRATION @ 250GMS PER SQ.M. AREA AS DIRECTED AND AS PER BS/ MOST SPECIFICATIONS IN WHITE / YELLOW COLOUR. | - | Sq.M | - | - | C622016010 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.35 MB
BOQ_957138.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid