Loading…
Loading…
Tender Value
₹9.8 Cr
EMD Value
₹19.5 L
Closing Date
21 Oct 2026, 2:00 pm
HOS ENGINEERING
IPM SECTION IIT GUWAHATI
Construction of Swimming Pool at IIT Guwahati Campus
2026_IITG_927760_1
IITG/IPM/NIT/C/2026-27/49
Open Tender
Civil Works
Works
450 days
IIT GUWAHATI
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,000
Indian Institute of Technology Guwahati
₹19.5 L
IIT Guwahati
1 Oct 2026
1 Oct 2026
22 Oct 2026
1 Oct 2026
21 Oct 2026
14 Oct 2026
12 Oct 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Sub- Head - I , Earth Work | |||||
| 2Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth. 1.5m in width as well as 10 sqm on plan) including disposal of excavated earth, for all lead and lift as directed by the Engineer in charge | |||||
| 2.01 | All kinds of soil | 4,401 | cum | - | - |
| 3Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, all lift including getting out the excavated soil and disposal of surplus excavated soil as directed, with all lead.. | |||||
| 3.01 | All kinds of soil | 206 | cum | - | - |
| 3.02 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete | 60 | cum | - | - |
| 3.03 | Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. | 6,000 | cum | - | - |
| 3.04 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, all lead upto 50M .and all lift as directed by the Engineer in charge | 4,607 | cum | - | - |
| 4Sub - Head - II , Concrete Work | |||||
| 5Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : | |||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.49 MB
BOQ_974958.xls
BOQ • 0.89 MB
NIT.pdf
Tender Documents • 2.01 MB
Drawings.pdf
Additional Documents • 1.45 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .