| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.5 CrAccepted-AOC | ₹17.5 Cr | L1 | Accepted-AOC Accept |
| 2 | L2₹18.4 CrRejected-AOC | ₹18.4 Cr | L2 | Rejected-AOC Accept |
| 3 | L3₹18.5 CrRejected-AOC ADD 86 NEAR MAHILA DAK BANGLA RAOD SADAR LAIN BAZAR KANHAIPUR DISTRICT JAUNPUR | KANHAIPUR | JAUNPUR | UTTAR PRADESH | ₹18.5 Cr | L3 | Rejected-AOC Accept |
| 4 | Rejected-Technical 15 SHIVPURAM TRIVENI NAGAR III SITAPUR ROAD LUCKNOW | LUCKNOW | LUCKNOW | UTTAR PRADESH | - | - | Rejected-Technical Reject |
Tender Value
₹18.5 Cr
EMD Value
₹37.0 L
Closing Date
8 May 2026, 2:00 pmClosed
General Manager, Zone-1, Prayagraj
General Manager, Zone-1, U. P. Projects Corporation Ltd. 230 /1A, Mehdaury, Telirayganj District-Prayagraj.
Construction of New OPD Block and Site Development Work in the Premises of Lal Bahadur Shastri Hospital, Ramnagar, District-Varanasi (U.P.)
2026_UPPRC_1144429_1
127/UPPCL/GM-1/ETENDER/2025-26 Dated-25.03.2026
Open Tender
Civil Works - Buildings
Percentage
540 days
District-Varanasi (U.P.)
Please refer Tender documents.
2 documents required · 2 mandatory
₹17,700
₹37.0 L
8 Jul 2026
2 May 2026
8 May 2026
2 May 2026
8 May 2026
2 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of New OPD Block and Site Development Work in the Premises of Lal Bahadur Shastri Hospital, Ramnagar, District-Varanasi (U.P.) | - | - | - | - |
| 2 | (Civil work) | - | - | - | - |
| 3 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | - | cum | 187.19 | - |
| 4 | Extra for every additional lift of 1.5 m or part thereof in excavation / banking excavated or stacked materials. All kinds of soil | 1 | cum | 91.19 | ₹91.1 |
| 5 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and for all lift. | - | cum | 140.95 | - |
| 6 | Excavating, supplying, stacking and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in foundation trenches, plinth, sides of foundation etc. complete for all lift. | - | cum | 503.76 | - |
| 7 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | 1 | cum | 1,527.29 | ₹1,525.76 |
| 8 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | - | cum | 4,898.85 | - |
| 9 | Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete. Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 1.10 times of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement. All works upto plinth level Concrete of M25 grade with minimum cement content of 330 kg /cum | - | cum | 6,835.34 | - |
| 10 | Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete. Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 1.10 times of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement. All works upto plinth level Concrete of M25 grade with minimum cement content of 330 kg /cum | - | cum | 7,091.11 | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.36 MB
BIDDOC127.pdf
Tender Documents • 21.37 MB
BOQ_2138257.xls
BOQ • 1.19 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].