Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹29.5 LAdmitted-Finance | -1.10% | ₹29.5 L | L1 | Admitted-Finance |
| 2 | L2₹29.7 L+₹20,900.92 (0.71%)Admitted-Finance | -0.40% | ₹29.7 L+₹20,900.92 (0.71%) | L2 | Admitted-Finance |
Tender Value
₹29.9 L
EMD Value
₹3.0 L
Closing Date
3 Aug 2026, 3:00 pmClosed
chief engineer
chief engineer
Construction of RCC nala with cover from dhamola nadi to honda work shop in link road ward no. 52
2026_NNSAH_1170248_1
6150 B
Open Tender
Civil Works
Percentage
30 days
saharanpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,298
₹3.0 L
9 Sept 2026
20 Jul 2026
4 Aug 2026
20 Jul 2026
3 Aug 2026
20 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismenteling of old brick work or stone work including labour T&P etc all complete | 5.18 | cum | 400 | ₹2,072 |
| 2 | Dwater wate up to deep groung level rate in all work complete | 30 | No | 2,601 | ₹78,030 |
| 3 | Excavation in foundation in ordinary soil (Loam, clay or sand) Including lift upto 1.50 M and lead upto 30 M and including filing watering and rammind of excacated earth into the treaches or into the space between the building and the sides of foundation trenchs or into the plinth and removal and disposal of surplus earth as directed by the engineer in charge upto a distance of 30 M from the foundation trenches SOR UP PWD S1-251A) | 598.5 | cum | 90 | ₹53,865 |
| 4 | Extra rate for earth work and excation in all work complete | 598.5 | Cum | 22.5 | ₹13,466.25 |
| 5 | Disposel of surplus earth malba etc. including all work complete. (anallises Rate) | 478.8 | cum | 130 | ₹62,244 |
| 6 | Supply and laying of 40 mm thick brick in all work complete | 40.5 | Cum | 800 | ₹32,400 |
| 7 | Supply and filling local send in all work complete | 54 | cum | 380 | ₹20,520 |
| 8 | RCC 1:4:8 cement coarse sand and 4 cm stone grit in all complete | 40.5 | cum | 4,850 | ₹1,96,425 |
| 9 | R.C.C. 1:1.5:3 cement course sand and 20 mm gauge stone grit all work complete | 133.17 | cum | 7,400 | ₹9,85,458 |
| 10 | Mild steel in plain such as RCC and rb in work complete | 10,453.94 | KG | 85.29 | ₹8,91,616.54 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 11.28 MB
BOQ_2195832.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .