Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical The Firm Fulfill the eligibility andd Qualification Criteria |
| 2 | Accepted-Technical | Accepted-Technical The Firm Fulfill the eligibility andd Qualification Criteria |
| 3 | Accepted-Technical | Accepted-Technical The Firm Fulfill the eligibility andd Qualification Criteria |
| 4 | Accepted-Technical | Accepted-Technical The Firm Fulfill the eligibility andd Qualification Criteria |
| 5 | Accepted-Technical | Accepted-Technical The Firm Fulfill the eligibility andd Qualification Criteria |
Tender Value
₹2.9 Cr
EMD Value
₹5.9 L
Closing Date
24 Aug 2026, 6:00 pmClosed
EE
WRD Udaipur
Construction of JHADOL SHAMSHANN KE PASS Anicut Village - JHADOL, G.P. - JHADOL, Teh. - JHADOL, Dist.- Udaipur
2026_WRDAS_582661_1
SE/UDR/03/2026-27
Open Tender
Civil Works
Percentage
548 days
udaipur
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,000
Secretary, RREIS
₹5.9 L
Yes
18 Sept 2026
5 Aug 2026
25 Aug 2026
5 Aug 2026
24 Aug 2026
5 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect Soft / Loose soil | 398 | Cum | 92 | ₹36,616 |
| 2 | Excavation including loading , unloading disposal and dressing of excavated rock within initial lead of 50 m and lift up to 1.5 m in dry or moist including dressing of excavated area,dewatering wherever required complete in all respect. Soft / disintegreted rock | 523 | Cum | 161 | ₹84,203 |
| 3 | Excavation including loading , unloading disposal and dressing of excavated rock within initial lead of 50 m and lift up to 1.5 m in dry or moist including dressing of excavated area,dewatering wherever required complete in all respect. Hard rock not requiring blasting | 611 | Cum | 242 | ₹1,47,862 |
| 4 | Excavation including loading , unloading disposal and dressing of excavated rock within initial lead of 50 m and lift up to 1.5 m in dry or moist including dressing of excavated area,dewatering wherever required complete in all respect. Phylite & other hard rock requiring nominal blasting | 821 | Cum | 346 | ₹2,84,066 |
| 5 | Excavation including loading , unloading disposal and dressing of excavated rock within initial lead of 50 m and lift up to 1.5 m in dry or moist including dressing of excavated area,dewatering wherever required complete in all respect. Hardrock (dry or moist)requiring blasting (where hardness of rock is more than 2)including disposal of excavated material in the designated spoil bank / embankment, dressing of excavated material and dewatering with all leads & lifts of excavation and disposal.The contractor is free to use the usable excavated stone elsewhere for which any transition expenditure & royalties, tax etc if required to be paid then it will be liability of contractor as the cost of usable stone has already been deducted from the rate. | 1,150 | Cum | 467 | ₹5,37,050 |
| 6 | Excavation for foundation of Dam in seams/fault sand atother confined places nearer to Abutment,peir,wingsetc.in hard rock by line drilling/rock breaker including dewatering,disposal,loading,unloading and dressing of excavated material within initial lead of 50m. and lift upto 1.5m complete in all respect. | 314.7 | Cum | 1,302 | ₹4,09,739.4 |
| 7 | Extra lead over item 1&2 disposal of excavated material including loading and unloading wherevere required for lead beyond 250 m and upto 750 m (for average 1/2 Km ) Mixed strata muck | 3,690 | Cum | 18.25 | ₹67,342.5 |
| 8 | Add extra over item No. 1 to 8 for disposal of excavated material above initial lift of 1.5m and for every additional lift of 1.5m or part there of including loading and un- loading wherever required.1st lift | 1,559.03 | Cum | 8.5 | ₹13,251.76 |
| 9 | Preparation of foundation of structure including removal of all loose stones , silt and final washing (b) By compressed air & water under pressure | 1,184 | Sqm. | 70 | ₹82,880 |
| 10 | Providing and Laying in position of Cement concrete Design mix M-15 including leads of all construction materials, plasticizers (if required), curing, compaction and finishing with rendering in cement sand mortar 1:3 ( 1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto (For mix design Cement content considered 320 kg/ cum of concrete) (c) 40mm | 1,100 | Cum | 5,608 | ₹61,68,800 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.06 MB
SENIT03.pdf
Other Document • 1.04 MB
BOQ_1035172.xls
BOQ • 0.41 MB
JHADOLTDFinal.pdf
Tender Documents • 2.83 MB
DIPRNIT03.pdf
PDF • 1.53 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .