| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹53.6 LAdmitted-Fee/PreQual/Technical/Finance | -33.00% | ₹53.6 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹55.9 L+₹2.3 L (4.31%)Admitted-Fee/PreQual/Technical/Finance CATONMENT AREA NEAR KIDS KINGDOM SCHOOL HAZARIBAGH | KHUNTI | JHARKHAND | 835209 | -30.11% | ₹55.9 L+₹2.3 L (4.31%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹57.2 L+₹3.6 L (6.70%)Admitted-Fee/PreQual/Technical/Finance NAROTAND LOKAY GIRIDIH | -28.51% | ₹57.2 L+₹3.6 L (6.70%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹58.6 L+₹5.0 L (9.33%)Admitted-Fee/PreQual/Technical/Finance | -26.75% | ₹58.6 L+₹5.0 L (9.33%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹60.9 L+₹7.3 L (13.6%)Admitted-Fee/PreQual/Technical/Finance | -23.86% | ₹60.9 L+₹7.3 L (13.6%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹80.0 L
EMD Value
₹1.6 L
Closing Date
19 Aug 2026, 12:00 pmClosed
Executive Engineer, Road Division, Giridih
Executive Engineer, Road Division, Giridih
Construction of 840M RCC Drain in 1st Km. of Pachamba-Jamua Road, Under Road Division, Giridih For The Year 2026-27
2026_CECOM_116843_1
RCD/GIRIDIH/935/2026-27
Open Tender
Civil Works
Percentage
90 days
Giridih
Please refer Tender documents.
3 documents required · 3 mandatory
₹10,000
₹1.6 L
20 Aug 2026
6 Aug 2026
20 Aug 2026
6 Aug 2026
19 Aug 2026
6 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Hill Side Drain Clearance
Removal of earth from the choked hill side drain and disposing it on the valley side manually | 1,130 | Rmt | 39.5 | ₹44,635 |
| 2 | Dismantling of flexible pavements Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately By Mechanical means Bituminous courses | 3.85 | Cum | 234 | ₹900.9 |
| 3 | Dismantling of flexible pavements Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately By Mechanical means Granular Courses | 11.55 | Cum | 38.9 | ₹449.3 |
| 4 | Dismantling of Structures (Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres)
Brick work | 140.6 | Cum | 286.3 | ₹40,253.78 |
| 5 | Dismantling of Structures (Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres)
RCC m20 AND ABOVE | 47.32 | Cum | 887 | ₹41,972.84 |
| 6 | Excavation for strucutres
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. | 1,006.95 | Cum | 57.4 | ₹57,798.93 |
| 7 | Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. | 100.38 | Cum | 3,727.1 | ₹3,74,126.3 |
| 8 | Plain/Reinforced cement concrete in sub-strucutre complete as per drawing and Technical specifications
RCC Grade M20
Height upto 5m
RCC Grade M20 using batching plant, transit mixer & concrete pump | 348.76 | Cum | 4,606.48 | ₹16,06,555.96 |
| 9 | Furnishing and Placing Reinforced/ Prestressed cement concrete in super-structure as per drawing and Technical Specification
RCC Grade M30 Using Batching Plant,Transite Mixer and Concrete Pump
.Height upto 5m | 133.83 | Cum | 5,495.94 | ₹7,35,521.65 |
| 10 | Supplying, fitting and placing HYSD bar reinforcement in sub structure complete as per drawing and technical specifications | 1 | MT | 88,194.51 | ₹88,106.32 |
stage.html
html • 0.02 MB
finance_157949.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.38 MB
F2BiddingDocument.pdf
Tender Documents • 8.79 MB
BOQ_157949.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .