Loading…
Loading…
Tender Value
₹63.2 L
EMD Value
₹79,000
Closing Date
6 Aug 2026, 11:00 am
Staff Officer Mining SECL Korba Area
Staff Officer Mining SECL Korba Area
Construction of 08 Nos. air crossing for G-III bottom seam at Bagdewa UG Mine.
2026_SECL_362352_1
SECL/GM/KB/SO(M)/eNIT/26-27/29 dt 21.07.26
Open Tender
Civil Works - Buildings
Item Rate
120 days
Korba
As per NIT
5 documents required · 5 mandatory
₹79,000
22 Jul 2026
22 Jul 2026
7 Aug 2026
22 Jul 2026
6 Aug 2026
23 Jul 2026
22 Jul 2026 - 30 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Groove cutting in roof/ floor (Hard Stone) for Stopping & Manhole by using chisel & hammer and removal of excavated cuttings up to a distance of 30m. Materials (i.e. hand shovel, hammer etc.) will be provided by the colliery management. (for underground) | 15.12 | Cubic Meter | 6,981.72 | ₹1,05,563.61 |
| 2 | Groove cutting in roof/ floor (Coal) for Stopping & Manhole by using chisel & hammer and removal of excavated cuttings up to a distance of 30m. Materials (i.e. hand shovel, hammer etc.) will be provided by the colliery management. (for underground) | 14.08 | Cubic Meter | 2,480.95 | ₹34,931.78 |
| 3 | Loading of material (Cement) into tub on surface within a lead of 50m. | 36.12 | Metric Tonnes | 230.48 | ₹8,324.94 |
| 4 | Loading of material (Sand) into tub on surface within a lead of 50m. | 87.19 | Cubic Meter | 397.81 | ₹34,685.05 |
| 5 | Loading of material (Stone aggregate below 40mm nominal size) into tub on surface within a lead of 50m. | 37.27 | Cubic Meter | 397.81 | ₹14,826.38 |
| 6 | Loading of material (Steel) into tub on surface within a lead of 50m. | 2.74 | Metric Tonnes | 230.48 | ₹631.75 |
| 7 | Loading of material (Bricks) into tub on surface within a lead of 50m. | 126.08 | Thousand | 742.46 | ₹93,609.36 |
| 8 | Unloading of material (Cement) at destination in U/G within a lead of 50m. (For each additional lead of 50 m subject to 0.50 Km maximum, there will 14.67% increase in rate) | 36.12 | Metric Tonnes | 209.17 | ₹7,555.22 |
| 9 | Unloading of material (Sand) at destination in U/G within a lead of 50m. (For each additional lead of 50 m subject to 0.50 Km maximum, there will 14.67% increase in rate) | 87.19 | Cubic Meter | 361.04 | ₹31,479.08 |
| 10 | Unloading of material (Stone aggregate below 40mm nominal size) at destination in U/G within a lead of 50m. (For each additional lead of 50 m subject to 0.50 Km maximum, there will 14.67% increase in rate) | 37.27 | Cubic Meter | 361.04 | ₹13,455.96 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 1.34 MB
Tendernotice_2.pdf
PDF • 0.43 MB
Tendernotice_3.pdf
PDF • 0.84 MB
BOQ_375252.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].