| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹93.4 LAdmitted-Finance | ₹93.4 L | L1 | Admitted-Finance |
| 2 | L2₹95.5 L+₹2.1 L (2.23%)Admitted-Finance | ₹95.5 L+₹2.1 L (2.23%) | L2 | Admitted-Finance |
| 3 | Rejected-Technical | - | - | Rejected-Technical Techno commercially non-responsive |
| 4 | Rejected-Technical | - | - | Rejected-Technical Techno commercially non-responsive |
| 5 | Rejected-Technical | - | - | Rejected-Technical Techno commercially non-responsive |
| Sl No | Description | Qty | Unit | Bishnu Chettri L1 | KHALING ENTERPRISES L2 |
|---|---|---|---|---|---|
| 1.00 | Excavation of materials from river bed / stoney soil as noted below as per designed section and throwing the spoils for making banks as profile or to deposit the same in any other place as directed by the Engineer-incharge for making embankment within a lead of 50 metre and lift upto 4 metre. including dressing etc. complete. (Work is to be done with mechanical devices) (b) Boulder, shingles, sand debries, having size above 20 cm. upto 40 cm. more than 30% and upto 40% by volume (as per visual estimation) including removing roots and stumps of trees and minings, cost of profiling, channel crossing etc. complete. | 855 | Cum | 152.69 ₹1,30,549.95 Lowest | 160 ₹1,36,800 |
| 2.00 | Weaving wire mattress as directed with wire of 4mm dia. and making sausage crate of required shape after tying all intersections including joining longitudinal ends, closing ends of sausage, carriage of wire to site of work complete in all respect as per direction of the Engineer-in-charge including cost of supply of G.I. wire. (With 100mm x 100mm mesh.) | 4,500 | Sqm | 200.57 ₹9,02,565 Lowest | 205 ₹9,22,500 |
| 3.00 | Filling properly the empty sausage crates with boulders of any size & shape with hand packing after preparation of bed of placement, placing the crate in position, carriage of boulders from road stacks with a lead upto 150m etc. complete in all respect including stitching the rest of the crate with wire (passage for filling boulders) after filling up the crate with boulders and launching the crate in position if necessary and as directed by the Engineer-in charge. [Rate provided is exclusive of the cost of stone boulders and sausage crate] | 1,125 | Cum | 425.1 ₹4,78,237.5 Lowest | 434 ₹4,88,250 |
| 4.00 | COST OF STONE AGGREGATES AT QUARRY SITES - Boulder above 225 mm | 1,125 | Cum | 291.38 ₹3,27,802.5 Lowest | 297 ₹3,34,125 |
| 5.00 | Carriage of Brick-bats, Boulder, Stone metal, Stone chips, Gravel, Slag metal, Shingle and similar miscellaneous materials over pucca road. From udlabari to TLDP -3, Upto 50km | 1,125 | Cum | 846.2 ₹9,51,975 Lowest | 865 ₹9,73,125 |
| 6.00 | Hire and labour charges for Shuttering with or without staging upto 4.0 m height using approved stout props with wooden planks/ply wood/steel sheet plate with required bracing for any kind of plain or reinforced concrete works in all sorts of minor structure including culvert, box culvert, crossdrain etc. The rate is inclusive of fitting, fixing and striking out after completion of work as per specification and direction. Where staging is not required. | 1,994.55 | Sqm | 213.55 ₹4,25,936.15 Lowest | 218 ₹4,34,811.9 |
| 7.00 | Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground floor as per relevant IS codes. River bazree. | 360 | Cum | 5,297.74 ₹19,07,186.4 Lowest | 5,415 ₹19,49,400 |
| 8.00 | Plum concrete work with 40 % cement concrete with 30 mm down graded stone metal and 60 % stone boulder of size 150 mm and above, placed in position as directed excluding shuttering if any. (i) (1:3:6) proportion. | 1,280 | Cum | 3,297 ₹42,20,160 Lowest | 3,370 ₹43,13,600 |
Tender Value
₹1.1 Cr
EMD Value
₹2.2 L
Closing Date
15 Feb 2025, 5:00 pmClosed
DGM
CONTRACT DIVISION, TLD-III PS, RAMBI, DARJEELING
RRT protection work between Community hall to Peshok Jhora below Teesta Bazar area at LTD-III Power Station
2025_NHPC_846174_1
NH/TLD-III PS/Cont./F-1173/242
Open Tender
Civil Works
Works
75 days
TLD-III PS, RAMBI, DARJEELING
Please refer Tender documents.
8 documents required · 8 mandatory
₹1,180
NHPC LIMITED
₹2.2 L
17 Apr 2025
26 Jan 2025
19 Feb 2025
26 Jan 2025
15 Feb 2025
26 Jan 2025
Amount
Excavation of materials from river bed / stoney soil as noted below as per designed section and throwing the spoils for making banks as profile or to deposit the same in any other place as directed by the Engineer-incharge for making embankment within a lead of 50 metre and lift upto 4 metre. including dressing etc. complete. (Work is to be done with mechanical devices) (b) Boulder, shingles, sand debries, having size above 20 cm. upto 40 cm. more than 30% and upto 40% by volume (as per visual estimation) including removing roots and stumps of trees and minings, cost of profiling, channel crossing etc. complete.
Weaving wire mattress as directed with wire of 4mm dia. and making sausage crate of required shape after tying all intersections including joining longitudinal ends, closing ends of sausage, carriage of wire to site of work complete in all respect as per direction of the Engineer-in-charge including cost of supply of G.I. wire. (With 100mm x 100mm mesh.)
Filling properly the empty sausage crates with boulders of any size & shape with hand packing after preparation of bed of placement, placing the crate in position, carriage of boulders from road stacks with a lead upto 150m etc. complete in all respect including stitching the rest of the crate with wire (passage for filling boulders) after filling up the crate with boulders and launching the crate in position if necessary and as directed by the Engineer-in charge. [Rate provided is exclusive of the cost of stone boulders and sausage crate]
COST OF STONE AGGREGATES AT QUARRY SITES - Boulder above 225 mm
Carriage of Brick-bats, Boulder, Stone metal, Stone chips, Gravel, Slag metal, Shingle and similar miscellaneous materials over pucca road. From udlabari to TLDP -3, Upto 50km
Hire and labour charges for Shuttering with or without staging upto 4.0 m height using approved stout props with wooden planks/ply wood/steel sheet plate with required bracing for any kind of plain or reinforced concrete works in all sorts of minor structure including culvert, box culvert, crossdrain etc. The rate is inclusive of fitting, fixing and striking out after completion of work as per specification and direction. Where staging is not required.
Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground floor as per relevant IS codes. River bazree.
Plum concrete work with 40 % cement concrete with 30 mm down graded stone metal and 60 % stone boulder of size 150 mm and above, placed in position as directed excluding shuttering if any. (i) (1:3:6) proportion.
KHALING ENTERPRISES (BID ID -3172058)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.06 MB
BOQ_889479.xls
BOQ • 0.31 MB
TD.pdf
Tender Documents • 3.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .