Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.8 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹4.5 L+₹69,050 (18.0%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹4.8 L+₹93,380 (24.3%)Admitted-Finance | L3 | Admitted-Finance | |
| 4 | L4₹5.3 L+₹1.5 L (39.1%)Admitted-Finance SC 79 A SHASTRI NAGAR THANA KAVINAGAR GHAZIABAD UTTAR PRADESH 201001 | GHAZIABAD | GHAZIABAD | UTTAR PRADESH | 201001 | L4 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S RINKU CONTRACTOR L2 | M/S SHREE JEE CONSTRUCTIONS L3 | M/S SANDHYA CONSTRUCTION L1 | Hariom Sharma L4 |
|---|---|---|---|---|---|---|---|
| 1.00 | Silt clearance by hydraulic excavator/ JCB including lift upto 1.50 M and lead upto 6.0 M i/c cost of driver/assistant driver, POL, maintenance of machine, contractor profit, taxes etc including levelling & dressing as per direction of Engineer in Charge. | 8,120 | Cum | 41 ₹3,32,920 | 42 ₹3,41,040 | 30.5 ₹2,47,660 Lowest | 47 ₹3,81,640 |
| 2.00 | Scrapping internal section of existing channel i.e. bed and slopes with silt up to 5.0 cm as per direction of Engineer in Charge. | 22,570 | Cum | 4 ₹90,280 Lowest | 4.5 ₹1,01,565 | 4.5 ₹1,01,565 | 5 ₹1,12,850 |
| 3.00 | Uprooting jhunds including back filling and dressing as per direction of Engineer in Charge. | 985 | Sqm | 30 ₹29,550 Lowest | 35 ₹34,475 | 35 ₹34,475 | 40 ₹39,400 |
Tender Value
₹4.9 L
EMD Value
₹9,860
Closing Date
26 Sept 2026, 1:00 pmClosed
EE BGGC BSR
EE BGGC BSR
Silt Clearance of Jarcha Dy. From Km. 0.000 to 9.700
2026_UPIDC_1188144_24
04/EE/2026-27
Open Tender
Civil Works
Item Rate
30 days
Ghaziabad
Please refer Tender documents.
2 documents required · 2 mandatory
₹266
₹9,860
1 Oct 2026
21 Sept 2026
26 Sept 2026
21 Sept 2026
26 Sept 2026
21 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Silt clearance by hydraulic excavator/ JCB including lift upto 1.50 M and lead upto 6.0 M i/c cost of driver/assistant driver, POL, maintenance of machine, contractor profit, taxes etc including levelling & dressing as per direction of Engineer in Charge. | 8,120 | Cum | - | - |
| 2 | Scrapping internal section of existing channel i.e. bed and slopes with silt up to 5.0 cm as per direction of Engineer in Charge. | 22,570 | Cum | - | - |
| 3 | Uprooting jhunds including back filling and dressing as per direction of Engineer in Charge. | 985 | Sqm | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.90 MB
BOQ_2238184.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .