Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
Refer Docs
EMD Value
₹50,000
Closing Date
11 Dec 2026, 5:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
CHAIRMAN, KHIRPAI MUNICIPALITY
KHIRPAI
Operation and maintenance work of existing water supply system within 10 wards of Khirpai Municipality
2026_MAD_1050155_1
WBMAD/ULB/WATER/CM/26-27/NIQ-4
Open Tender
CIVIL WORKS
Item Rate
365 days
WITHIN MUNICIPAL AREA
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹50,000
Yes
25 Nov 2026
25 Nov 2026
14 Dec 2026
25 Nov 2026
11 Dec 2026
25 Nov 2026
270 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Repairing the bursting/damage/leakage with supplying, fittinh and fixing MJ collar, rubber gasket and others necessary fittings of DI pipeline with MJ Collar including excavation of earth through any kind of soil and road materials upto 1.500m depth, 1.200m width & 1.800m length and tracing out the actual position of burst/leak, cutting pipe of required length , refilling the same with new pipes and old/new detachable joints after chiseling and sharpening the pipe, bailing out water from the trenches, complete with leak proof condition and refilling the trenches to its original condition all complete as per direction of EIC 100 mm | 1 | Nos | - | - |
| 1.02 | Repairing the bursting/damage/leakage with supplying, fittinh and fixing MJ collar, rubber gasket and others necessary fittings of DI pipeline with MJ Collar including excavation of earth through any kind of soil and road materials upto 1.500m depth, 1.200m width & 1.800m length and tracing out the actual position of burst/leak, cutting pipe of required length , refilling the same with new pipes and old/new detachable joints after chiseling and sharpening the pipe, bailing out water from the trenches, complete with leak proof condition and refilling the trenches to its original condition all complete as per direction of EIC 150 mm | 1 | Nos | - | - |
| 1.03 | Repairing the bursting/damage/leakage with supplying, fittinh and fixing MJ collar, rubber gasket and others necessary fittings of DI pipeline with MJ Collar including excavation of earth through any kind of soil and road materials upto 1.500m depth, 1.200m width & 1.800m length and tracing out the actual position of burst/leak, cutting pipe of required length , refilling the same with new pipes and old/new detachable joints after chiseling and sharpening the pipe, bailing out water from the trenches, complete with leak proof condition and refilling the trenches to its original condition all complete as per direction of EIC 200 mm | 1 | mm | - | - |
| 1.04 | Repairing of UPVCHDPE pipes by using UPVC/HDPE collar socket and solvent cement including earthwork in excavation with dewatering and necessary tracing out the actual position of bursting/leakage, cutting the pipe to required length in the trenches and replacing the same with new pipe including fitting, fixing after roughening the UPVC surface & supplying and applying solvent cement, backfilling the trenches with excavated earth upto 1.5m the same as per direction of EIC all complete (UPVC/HDPE pipes and specials, solvent cement to be supplied by the agency) unservicible broken withdrawn surplus materials are vto be deposited to deptt store. 100mm dia | 1 | km | - | - |
| 1.05 | Opening and closing of all the different dia sluice valves / end cap (100mm/150mm) dia on different places as and when required for cleaning the pipeline all complete with leak proof condition, restoration works to be done including earthwork in excavation , bailing out water, re-filling the excavated earth, taking out RCC slab or slab cover refixing true position | 1 | KK | - | - |
| 1.06 | Changing of gland packing of sluice valve with supplying of gland packing, grease etc bailing out of water including removing the top cover slab ov valve chamber and refixing the same after completion with leak proof condition. | 1 | Nos | - | - |
| 1.07 | Cleaning of ferrule of stand post connection after excavation through any kind of soil and road materials up to 1500mm depth. with all new fittings with ferrule. Plugging hole of old main with G.I. plug. Drilling and tapping . refixing the ferrule on the new main with serviceable old G.I pipes and other specials (New G.l. pipes and other specials, if required to be installed supplied by contractor) and back filling the trench with excavated materials all complete as per specification and direction of the Engineer- in-charge. | 1 | Nos | - | - |
| 1.08 | Jointing of HDPE pipes of any dia with Existing DI pipe or Jointing of DI pipes with another DI pipes or jointing of HDPE pipes with existing HDPE pipes with supplying, fitting and fixing MJ collar, TEE, rubber gasket and others necessary fittings of DI/HDPE pipeline with Collar joint including excavation of earth through any kind of soil and road materials cutting pipe of required length , refilling the same with new pipes and old/new detachable joints after chiseling and sharpening the pipe, bailing out water from the trenches, complete with leak proof condition and refilling the trenches to its original condition all complete as per direction of EIC | 1 | Nos | - | - |
| 1.09 | Development of existing tube well by using suitable capacity air compressor, including lowering and operating the air pipe, surging and flushing of the tube well by compressed air to remove sand, silt, clay and other suspended impurities from the well, and continuous operation of the compressor for the required period till the well is fully developed and discharge becomes substantially free from sand and other impurities. The work shall include hire and labour charges of air compressor, generator/engine, fuel, operator, necessary pipes, hoses, tools, tackles, accessories and all other incidental arrangements required for satisfactory completion of the work, including measurement of water yield by V-notch or any other approved method, all complete as per direction and satisfaction of the Engineer-in-Charge. | 1 | hrs | - | - |
| 1.1 | Replacement of GI bib cock for street tap at various location within Khirpai Municipality | 1 | hrs | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 8.84 MB
BOQ_2569739.xls
BOQ • 0.39 MB
WestBengalForm.pdf
Tender Documents • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .