Loading…
Loading…
Tender Value
₹13.0 Cr
EMD Value
₹9.8 L
Closing Date
5 Sept 2026, 6:00 pm
Chief Engineer Bhopal Zone
HQ, Chief Engineer, Bhopal Zone, Military Engineer Services, Bhopal-462001
PROVN OF OTM ACCN RAPID PRO UNIT AT SAUGOR MILITARY STATION
2026_MES_781871_1
CEBZ/SAG/TOKEN/07 OF 2026-27
Open Tender
Civil Works
Lump-sum
540 days
Saugor
As per NIT Documents
5 documents required · 5 mandatory
₹3,000
GE Saugor
₹9.8 L
Bhopal
30 Jul 2026
30 Jul 2026
7 Sept 2026
30 Jul 2026
5 Sept 2026
28 Aug 2026
18 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 2GENERAL SUMMARY | |||||
| 3Sch 'A' Part - I (A) (Building Works) (To be quoted by contractor based on Design & Built) | |||||
| 3.01 | Design and Built for construction of block of JCO's Mess and Club (S/S) at location specified on site plan and as per parameters / specification provided in DBR & Particular Specification (PS)
Note:
(i) The complete design of the bldgs mentioned under Sch ‘A’ Part-I shall be carried out and the design and drawings shall got vetted from any IIT & also refer scope of work mentioned in Sch 'A' Notes and details of scope under Phase-I, Phase-II and Phase- III. Contractor shall also submit detailed estimate alongwith yard stick for approval by CWE as per Annex 'B' to Sch 'A' Notes and shall be deemed to include in quoted lump sum. | 1 | Each Block | - | - |
| 3.02 | Design and Built for construction of block of Single Living JCO's Accn (S/S) at location specified on site plan and as per parameters / specification provided in DBR & Particular Specification (PS)
Note:
(i) The complete design of the bldgs mentioned under Sch ‘A’ Part-I shall be carried out and the design and drawings shall got vetted from any IIT & also refer scope of work mentioned in Sch 'A' Notes and details of scope under Phase-I, Phase-II and Phase- III. Contractor shall also submit detailed estimate alongwith yard stick for approval by CWE as per Annex 'B' to Sch 'A' Notes and shall be deemed to include in quoted lump sum. | 1 | Each Block | - | - |
| 3.03 | Design and Built for construction of block of Dining Hall (S/S) at location specified on site plan and as per parameters / specification provided in DBR & Particular Specification (PS)
Note:
(i) The complete design of the bldgs mentioned under Sch ‘A’ Part-I shall be carried out and the design and drawings shall got vetted from any IIT & also refer scope of work mentioned in Sch 'A' Notes and details of scope under Phase-I, Phase-II and Phase- III. Contractor shall also submit detailed estimate alongwith yard stick for approval by CWE as per Annex 'B' to Sch 'A' Notes and shall be deemed to include in quoted lump sum. | 1 | Each Block | - | - |
| 3.04 | Design and Built for construction of block of cook House (S/S) at location specified on site plan and as per parameters / specification provided in DBR & Particular Specification (PS)
Note:
(i) The complete design of the bldgs mentioned under Sch ‘A’ Part-I shall be carried out and the design and drawings shall got vetted from any IIT & also refer scope of work mentioned in Sch 'A' Notes and details of scope under Phase-I, Phase-II and Phase- III. Contractor shall also submit detailed estimate alongwith yard stick for approval by CWE as per Annex 'B' to Sch 'A' Notes and shall be deemed to include in quoted lump sum. | 1 | Each Block | - | - |
| 3.05 | Design and Built for construction of block of Single Living Accn ORs (D/S) at location specified on site plan and as per parameters / specification provided in DBR & Particular Specification (PS)
Note:
(i) The complete design of the bldgs mentioned under Sch ‘A’ Part-I shall be carried out and the design and drawings shall got vetted from any IIT & also refer scope of work mentioned in Sch 'A' Notes and details of scope under Phase-I, Phase-II and Phase- III. Contractor shall also submit detailed estimate alongwith yard stick for approval by CWE as per Annex 'B' to Sch 'A' Notes and shall be deemed to include in quoted lump sum. | 1 | Each Block | - | - |
| 3.06 | Design and Built for construction of block of Parking shed for OR single living (S/S) at location specified on site plan and as per parameters / specification provided in DBR & Particular Specification (PS)
Note:
(i) The complete design of the bldgs mentioned under Sch ‘A’ Part-I shall be carried out and the design and drawings shall got vetted from any IIT & also refer scope of work mentioned in Sch 'A' Notes and details of scope under Phase-I, Phase-II and Phase- III. Contractor shall also submit detailed estimate alongwith yard stick for approval by CWE as per Annex 'B' to Sch 'A' Notes and shall be deemed to include in quoted lump sum. | 1 | Each Block | - | - |
| 3.07 | Design and Built for construction of block of Baggage Room (S/S) at location specified on site plan and as per parameters / specification provided in DBR & Particular Specification (PS)
Note:
(i) The complete design of the bldgs mentioned under Sch ‘A’ Part-I shall be carried out and the design and drawings shall got vetted from any IIT & also refer scope of work mentioned in Sch 'A' Notes and details of scope under Phase-I, Phase-II and Phase- III. Contractor shall also submit detailed estimate alongwith yard stick for approval by CWE as per Annex 'B' to Sch 'A' Notes and shall be deemed to include in quoted lump sum. | 1 | Each Block | - | - |
| 3.08 | Design and Built for construction of block of office & Adm Accn (D/S) at location specified on site plan and as per parameters / specification provided in DBR & Particular Specification (PS)
Note:
(i) The complete design of the bldgs mentioned under Sch ‘A’ Part-I shall be carried out and the design and drawings shall got vetted from any IIT & also refer scope of work mentioned in Sch 'A' Notes and details of scope under Phase-I, Phase-II and Phase- III. Contractor shall also submit detailed estimate alongwith yard stick for approval by CWE as per Annex 'B' to Sch 'A' Notes and shall be deemed to include in quoted lump sum. | 1 | Each Block | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.22 MB
PDF.pdf
Tender Documents • 3.01 MB
BOQ_875893.xls
BOQ • 0.86 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].