Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.7 LAccepted-AOC | 1 | Accepted-AOC Low | |
| 2 | Rejected-Technical | - | Rejected-Technical High Value |
| Sl No | Description | Qty | Unit | R Saravanan L2 | SRI SOUNTHARI TRADERS AND BUILDERS L1 |
|---|---|---|---|---|---|
| 1.00 | Earthwork excavating and depositing on bank with an initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth shales, muram, graverl stoney earth & earth mixed with small size boulders & hard gravelly soil as per S.S 20B as Per Standard Specification. | 39 | m3 | 190 ₹7,410 | 184 ₹7,176 Lowest |
| 2.00 | Plain Cement Concrete 1:4:8 Mix (one part cement, Four part sand and Eight part of aggrigate) using 40mm size ISS HBG metal machine crushed from approved quarry including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing etc. complete. Complying with std. specifications.as Per Standard Specification. | 8.5 | m3 | 5,000 ₹42,500 | 4,975 ₹42,287.5 Lowest |
| 3.00 | Supplying and erecting centering for sides and soffits including supports and strutting upto 3.00m height for plane surface such as RCC Slab, Rectangular Beams, Tee (or) ELL Beams, Lintel Bed Block, Slabs, Landing Slabs, Beams Canopy, Side Slab (or) Square (or) Round columns etc., as detailed below with all cross branching using M.S. Sheets of size 80cm x 60cm and B.G. 10 stiffended with welded M.S. Angles of size 25 x 25 x 3mm for boarding laid over silver oak or country wood joints of 10cm to 30cm to dia spaced at 75cm c/c etc., complete complying with standard specifications as directed by departmental officers etc., complete.as Per Standard Specification. | 144 | m2 | 500 ₹72,000 | 459 ₹66,096 Lowest |
| 4.00 | Plain Cement Concrete 1:2:4 Mix (one part cement, two part sand and four part of aggrigate) using 20mm size ISS HBG metal machine crushed from approved quarry including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing etc. complete. Complying with std. specifications. | 17.5 | m3 | 6,500 ₹1,13,750 | 6,425 ₹1,12,437.5 Lowest |
| 5.00 | Supplying, fabricating and placing in position mild steel or ribbed tor steel for all reinforced cement concrete works as per design given including cost of steel and binding wire with all conveyance and lead charges in all floors etc.complete complying with standard specifications and as directed by the deparmental engineers. TNBP No:30 | 200 | Kg | 90 ₹18,000 | 89 ₹17,800 Lowest |
| 6.00 | Reinforced Cement Concrete 1:1½:3 Mix (One Part of cement, one and half Part of M- Sand and three Part of aggregate)using 20mm size ISS HBG metal machine crushed from approved quarry including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing but excluding cost of reinforcement etc. Complete with std. Specifications. TNDSS NO: 30 V, VI (S3), VII-3. | 2 | m3 | 8,000 ₹16,000 | 7,976 ₹15,952 Lowest |
| 7.00 | Finishing the top of flooring with granolethic floor finish in cement concrete 1:2:4 mix using 10-12mm ISS metal to 25mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying, curing etc complete | 34.5 | m2 | 160 ₹5,520 | 155 ₹5,347.5 Lowest |
Tender Value
₹3.3 L
EMD Value
₹3,300
Closing Date
22 Aug 2025, 3:00 pmClosed
Executive Officer
Kamarjar Road
construction of storm water drain at vinayagar koil street and dhanalakshmi nagar in arakandanallur townpanchayat
2025_DTP_595534_1
205-3/2025
Open Tender
Civil Works
Works
arakandanallurtownpanchayat
pre qualification document
2 documents required · 2 mandatory
₹330
₹3,300
Yes
29 Aug 2025
21 Aug 2025
22 Aug 2025
21 Aug 2025
22 Aug 2025
21 Aug 2025
Amount
Earthwork excavating and depositing on bank with an initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth shales, muram, graverl stoney earth & earth mixed with small size boulders & hard gravelly soil as per S.S 20B as Per Standard Specification.
Plain Cement Concrete 1:4:8 Mix (one part cement, Four part sand and Eight part of aggrigate) using 40mm size ISS HBG metal machine crushed from approved quarry including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing etc. complete. Complying with std. specifications.as Per Standard Specification.
Supplying and erecting centering for sides and soffits including supports and strutting upto 3.00m height for plane surface such as RCC Slab, Rectangular Beams, Tee (or) ELL Beams, Lintel Bed Block, Slabs, Landing Slabs, Beams Canopy, Side Slab (or) Square (or) Round columns etc., as detailed below with all cross branching using M.S. Sheets of size 80cm x 60cm and B.G. 10 stiffended with welded M.S. Angles of size 25 x 25 x 3mm for boarding laid over silver oak or country wood joints of 10cm to 30cm to dia spaced at 75cm c/c etc., complete complying with standard specifications as directed by departmental officers etc., complete.as Per Standard Specification.
Plain Cement Concrete 1:2:4 Mix (one part cement, two part sand and four part of aggrigate) using 20mm size ISS HBG metal machine crushed from approved quarry including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing etc. complete. Complying with std. specifications.
Supplying, fabricating and placing in position mild steel or ribbed tor steel for all reinforced cement concrete works as per design given including cost of steel and binding wire with all conveyance and lead charges in all floors etc.complete complying with standard specifications and as directed by the deparmental engineers. TNBP No:30
Reinforced Cement Concrete 1:1½:3 Mix (One Part of cement, one and half Part of M- Sand and three Part of aggregate)using 20mm size ISS HBG metal machine crushed from approved quarry including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing but excluding cost of reinforcement etc. Complete with std. Specifications. TNDSS NO: 30 V, VI (S3), VII-3.
Finishing the top of flooring with granolethic floor finish in cement concrete 1:2:4 mix using 10-12mm ISS metal to 25mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying, curing etc complete
R Saravanan (BID ID -1436991)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_711673.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .