| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹67.2 LAccepted-AOC | ₹67.2 L | L1 | Accepted-AOC L1 BID |
| 2 | L2₹67.5 L+₹22,759.61 (0.34%)Rejected-Finance BARAMATI TAL BARAMATI DIST PUNE | PUNE | MAHARASHTRA | 410301 | ₹67.5 L+₹22,759.61 (0.34%) | L2 | Rejected-Finance L1 IS BID ACCEPTED |
| 3 | L3₹68.3 L+₹1.1 L (1.58%)Rejected-Finance | ₹68.3 L+₹1.1 L (1.58%) | L3 | Rejected-Finance L1 IS BID ACCEPTED |
| 4 | L4₹69.0 L+₹1.7 L (2.60%)Rejected-Finance | ₹69.0 L+₹1.7 L (2.60%) | L4 | Rejected-Finance L1 IS BID ACCEPTED |
| 5 | L5₹70.8 L+₹3.6 L (5.30%)Rejected-Finance MU PO NIMGAON KETKI TA INDAPUR DIST PUNE 413120 | INDAPUR | PUNE | MAHARASHTRA | 413120 | ₹70.8 L+₹3.6 L (5.30%) | L5 | Rejected-Finance L1 IS BID ACCEPTED |
Tender Value
Refer Docs
EMD Value
₹84,300
Closing Date
20 Feb 2026, 3:00 pmClosed
chief officer
BARAMATI MUNICIPAL COUNCIL
CONSTRUCTION OF SAMAJIK SABHAGRAHA IN OPEN SPACE OF GAT NO.88 1 2 AT JALOCHI AREA IN BNP LIMIT AT BARAMAT
2026_DMA_1277387_1
BNP/KARYA-17/TENDER/1300/25-26
Open Tender
Civil Works - Buildings
Percentage
270 days
BARAMATI MUNICIPAL COUNCIL
Please refer Tender documents.
8 documents required · 8 mandatory
₹1,180
₹84,300
1 Sept 2026
12 Feb 2026
23 Feb 2026
12 Feb 2026
20 Feb 2026
12 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling the R.C.C. work 1:2:4 and sorting out the materials such as steel etc. as directed and stacking them within the specified lead as directed. | 6.21 | Cum | 1,507.9 | ₹9,364.06 |
| 2 | Excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 metre beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting, dewatering etc. complete. (Lift upto 1.5 metre) by Manual Means. | 223.44 | Cum | 248.35 | ₹55,490.59 |
| 3 | Excavation for foundation in hard murum including removing the excavated material upto distance of 50 metres beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting, dewatering etc. complete. (Lift from 1.5 metre) by Manual Means. | 121.65 | Cum | 379.3 | ₹46,141.13 |
| 4 | Providing and laying Cast in situ/ Ready Mix cement concrete in Mix- 10 of trap/ granite/ quartzite/ gneiss metal for foundation and bedding including bailing out water, formwork, laying/ pumping, compacting, roughening them if special finish is to be provided, finishing if required and curing complete, with Ordinary Concrete mixer, etc. complete. With fine aggregate (Crushed sand V.S.I. Grade). | 92.79 | Cum | 6,444.75 | ₹5,97,986.83 |
| 5 | Conveying the Material | 223.44 | Cum | 185.25 | ₹41,391.71 |
| 6 | Excavation for foundation in Soft rock and old cement or lime masonry foundations including removing the excavated material upto a distance of 50 metres beyond the building area and stacking as directed, including dewatering, preparing the bed for the foundation and necessary back filling with available earth /murum, ramming, watering including shoring and strutting, dewatering etc. complete (lift upto 1.5 metre) by Mechanical Means. | 38.17 | Cum | 445.8 | ₹17,017.65 |
| 7 | Filling in plinth and floors with contractors material/ brought from outside and approved by Engineer incharge in layers of 15 centimetre to 20 centimetre including watering and compaction etc. complete.
Spec. No. : Bd.A. 11/Page No. 263 | 183.29 | Cum | 874.7 | ₹1,60,324.11 |
| 8 | Providing dry/ trap/ granite/ quartzite/ gneiss rubble stone soling 15 centimetre to 20 centimetre thick including hand packing and compacting etc. complete. | 121.45 | Cum | 1,882 | ₹2,28,576.29 |
| 9 | Providing and laying in situ/ Ready Mix cement concrete Mix-25 of trap/ granite/quartzite/ gneiss metal for Reinforced Cement Concrete work in foundations like raft, strip foundations, grillage and footings of Reinforced Cement Concrete columns and steel stanchions etc. including bailing out water, formwork, laying/ pumping cover blocks, compaction and curing roughening the surface if special finish is to be provided, (Excluding reinforcement and structural steel) etc. complete, with fully automatic micro processor based Programmable Logic Controller with Superwisery Control and Data Acquisitionenabled Reversible Drum Type mixer/ concrete Batch Mix plant (Pan mixer) etc. complete, with fine aggregate (Crushed sand V.S.I. Grade). | 26.53 | Cum | 7,335.45 | ₹1,94,606 |
| 10 | Providing and laying Cast in situ/ Ready Mix cement concrete Mix-25 of trap/ granite/ quartzite/ gneiss metal for Reinforced Cement Concrete Slabs and Landings as per detailed designs and drawings including centering, formwork, cover blocks, laying/ pumping, compactionfinishing the formed surfaces with cement mortar 1:3 of sufficient minimum thickness to give a smooth and even surface or roughening if special finish is to be provided and curing etc. complete, (Excluding reinforcement and structural steel) with fully automatic micro processor based Programmable Logic Controller with Superwisery Control and Data Acquisitionenabled Reversible Drum Type mixer/ concrete Batch Mix plant (Pan mixer) etc. complete, with fine aggregate (Crushed sand V.S.I. Grade). | 33.58 | Cum | 13,749.25 | ₹4,61,642.89 |
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.51 MB
BOOKLETSALONIPARK.pdf
Tender Documents • 0.68 MB
BOQ_2197966.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .